ML20059C129

From kanterella
Jump to navigation Jump to search
Corrects Informing That Submittal of Special Rept Re 880115 Valid Failure of Diesel Generator 2B Will Be Delayed Until 880229.Submittal of Rept Originally Scheduled for 880212
ML20059C129
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 02/04/1988
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20059C126 List:
References
NUDOCS 9008310061
Download: ML20059C129 (1)


Text

e

.i Deum Powna Goxmwy r.o. mon asses j

~

c m m erra.n.c.ses4e eu.s.wcasm vue ;

(704) aft >4 ems j

FEBRUARf /4 li W January 4, 1988 1

Document Control Desk

' U. S. Nuclear Regulatory Comission l

Washington, D. C.

20555

Subject:

Catawba Nuclear Station, Unit 1 Docket No. 50-413 gggf @/ gg7 Special Report Concerning a Diesel Generator 2B Valid Failure on January 15, 1988 Gentlemen!

Please be advised that submittal of a Special Report concerning a January 15, j

i 1988 valid f ailure of Diesel Generator 2B will be delayed until Febmanv__26,

~

1988. SubmittalofthisreportwasoriginallyscheduledforGanuary 12, 1988.

j An extension is required to allow Duke Power personnel in charge or m.

Investigation aufficient time to revie' the fallure. This event is reportable pursuant to Technical Specification 3/4.8.1.1.3 and 6.9.2.

Very truly yours,

,P Hal B. Tucker JGT/1323/sbn xc:

Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Comission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. P. K. Van Doorn NRC Resident Inspector Catawba Nuclear Station

(

9008310061 {,$hhi3 PDR ADOC}

PDC t

S i

-