ML20059C071
| ML20059C071 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 12/10/1993 |
| From: | Julian C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Beard P FLORIDA POWER CORP. |
| Shared Package | |
| ML20059C073 | List: |
| References | |
| GL-89-14, NUDOCS 9401040354 | |
| Download: ML20059C071 (3) | |
See also: IR 05000302/1993027
Text
.
.
.
t
.
nc^ j n
m'a
Docket No. 50-302
License No. DPR-72
Florida Power Corporation
Mr. P. M. Beard, Jr.
Sr. VP, Nuclear Operations
ATTN:
Hgr., Nuclear Licensing
15760 West Power Line Street
Crystal River, FL 34428-6708
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NO. 50-302/93-27)
This refers to the inspection conducted by J. J. Lenahan of this office on
November 8 - 12, 1993. The inspection included a review of activities
authorized for your Crystal River facility. At the conclusion of the
inspection, tie findings were discussed with those members of your staff
identified in ?he enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice).
Violation A lists seven examples of failure to implement the written
requirements of the reactor building tendon surveillance program.
This
violation is of concern because the examples listed in the violation show
failure of your personnel to perform adequate oversight of the tendon
surveillance contractor, and failure of the Quality Control (QC) inspector to
properly document and inspect the tendon surveillance activities.
Violation B is of concern because of your misinterpretation of the provisions
of Technical Specification 4.02 issued by Amendment 128 of the Technical
Specifications which permits extending surveillance intervals by 25 percent.
Your attention is invited to the Safety Evaluation Report which supports
Technical Specification Amendment 128, the Bases for Technical Specification 4.02 (Amendment 128), and the guidance provided in NRC Generic letter 89-14
which state that allowance for extending surveillance intervals can not be
used repeatedly merely as operational convenience to extend surveillance
intervals beyond those specified.
9401040354 931210
ADOCK 05000302
G
0301 #.'
IEOl
- -
L
.
,
..
.
.
DEC I 0 r m
-
Florida Power Corporation
2
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosure (s) will be placed in the NRC Public Document
Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Caudie A. Julian, Chief
Engineering Branch
Division of Reactor Safety
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
Gary L. Boldt
Vice President, Nuclear Production
Florida Power Corporation
15760 West Power Line Street
Crystal River, FL 34428-6708
B. J. Hickle, Director
Nuclear Plant Operations
Florida Power Corporation
15760 West Power Line Street
Crystal River, FL 34428-6708
R. C. Widell, Director
Nuclear Operations Site Support
Florida Power Corporation
15760 West Power Line Street
Crystal River, FL 34428-6708
Gerald A. Williams
Corporate Counsel
Florida Power Corporation
MAC - ASA
P. O. Box 14042
St. Petersburg, FL 33733
(cc w/encls cont'd - See page 3)
.
.
.
.
,
.
.
DEC I O nn'
Florida Power Corporation
3
,
(cc w/encls cont'd)
Attorney General
Department of Legal Affairs
The Capitol
Tallahassee, FL 32304
Bill Passetti
Office of Radiation Control
Department of Health and
Rehabilitative Services
-
1317 Winewood Boulevard
Tallahassee, FL 32399-0700
Joe Myers, Director
Division of Emergency Preparedness
Department of Community Affairs
2740 Centerview Drive
Tallahassee, FL 32399-2100
Chairman
Board of County Commissioners
Citrus County
110 N. Apopka Avenue
Inverness, FL 36250
!
Robert B. Borsum
B&'d Nuclear Technologies
1700 Rockville Pike, Suite 525
Rockville, MD 20852-1631
bcc w/encls:
K. Landis, RII
J. Jaudon, RII
G. Hallstrom, RII
Document Control Desk
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
6745 N. Tallahassee Road
Crystal River, FL 34428
FILE NAME: S:\\DRS\\EB\\ CRY 9327L.JL
RI
R
RII- )
JLtWahan:pd
ke
Klidbish
if/ju/93
ga/93
If/30/93
-