Provides Schedule for Completing Guidance Documents for NPR Licensing Process as Presented in SECY-91-160 & SECY-93-182
ML20059B906
Person / Time
Issue date: 08/03/1993
From: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Selin I, The Chairman
NRC COMMISSION (OCM)
References
NUDOCS 9310290140
Download: ML20059B906 (5)


Text

,..

~

c FiltG J'b "*%,

. [A;3 UNITED STATES e

5 sp i NUCLEAR REGULATORY COMMISSION t

o4,/

WASHINGTON, D.C. 205S0001 y

August 3.-1993 MEMORANDUM FOR: The Chairman Commissioner Rogers Commissioner Remick Commissioner de Planque FROM:

James M. Taylor Executive Director for Operations

SUBJECT:

SCHEDULE FOR THE PROGRAM FOR PRODUCING GUIDANCE DOCUMENTS FOR.

THE NON-POWER REACTOR LICENSING PROCESS This memorandum provides a schedule for completing guidance documents for the i

non-power reactor (NPR) licensing process, as presented in SECY-91-160 and SECY-93-182.

]

In a staff requirements memorandum (SRM) of April'll,-1991, the Commission-directed the staff to prepare a NUREG report or other form of guidance that-(1) identifies the regulations that apply to NPRs,-(2) provides direction to a

licensees on all aspects of the NPR licensing process, and (3) describes procedures that the staff.will use when reviewing an application.for a license. The staff responded to the SRM in SECY-91-160 and provided a program and schedule for completing these tasks. 3 e status of the program for producing guidance documents for the NPR li ensing process ~ is given in -

SECY-93-182.

In SECY-93-182, the staff states that a complete set of draft guidance documents for licensee comment will be ready by October 30,:1994. Nine chapters will be completed by the end of 1993 and the remaining 10 c! apters by.

October 30, 1994. The enclosure to this memorandum provides additional detail on the status of the chapters and the schedule for issuing them. The format ~

and content guidance and staff review plan and acceptance criteria for :

Chapter 5, " Reactor Coolant System," and Chapter 14,. " Technical Specifications," were sent to NPR licensees for comment on July 12, 1993.

270061

/M-gr CONTACT.

I A. Adams, ONDD/NRR

/Lp -

504-1127 i;

r; y 9310290140 93o903 7

gI PDR ORQ NE ED

. ;&{ v l

PDR

L 9

The Commissioners.

The staff estimates that it will expend one FTE of effort to complete issuance of the draft chapters for comment.

The period for comments on the draft chapters will close in April 1995. To ensure that all NPR licensees and interested parties have sufficient time to thoroughly review the draft chapters, the comment period on draft chapters to be released will be six r

months. After evaluating comments, resource needs and a schedule will be developed. The goal of the staff is to issue final NUREG reports not later than August 1995.

Originalsigned by James H.Snlezek James M. Taylor Executive Director for Operations

Enclosure:

Status of NPR Guidance Documents cc w/ enclosure:

SECY OGC OCA OPA DISTRIBUTION:

[GT9134] (Action Items disk)

Central File D. Crutchfield PDRs ONDD R/F ED0# 9134 DORS R/F #93-117 EDO R/F B. Grimes J. Taylor S. Weiss J. Sniezek E. Hylton J. Blaha A. Adams w/ incoming H. Thompson NRR Mail Room (ED0# 9134 w/ incoming)

T. Murley/F. Miraglia J. Partlow W. Russell A. Gody

  • See previous concurrence ON Dd '

TECH ED*

ONDD:D*

ONDD:1)b

_ $ 11)on AAd MMejac SWeiss L

/J /93

$/K 7/19/93 7/22/93 DORS:D*

ADP*

DONRR*

EDF J l

BGrimes JPn tiow TMurley JT er 7/22/93 7/27/93 7/28/93

/93 0FFICIAL RECORD COPY l

l l

i

SCHEDULE FOR ISSUING NPR GUIDANCE DOCUMENTS Issue Draft for Receive Chapter Title Comment Comments 1

Introduction 12/93 6/94 2

Site Characteristics 10/94 4/95 3

Design of Structures, Systems and Components 10/94 4/95 4

Reactor 8/94 2/95 5

Reactor Coolant Systems 7/93 6/94

)

6 Engineering Safety Features 11/93 5/94 7

Controls and Instrumentation 9/94 3/95 8

Electrical Power Systems 9/93 3/94 9

Auxiliary Systems 11/93 5/94 10 Experimental Programs 12/93 6/94 11 Radiation Protection Program and Waste 9/94 3/95 Management

)

12 Conduct of Operations 10/94 4/95 13 Accident Analysis 9/94 3/95 14 Technical Specifications 7/93 6/94 15 Financial Considerations 10/94 4/95 16 Other License Considerations 10/94 4/95 17 Decommissioning 12/93 6/94 18 HEU-LEU Conversion 10/93 4/94 Appendix Regulation Applicability Part 50 3/94 N/A l

y p g g5@'/]ifQ

'o,,

UNITED STATES

+

8 NUCLEAR REGULAlORY COMMISSION qj 3.<

i o

t WASHINGTON, D. C. 20555 EDO Principal Correspondence Control FROM:

DUE: 07/30/93 EDO CONTROL: 0009134 DOC DT: 07/14/93 FINAL REPLY:

Chairman Selin TO:

James M.

Taylor FOR SIGNATURE OF:

Executive Director DESC:

ROUTING:

SECY-93-182, STATUS OF THE PROGRAM FOR PRODUCING Taylor GUIDANCE DOCUMENTS FOR THE NON-POWER REACTOR Sniezek LICENSING PROCESS Thompson Blaha DATE: 07/15/93 ASSIGNED TO:

CONTACT:

NRR Murley

~.

SPECIAL INSTRUCTIONS OR REMARKS:

pgg fL& ' 7/f/ff

. Dors / $/ W "LS yg

,Qc,,%

e 9)Z&

Y 97 ACi~i0ij DUE TO NRR DIRdCiURS OFFICE j

W BY 7lA lIf3 d

p c4/

f7/aAW

/gM r

  • .. p anlau e

-, f,,

UNITED y,_

NUCLEAR REGULATvRY COMMISSION o

5

<E WASHINGTON, D. C. 20555 e

gf CHAIRMAN July 14,1993 MEMORANDUM FOR:

James M. Taylor Executive Director for Operations FROM:

Ivan Selin i

SUBJECT:

SECY-93-182, STATUS OF THE PROGRAM FOR PRODUCING GUIDANCE DOCUMENTS FOR THE NON-POWER REACTOR LICENSING PROCESS.

1 The commission read with interes; the status of the program for producing guidance documents for the non-power reactor licensing process.

Because of resource constraints, we do not object to the 18 month slippage in the original sched'< * -

However, we encourage the staff to develop a reasonab'-

unedule for the development of guidance documents for t' 4-power reactor licensing process, devote the appropriut tesources, and adhere to the project schedules.