j
, PLANT SYSTMS RSCEtVED
~
ULTIMRTI MEAT SIM APR 2 71988 l
LIMITIN8 C00eITION FOR OPERATION 8OO L
(
3.7.1.2 The steney cooling water storage basin shall be OPERABLE with:
A minimum basin water level at or above elevation 111'10" Msan Sea a.
Level, USGS datus, and b.
A basin water temperature of less than or equal to F.
Two OPERABLE cooling tower fan cells (5 fans per ce c.
per division.
APPLICA81LITY: OPERATIONAL CONDITIONS 1, 2, 3, 4, 5 and 8 Ag,TJg:
With the requirements of the above specification not satisfied:
a y
Wtth che basin water level less than 111'10" MSL or the temperature a.
cA~ tier. tha74t*F, then declare the $$W system inoperable and take i
we ACTION required by Specification 3.7.1.1.
s b.
In CPERATIONAL CONDITION 1, 2, or 3 with any one fan cell inoperable, restore the inoperable fan cell to OPERA 8LE status within 30 days or be in at least NOT SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and COLD SHUTOO within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
In OPERATIONAL CONDITION 1, 2, or 3 with one fan cell per division c.
inoperabl% restore at least one to OPERA 8LE status within_7 days or be in at Isast HOT SHUTOOWN within the next'12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTWWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
d.
In OPERATJONAL PAMDITION 1, 2, or 3 with both fan cells in one divi-sion inoperable _restors at least one of the inoperable fan cells to OPERABLE st.atus within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and with both $$W pumps in the i
other division inoperable, align the OPERABLE $$W pumps to the OPJRAHL1 fan calls within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HDT SHUT 00WN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the follovir.g 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
In OPERATiGWAL CONDITION 1, 2, or 3 with the cooling tower fan cells e.
otharwise inoperable be in at least NOT SHUT 00WN within the next U! hours tad in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
f.
In CPERATIONAL CONDITION 4, 5,
- with one or less fan cells OPERA 8LE, declare the ESW system inoperable and take the ACTION required by Specification 3.7.1.1.
The provisions of Specification 3.0 3 are not applicable.
- When handling irradiated fuel in the primary containment or Fuel Building.
RIVER SEND - UNIT 1 3/4 7-3
$$f2$$fN: b 0
[
P
r u
- '.y.,. --
y
f" i
PLNff SYSTEMS i
SURVEILLANCE REQUIRDENTS-
^-
y I
4.7.1.2 The staney cooling tower and water storage basin shall be determined
. OPERABLE:
a.
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying.the basin water level to be j
at least elevation 111'10".
1 b.'
verifyify the srit.hmetical average" water temperature to be less
-l 1
or equal to F:
1.
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and 2.
At least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> when the control room alam is U
inoperable and the last recorded basin water temperature is 4
-greater than or equal to 75'F, and l
3, At least once per 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> when the control room alars is-inoperable and the last recorded basin water temperature is-j greater than or equal to 80*F.
L c.
-At least once per 31 days by starting the cooling tower fans in each cell from the control room and operating each fan cell-for at least i
l.
15 minutes.
L i
b t
T l-
.,s
[
l
[
l1
- The avera shall include at least 4 o rabie ser.. ors of which at least half l
-shal. be ocated above elevation 94'-0 E
RIVER 500 - UNIT 1 3/4 7-4 Amendment No.to
-l 7
,