ML20059B669

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs,Increasing UHS Basin Temp from 82 to 88 F
ML20059B669
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/22/1990
From:
GULF STATES UTILITIES CO.
To:
Shared Package
ML20059B667 List:
References
NUDOCS 9008290221
Download: ML20059B669 (2)


Text

-

j

, PLANT SYSTMS RSCEtVED

~

ULTIMRTI MEAT SIM APR 2 71988 l

LIMITIN8 C00eITION FOR OPERATION 8OO L

(

3.7.1.2 The steney cooling water storage basin shall be OPERABLE with:

A minimum basin water level at or above elevation 111'10" Msan Sea a.

Level, USGS datus, and b.

A basin water temperature of less than or equal to F.

Two OPERABLE cooling tower fan cells (5 fans per ce c.

per division.

APPLICA81LITY: OPERATIONAL CONDITIONS 1, 2, 3, 4, 5 and 8 Ag,TJg:

With the requirements of the above specification not satisfied:

a y

Wtth che basin water level less than 111'10" MSL or the temperature a.

cA~ tier. tha74t*F, then declare the $$W system inoperable and take i

we ACTION required by Specification 3.7.1.1.

s b.

In CPERATIONAL CONDITION 1, 2, or 3 with any one fan cell inoperable, restore the inoperable fan cell to OPERA 8LE status within 30 days or be in at least NOT SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and COLD SHUTOO within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

In OPERATIONAL CONDITION 1, 2, or 3 with one fan cell per division c.

inoperabl% restore at least one to OPERA 8LE status within_7 days or be in at Isast HOT SHUTOOWN within the next'12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTWWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

d.

In OPERATJONAL PAMDITION 1, 2, or 3 with both fan cells in one divi-sion inoperable _restors at least one of the inoperable fan cells to OPERABLE st.atus within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and with both $$W pumps in the i

other division inoperable, align the OPERABLE $$W pumps to the OPJRAHL1 fan calls within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HDT SHUT 00WN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the follovir.g 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

In OPERATiGWAL CONDITION 1, 2, or 3 with the cooling tower fan cells e.

otharwise inoperable be in at least NOT SHUT 00WN within the next U! hours tad in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

f.

In CPERATIONAL CONDITION 4, 5,

  • with one or less fan cells OPERA 8LE, declare the ESW system inoperable and take the ACTION required by Specification 3.7.1.1.

The provisions of Specification 3.0 3 are not applicable.

RIVER SEND - UNIT 1 3/4 7-3

$$f2$$fN: b 0

[

P

r u

- '.y.,. --

y

f" i

PLNff SYSTEMS i

SURVEILLANCE REQUIRDENTS-

^-

y I

4.7.1.2 The staney cooling tower and water storage basin shall be determined

. OPERABLE:

a.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying.the basin water level to be j

at least elevation 111'10".

1 b.'

verifyify the srit.hmetical average" water temperature to be less

-l 1

or equal to F:

1.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and 2.

At least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> when the control room alam is U

inoperable and the last recorded basin water temperature is 4

-greater than or equal to 75'F, and l

3, At least once per 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> when the control room alars is-inoperable and the last recorded basin water temperature is-j greater than or equal to 80*F.

L c.

-At least once per 31 days by starting the cooling tower fans in each cell from the control room and operating each fan cell-for at least i

l.

15 minutes.

L i

b t

T l-

.,s

[

l

[

l1

  • The avera shall include at least 4 o rabie ser.. ors of which at least half l

-shal. be ocated above elevation 94'-0 E

RIVER 500 - UNIT 1 3/4 7-4 Amendment No.to

-l 7

,