ML20059B515
| ML20059B515 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/14/1993 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mccoy C GEORGIA POWER CO. |
| Shared Package | |
| ML20059B519 | List: |
| References | |
| NUDOCS 9401040170 | |
| Download: ML20059B515 (3) | |
See also: IR 05000424/1993026
Text
k..g
_
<
v
u
y
!
g,
!
C. ,
i
DEC 141993
l
.
.
.
Docket Nos. 50-424, 50-425
!
1
-t
Georgia Power Company
1
ATTN: Mr. C. K. McCoy
Vice President
i
.
'
Vogtle Electric Generating Plant
P. O. Box 1295
i
Birmingham, AL 35201
I
Gentlemen:
j
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NOS. 50-424/93-26 AND 50-425/93-26)
i
This refers to the inspection conducted by B. Bonser of thi: office on
!
October 24 through Novcmber 20,-1993. The inspection included a review of-
r
activities authorized for your Vogtle facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
r
identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
'
and representative records, interviews with personnel, and observation of
activities in progress.
-
Based on the results of this inspection, certain of your activities appeared
-
to Le in viotation of NRC requirements, as specified in the enclosed Notice of
.
Viol ation. (Notice). The violation is of concern because it resulted from an
apparent lack of awarersess, by those performing the containment exit
-intpertion, of the significance of loose material in containment and the
.
potential effects on emergency core cooling system functions, and of the
significance of documentation indicating completion of a Technical
Specification surveillance procedure.
You-are required to respond to this letter and should follow the instructions
t
specified in the enclosed Notice when preparing your response.
In your
'
response, you should document the specific actions:taken and any additional
. actions you plan to orevent recurrence. After reviewing your response to this
.
'
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
The responses directed by this letter and the enclosed Notice are not subject
'
l '
to the clearance procedures of the Office of Management and Budget as re 'uired
m
by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
In accordance with 10 CFR.2.790(a), a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
9401040170 931214
0300?1
5" * " "Q
'
L
mEOf ,
r[;
.
DEC 141993
.
Georgia Power Company
2
'
Should you have any questions concerning this letter, please contact us.
Sincerely,
D $lGNfD gy
AIAN R. HERDT
Alan R. Herdt, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosures:
1.
'
2.
NRC Inspection Report
cc w/ encl:
J. D. Woodard
Senior Vice President-Nuclear
Georgia Power Company
P. O. Box 1295
Birmingham, AL 35201
J. B. Beasley
General Manager, Plant Vogtle
Georgia Power Company
P. O. Box 1600
Waynesboro, GA 30830
t
J. A. Bailey
Manager-Licensing
Georgia Power Company
P. O. Box 1295
Birmingham, AL 35201
Nancy G. Cowles, Crensel
Office of the Consumer's
Utility Council
84 Peachtree Street, NW, Suite 201
Atlanta, GA 30303-2318
Office of Planning and Budget
Room 615B
270 Washington Street, SW
Atlanta, GA 30334
Office of the County Commissioner
Burke County Commission
Waynesboro, GA 30830
cc w/encls:
Continued page 3
--
I
.
. . _
- ~ -
_ . . -
. -_.
.
. - ,
.
}
,
<
,;
l
Georgia Power Company
3
DEC 141993
cc v' nels: Continued
1
Harold Reheis, Director
i
'
Department of Natural Resources
205 Butler Street, SE, Suite 1252
)
Atlanta, GA 30334
Thomas Hill, Manager
1
-Radioactive Materials Program
'!
Department of Natural Resources
!
4244 International Parkway
j
Suite 114
Atlanta, GA 30354
l
'
Attorney General
j
Law Department
!
132 Judicial Building
!
Atlanta, GA 30334
i
Dan H. Smith
l
Vice President
.
Power Supply Operations
l
Oglethorpe Power Corporatien
4
2100 E. Exchange Place
.
Tucker, GA 30085-1349
l
Charles A. Patrizia, Esq.
.
Paul, Hastings, Janofsky & Walker
!
12th Floor
i
1050 Connecticut Avenue, NW
l
Washington, D. C.
20036
i
bec w/ encl:
D. Seymour, RII
D. Hood, NRR
P. Skinner, RII
A. Herdt, RII
Document Control Desk
NRC Senior Resident Inspector
U.S. Nuclear Regulatory Commission
P. O. Box 572
Waynesboro, GA 30830
FILE: G:\\VG326RPT.DAS
f
i
D.Seymour
fofP.Skjnner
12/13 /93
12/p{ /93