Text
..
.
.-.
.
N
^QL~
.-
-
.
OCT 2 01993
-
.
4
,
Docket No. 50-293
'
Mr. E. Thomas Boulette, PhD
f
Senior Vice President - Nuclear
,
Boston Edison Company
Pilgrim Nuclear Power Station
!
Rocky Hill Road
Plymouth, Massachusetts 02360
t
Dear Mr. Boulette:
SUBJECT: PILGRIM INSPECTION 93-15
This refers to the safety inspection conducted by Messrs. J. Macdonald, A. Cerne, and D. Kern,
,
of this office on August 17 - September 27, 1993 at the Pilgrim Nuclear Power Station,
Plymouth, Massachusetts. Areas relevant to the health and safety of the public examined during
this inspection are described in the enclosed report. Our findings were based upon observations
of performance and independent evaluations of safety systems and quality records.
The
preliminary results have been discussed with Mr. J. Kamya and other members of your staff at
the conclusion of the inspection.
Our inspectors observed excellent work coordination during plant shutdowns on August 22 and
'
31. The decision to take the plant off line to complete safeguards bus repairs, in light of
Hurricane Emily, reflected sound safety judgement. Control room staff demonstrated strong
command and control following the weather related reactor trip on September 10, during which
the effectiveness of recent training concerning reactor vessel pressure / temperature monitoring
during cooldown was evident. Your multi-disciplinary team efforts to successfully resolve -
recurring recirculation pump trips were indicative of your ability to methodically address
difficult component performance issues.
No replv to this report is necessary, and your cooperation with us is appreciated.
Sincerely,
Original Signed By:
1ames C. Unville
James Linville, Chief
g g' , . ,O
Projects Branch No. 3
Division of Reactor Projects
l
Enclosure: NRC Inspection Report No. 93-15
i
,
\\
l OFFICm RECORD COPY
9310280144 931020
F
,
pi
ADOCK 05000293 p
G
di
/
l
,
.
..
.-
,
~
OCT 2 01993
-
.
.Mr. E. Th.smas Boulette, PhD
2
l
I
cc w/ encl.
,
I
E. Kraft, Vice President, Nuclear Operations and Station Director
L. Schmeling, Plant Manager
1
V. Oheim, Manager, Regulatory Affairs and Emergency Planning Department
D. Tarantino, Nuclear Information Manager
N. Desmond, Compliance Division Manager
R. Mallisey, Department of Public Health, Commonwealth of Massachusetts
R. Adams, Department of Labor and Industries, Commonwealth of Massachusetts
The Honorable Edward M. Kennedy
The Honorable John F. Kerry
The Honorable Edward J. Markey
The Honorable Terese Murray
The Honorable Peter V. Forman
B. Abbanat, Department of Public Utilities
Chairman, Plymouth Board of Selectmen
Chairman, Duxbury Board of Selectmen
,
Plymouth Civil Defense Director
Paul W. Gromer, Massachusetts Secretary of Energy Resources
Sarah Woodhouse, Legislative Assistant
A. Nogee, MASSPIRG
Regional Administrator, FEMA
Office of the Commissioner, Massachusetts Department of Environmental Quality
Engineering
Office of the Attorney General, Commonwealth of Massachusetts
T. Rapone, Massachusetts Executive Office of Public Safety
Chairman, Citizens Urging Responsible Energy
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2 copies)
NRC Resident Inspector
Commonwealth of Massachusetts, SLO Designec
.
OFFICIAL RECORD COPY
.a.
6'
e
me
1
'
e
l
'
l
.
,
. ,
.
.
,
~
OCT 2 01993
Mr. $. Thomas Boulette, PhD
3
bec w/ encl:
I
Region I Docket Room (with concurrences)
'
E. Kelly, DRP
J. Shediosky, DRP
bec w/cnct (VIA FeMAIL):
W. Butler, NRR
R. Eaton, NRR
V. McCree, OEDO
J. Lanning (Section 5.3)
j
R. Rosano, OE (Section 5.3)
-)
- !
l
i
l
l
I
i
l
l
l
Rl:DRP
RI:DRP
RI:DRP
'
.nvil
)
Macdonald/meo
el '(f
jo y ff
l
10/18/93
l
OFFICIAL RECORD COPY
A:PIL9315.MEO
1
l
l
1
L_______-__
. _ .
_ _ _ _ . . _ _ _ . _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_.
.
.
)