ML20059A688

From kanterella
Jump to navigation Jump to search

Ack Receipt of Licensee 930607 Response to Bulletin 93-002, Debris Plugging of ECCS Strainers. NRC Considers Licensee Actions to Be Complete
ML20059A688
Person / Time
Site: Pilgrim
Issue date: 10/21/1993
From: Eaton R
Office of Nuclear Reactor Regulation
To: Boulette E
BOSTON EDISON CO.
References
IEB-93-002, IEB-93-2, TAC-M86601, NUDOCS 9310270062
Download: ML20059A688 (3)


Text

7

, Docket Nos. 50-293 October 21, 1993 Mr. E. Thomas Boulette, Ph.D Senior Vice President - Nuclear Boston Edison Company Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road Plymouth, Massachusetts 02360

Dear Mr. Boulette:

SUBJECT:

PILGRIM NUCLEAR POWER STATION RESPONSE TO NRC BULLETIN 93-02,

" DEBRIS PLUGGING OF EMERGENCY CORE COOLING SUCTION STRAINERS" (TAC NO. M86601)

This letter acknowledges receipt of your response dated June 7,1993, to NRC Bulletin 93-02 (Bulletin). The Bulletin was issued May 11, 1993, to all nuclear power reactor licensees.

It requested licensees to identify fibrous material in the primary containment, take any necessary compensatory measures, and remove any such material. Your response stated that temporary filters are

.used to maintain cleanliness of the cooling coils of unit coolers during plant outages when primary containment is open and that such filters are procedurally installed and removed. Additionally, temporary fibrous materials are not stored within the primary containment.

Based on that, we consider your actions to be complete.

Please retain any. records of your actions in response to this Bulletin, as subsequent inspection activities may be conducted in regards to this issue.

t Should you have any questions, please contact me at (301) 504-3041 or the Lead Project Manager for this issue, John B. Hickman at (301) 504-3017.

Sincerely, i

1 Original signed by:

Ronald B. Eaton, Project Manager Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc:

See next page DISTRIBUTION:

Slittle Docket File REaton NRC & Local PDRs OGC PDI-3 Reading ACRS (10)

SVarga JHickman JCalvo RBarrett WButler OFFICE PDI-3{LA PDih3:PM PDI-3:0 1 n NAME SLM$le REMn:dt WButler W DATE:

10/25/93

/d[M/93 10 /24/93 0FFICIAL RECORD COPY DOCUMENT NAME: A:\\PIM86601.LTR 9310270062 931021 1

PDR ADOCK 05000293 22 O Op/ i P

PDR 3Fo(

iia

p* Rf Gg

+

UNITED STATES

.f

[

j NUCLEAR REGULATORY COMMISSION

{

t'

't WASHINGTON, D.C. 20666-0001 o

October 21, 1993 Docket No. 50-293 Mr. E. Thomas Boulette, Ph.D Senior Vice President - Nuclear Boston Edison Company Pilgrim Nuclear Power Station i

RfD #1 Rocky Hill Road f

Plymouth, Massachusetts 02360

Dear Mr. Boulette:

"^j

SUBJECT:

PILGRIM NUCLEAR POWER STATION RESPONSE TO NRC BULLETIN 93-02,

" DEBRIS PLUGGING OF EMERGENCY CORE COOLING SUCTION STRAINERS" (TAC NO. M86601) l This letter acknowledges receipt of your response dated June 7,1993, to NRC Bulletin 93-02 (Bulletin). The Bulletin was issued May 11, 1993, to all; nuclear power reactor licensees.

It requested licensees to identify fibrous.

material in the primary containment, take any necessary compensatory measures, and remove any such material.

Your response stated that temporary filters are used to maintain cleanliness of the cooling coils of unit coolers during plant outages when primary containment is open and that such filters are procedurally installed and removed. Additionally, temporary fibrous materials are not stored within the primary containment. Based on that, we consider your actions to be complete.

Please retain any records of your actions in response to this Bulletin, as subsequent inspection activities may be conducted in regards to this issue.

Should you have any questions, please contact me at (301) 504-3041 or the Lead Project Manager for this issue, John B. Hickman at (301) 504-3017.

Sincerely, i

i Y

ona B. Eaton, Project Manager Project Directorate I-3 j

Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc:

See next page l

W l

1 j{

j l

Mr. E. Thomas Boulette Pilgrim Nuclear Power Station cc:

Mr. Edward S. Kraft, Mr. H. Vernon 0heim I

Vice President of Nuclear Manager, Reg. Affairs Dept.

Operations & Station Director Pilgrim Nuclear Power Station Pilgrim Nuclear Power Station RFD.#1 Rocky Hill Road RFD #1 Rocky Hill Road Plymouth,. Massachusetts 02360 Plymouth, Massachusetts 02360 Mr. David F. Tarantino i

. Resident Inspector Nuclear Information Manager U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station i

Pilgrim Nuclear Power Station RFD.#1, Rocky Hill Road l

Post Office Box 867 Plymouth, Massachusetts 02360 Plymouth, Massachusetts 02360 Mr. Thomas Rapone l

Chairman, Board of Selectmen Secretary of Public Safety 11 Lincoln Street Executive Office of Public Safety Plymouth, Massachusetts 02360 One Ashburton Place Boston, Massachusetts 02108 Office of the Commissioner Massachusetts Department of Mr. David Rodham, Director j

Environmental Protection Massachusetts Emergency Managementi One Winter Street Agency

_l Boston, Massachusetts 02108 400 Worcester Road P.O. Box 1496 Office of the Attorney General.

Framingham, Massachusetts 01701-0317 One Ashburton Place Attn: James Muckerheide 20th Floor Boston, Massachusetts 02108 Chairmen, Citizens Urging Responsible Energy Mr. Robert M. Hallisey, Director P. O. Box 2621 Radiation Control Program Duxbury, Massachusetts 02331 Massachusetts Department of Public Health Citizens at Risk 305 South Street P. O. Box 3803 Boston, Massachusetts 02130 Plymouth, Massachusetts 02361 q

Regional Administrator, Region I W. S. Stowe, Esquire U. S. Nuclear, Regulatory Commission Boston Edison Company 475 Allendale Road 800 Boylston St., 36th Floor King of Prussia, Pennsylvania 19406 Boston, Massachusetts 02199 Mr. Paul J. Hamilton Licensing Division Manager Boston Edison Company

-l 25 Braintree Hill Park Braintree, Massachusetts 02184

-