Notice of Violation from Insp on 931012-1119.Violation Noted:Cea Deviation Alarms from Both Computer Pulse Counting Sys & Reed Switch Indicating Sys Were Inoperable & Had Apparently Been in That Condition Since Plant Startup
ML20059A328
Person / Time
Site: Maine Yankee
Issue date: 12/17/1993
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20059A318 List:
References
50-309-93-23, NUDOCS 9312300107
Download: ML20059A328 (1)


Text

... :.

ENCLOSURE 1

=

.[

NOTICE OF VIOLATION r

Maine Yankee Atomic Power Company Docket No. 50-309 j

Maine Yankee Atomic Power Station License No. DPR-36--

~!'

During a NRC inspection conducted on October 12 to November 19,.1993, a' violation of NRC requirements was identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, the violation is-listed below:

Technical Specifications 3.10.A.4, states, in part, that if the CEA deviation alarms -

from both the computer pulse counting system and the reed switch indication system l

are not available, individual CEA positions shall be logged and misalignment checked 1

every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

Contrary to the above, on November 4,1993, the CEA deviation alarms from both the computer pulse counting system (PANALARM R-1-7u) and the reed switch indicating system (PANALARM R-2-3) were inoperable, and had apparently been in -

1 that condition since the plant startup on October 9,1993, without individual CEA

-i positions being logged and misalignment checked every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

j This is a severity level IV violation (supplement 1)

)

Pursuant to the provisions of 10 CFR 2.201, Maine Yankee Atomic Power Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory i

Commission,' ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the

'i Regional Administrator, Region I, and a copy to the NRC Resident Inspector at the facility 3

that is the subject of this Notice, within 30 days of the date of the letter transmitting this -

Notice of Violation (Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include: (1) the reason for the violation, or, if contested, the basis for j

disputing the violation, (2) the corrective steps that have been taken and the results achieved, j

(3) the corrective steps that will be taken_ to avoid further violations, and (4) the date when full compliance will be achieved. If an adequate reply is not received within the time

]

specified in this Notice, an order or a Demand for Information may be issued to show cause

- why the license should not be modified, suspended, or revoked, or.why such other action as may be proper should not be taken. Where good cause is shown, consideration will be given y

to extending the response time.

j r

+

Dated at Kine of Prussia. Pennsylvania j

this 17TH. day of DECEMBER,1993

+

i I

9312300107 931217 PDR ADOCK 05000309 G-PDR i

omCIAL RECORD COPY qj

.