e MC$
DEC 161993 Docket Nos. 50-277 50-278 Mr. D. M. Smith -
Senior Vice l'esident-Nuclear Philadelphia Electric Company Nuclear Group Headquarters Correspondence Control Desk P. O. Box 195 Wayne, Pennsylvania 19087-0195
Dear Mr. Smith:
SUBJECT:
REVIEW OF PROPOSED CHANGES TO THE QUALITY ASSURANCE PROGRAM DESCRIPTION CONTAINED IN THE 10 CFR 50.71(e)
SUBMITTAL OF REVISION 11 OF THE UPDATED FINAL SAFETY ANALYSIS REPORT (UFSAR) FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3
References:
Letter, dated June 29,1993, from Mr. G. R. Rainey to the U.S. Nuclear -
Regulatory Commission transmitting Revision 11 of the Updated Final Safety Analysis Report and the submittal of the Annual Revision to the Peach Bottom Atomic Station, Units 2 and 3 Quality Assurance Program Description We have completed our review of the proposed changes to the Peach Bottom Atomic Power Station, Units 2 and 3 Safety Analysis Report quality assurance program description as c
included in the subject submittal. The changes described in this submittal were reviewed in accordance with the requirements and acceptance criteria set forth in NUREG-0800,
" Standard Review Plan," Section 17.2 to ascertain their compliance with the provisions of 10 CFR 50.54(a).
Based on our review, we have determined that the proposed changes are acceptable in that they will not effect a reduction of the commitments in the Quality Assurance Program Description previously accepted by the Commission and that the revised program incorporating such changes will continue to satisfy the criteria of Appendix B to 10 CFR 50.
9312300019 931216
' /
PDR ADOCK 05000277 l
P PDR
\\
280022-a e
DEC l 61993
't Philadelphia Electric Company 2
If you have any questions conceming the above, please contact Mr. M. Modes at 215-337-5198 or Mr. S. Chaudhary at 215-337-5335.
Sincerely, oriciaal Sirac4 4 ?
Jacque P. Durr, Chief Engineering Branch Division of Reactor Safety cc:
J. Doering, Chairman, Nuclear Review Board G. Rainey, Vice President, Peach Bottom Atomic Power Station G. Cranston, General Manager, Nuclear Engineering Division C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
G. Edwards, Plant Manager, Peach Bottom Atomic Power Station 1
A. J. Wasong, Manager, Experience Assessment G. A. Hunger, Jr., Manager, Licensing Section J. W. Durham, Sr., Senior Vice President and General Counsel J. A. Isabella, Director, Generation Projects Department, Atlantic Electric B. W. Gorman, Manager, External Affairs R. McIran, Power Plant Siting, Nuclear Evaluations D. Poulsen, Secretary of Harford County Council R. Ochs, Maryland Safe Energy Coalition J. H. Waltt., Chief Engineer, Public Service Commission of Maryland l:
Public Document Room (PDR)
I.ocal Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Pennsylvania TMI - Alert (TMIA) l 1
h l
DEC l 61993 Philadelphia Electric Company 3
bec w/ encl:
Region I Docket Room (with concurrences)
W. Dean, OEDO Joseph Shea, NRR L. Nicholson, Acting PDI-2, NRR RI:DRS RI Modes Durr SVL 12/7/93 12//6/93 OFFICIAL RECORD COPY A:PBCHANGE.QA
t PHILADELPHIA ELECTRIC COMPANY 10CFR50.71(e)(4)
NUCLEAR GROUP HEADQUARTERS 10CFR50.54(a)(3) 955-65 CHESTERBROOK BLVD.
i WAYNE, PA 19087-5691 (215) 640-6650 GERALD R. RAINEY WCE PREstDENT STAHoN SUPPORT June 29,1993
.t Docket Nos. 50 277 50-278 i
t U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
Peach Bottom Atomic Power Station, Units 2 and 3 Submittal of Revision 11 of the Updated Final Safety Analysis Report i
Dear Sirs:
In accordance with 10CFR50.71(e)(4) and 10CFR50.4(b)(6), this letter submits one original and ten (10) copies of Revision 11 of the Updated Final Safety Analysis Report (UFSAR) for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The enclosed copics are being provided to the NRC with a page revision listing that identifies the latest revision date of all current pages in accordance with 10CFR50.71(e)(1). We I
have also provided page replacement instructions for incorporating Revision 11 into the UFSAR. As required by 10CFR50.71(e)(5), each replacement page contains a bold vertical line in the margin adjacent to each
- j area changed along with the date of the change. Revision 11 reflects changes made up to a maximum of l
six months prior to this subrnitial in accordance with the requirements of 10CFR50.71(e)(4). As a resutt, the
{
UFSAR Revision 11 reflects changes made to PBAPS, Units 2 and 3, under the provision of 10CFR50.59,-
l at least up to January 1,1993.
l The enclosed UFSAR Revision 11 also contains the annual revision of the Ouality Assurance (QA) Program f
l Description which is being submitted in accordance with 10CFR50.54(a)(3). The revised OA Program l
Description (i.e, Appendix D of the UFSAR) reflects editorial and organizational changes and those changes.
described in Attachment 1 as required by 10CFR50.54(a)(3)(ii).
]
l Based on the information provided in Attachment 1, we have concluded that the OA Program Description l.~
changes included in Revision 11 do not reduce the commitments in the OA Program Description previously j
accepted by the NRC.
j L
<m
~r il 0YU l
Q f
l i
l i
I
.]
l
's
._ A
&?q:yy& -
r'l I
-3 June 29,1993 -
U.S. Nuclear Regulatory Commission Page 2 l
Document Control Desk -
As required by 10CFR50.71(c)(2)(i), I certify that to the best of my knowledge, Re UFSAR accurately reflects information and analyses submitted to the NRC, or prep'I requirements as described above. In addition, as required by 10CFR50.71(e)(2) letter identifies changes made under the provision of 10CFR50.59 and included in the e but not previously submitted to the NRC.
t 3i If you have any questions or require further information, please contact us.
Sincerely, t
. l k
J f
a i
{
11 p
"/
Attachments Enclosure
. i (w/ attachments & enclosure) l T. T. Martin, Administrator, Region I, USNRC (w/ attachments & enclosure) i cc:
USNRC, Senior Resident inspector, PBAPS j