Y ENCLOSURE 1 NOTICE OF VIOLATION Columbia. Nuclear Fuel Facility Docket No.: 70-1151 Westinghouse.
License No.: SNM-1107 During an NRC. inspection conducted on August 16-20 and September 13-16, 1993, two violations of NRC requirements were identified. _In accordance with the-
" General Statement of Policy and Procedure for NRC Enforcement Actions," the
-H violations. are listed below:
A.;
Condition S-1 of.Special' Nuclear Material License Number 1107 (SNM-1107) requires that licensed material be used in accordance with statements,
- representations, and conditions contained in Chapters 2, 3, and 4 of the
. application dated March 26,1984, and supplements thereto.
Chapter.3, Section 3.1.5.5 of License SNM-1107 states that training shall be provided by the Radiation Protection component or line management to maintain a constant awareness by the employee of the necessity for radiation protection and nuclear criticality safety requirements and applicable portions of 10 CFR 19 and 20.
Section
' 3.1.5.7 states 'that line management shall be responsible for instructing personnel.'in the' safety aspects of plant operations, including methods
~ of dealing with process ~ upsets or malfunctions.
Contrary'to the above, a Pellet Area operator was not adequately trained in that, on July.20,1993,: the operator failed to realize that checking-the Line 3 Bulk Container Enclosure for accumulation of powder was a
. criticality safety control. This resulted in an accumulation of UO 2
powder inside the enclosure and loss of one of two criticality safety barriers for the enclosure.
'This;is a Severity Level IV violation (Supplement VI).
-B.
Condition S 1 of Special Nuclear Material License Number 1107 (SNM-1107) requires-that licensed material be used in accordance with statements, representations, and conditions contained in Chapters 2, 3, and 4 of the
. application dated March 26, 1984, and supplements thereto.
J Chapter 2, Section 2.6 of License SNM-1107 states that special nuclear -
material processing shall be conducted in accordance with approved written; procedures or. instructions.
00P-811011,--Fitzmill, Rev. 12, dated May 27, 1993, requires in Step
- 7.2.9.that the~ operator check.the Fitzmill enclosure for powder and water leaks several times' a shift by looking through the lexan windows 1
and/or-by opening the mill enclosure doors.
l
'~
=9310260213 931015 6
?PDR 'ADDCK 07001151.;
C PDR i
r
- v.,
.v r
qq, LColumbia Nuclear Fuel Facility-2 Docket No.: 70-1151
.Westinghousez License No.: SNM-1107 p
(
R K '
? Contrary to the'above,-during'an approximately 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period from third na o
, shift on August.11'through'4:00 a.m..on_ August 13, 1993,. operators.did 0
not check for powder ~and water leaks.several times during each shift' inside the Fitzmill enclosure of ADU Conversion Line 5 which resulted in-an accumulation of.UO; powder inside the. enclosure and loss of =one of
.two. criticality safety barriers for the enclosure.
'C
~ Thisiis' a ~ Severity Level IV violation (Supplement:VI).
Pursuant.tolthe provisionsof_ l'0 CFR 2.201, Columb.ia-' Nuclear Fuel Facility is F
'hereby required to submit.a written statement or explanation to the U.S.
- Nuclear Regulatory Commission, ATTN
- Document Control-Desk, Washington,. D.C.
M J20555 with'a copy:to the Regional; Administrator, Region'II,1within 30 days of
? the date of tthe letter transmitting _ this Notice of Violation (Notice). This I
'. reply should be clearly marked.as a'" Reply to a Notice of Violation" and
, Tshould include for. each violation:
(1) the reason for the. violation, or, if
~
' contested,.the basisDfor disputing ~the violation, (2) the corrective steps
'.that have been'taken andLthe,results achieved,'(3) the corrective steps.that will be:taken to avoid further. violations, and (4) the date when full i compliance will be: achieved...If an adequate reply is not received.within the 9 time specified in this Notice, ~an order or Demand for Information may be
'issuedtas to why the' license should not be modified, suspended, or revoked, or p
e why:such.other action as may:be proper should not be taken. Where good.cause
.is shown,:. consideration will be given to extending the response time.