OCT I 31993 MEMORANDUM FOR:
Albert F. Gibson, Director Division of Reactor Safety J. Philip Stohr, Director Division of Radiation Safety and Safeguards Gus C. Lainas, Assistant Director for Region II Reactors Office of Nuclear Reactor Regulation Jon R. Johnson, Deputy Director Division of Reactor Projects FROM:
David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects
SUBJECT:
SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP)
REQUEST FOR FUNCTIONAL AREA OUTLINE - BRUNSWICK UNITS 1 AND 2 Enclosured are the written SALP feeder inputs on the performance of Brunswick during SALP period November 1,1992 to November 6,1993.
In addition, other pertinent supplemental information has been enclosed.
Please review the SALP inputs for the areas assigned to you and provide an outline report as described
=
in ROI 0516, Rev. 2, Section E, " General Guidance for the SALP Program."
The input should be provided by November 8, 1993, to Harold Christensen, Chief, Section lA, Division of Reactor Projects, Region II.
The outlines will be compiled and distributed to all Board members by November 12, 1993.
The SALP Board for Brunswick will be conducted on November 18, 1993. Please be prepared to present the outline covering your assigned SALP functional area at the Board meeting.
The assigned responsibility by functional area for the subject SALP assessment is a follows:
J. Johnson - Plant Operations A. Gibson
- Maintenance G. Lainas
- Engineering J. Stohr
- Plant Support For purposes of manpower recording, the following inspection report numbers should be used when recording time spent on SALP assessment preparaticas:
Report Numbers:
50-324/93-44 and 50-325/93-44 Since the SALP period ends on November 6,1993, it is essential that issues that developed between the date of submittal of your SALP input feeder forms and the end of the SALP period are promptly forwarded to the responsible SALP Board 250152 ai 9310260202 931013
[hh DR ADOCK 0500 4
Multiple Addressees 2
member. Additional information on issues developed during this period should be transmitted by computer or in written form and the responsible SALP Board member should be called and briefed on the information.
I Note that some of the report and document reference material to support the SALP feeder forms is being copied and will be forwarded to you by November 1,1993.
If there are any questions concerning the SALP process or preparation of your input, please call me.
Original signed by:
Harold O. Christensen/for David M. Verrelli
Enclosures:
1.
Completed Input Feeder Forms 2.
Master Inspection Plan 3.
Previous SALP Report Slides 4.
Listing of Violations and LERS 5.
Listing of Inspection Hours by Functional Area 6.
Pertinent Supplemental Information cc w/o encls:
DRS BC EB DRS BC OB DRSS BC RPEP DRSS BC NMSS S. S. Bajwa cc w/encls:
H. Christensen R. Carroll R. Prevatte F. Jape M. Shymlock J. Blake L. Lawyer M. Ernstes C. Casto W. Cline D. Collins W. Rankin T. Decker C. Hosey P. Milano RII:
Pn i
RCa f
- tj 10/3/93
)
--