APPENDIX A NOTICE OF VIOLATION Entergy Operations, Inc.
Dockets:
50-313 Arkansas Nuclear One 50-368 Licenses: OPR-51 NPF-6 During an NRC inspection conducted on October 3 through November 13, 1993, two violations of NRC requirements were identified.
In accordance with the
" General Statement of Policy and Procedure for NRC Enforcement Actions,"
10 CFR Part 2, Appendix C, the violations are listed below:
A.
10 CFR Part 50, Appendix B, Criterion XVI, required that measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected.
Procedure 1000.104, " Condition Reporting and Corrective Actions" required that "Each manager ensures that assigned action it6ms are completed as scheduled."
Contrary to the above, on October 7,1993, the licensee failed to replace emergency diesel generator speed sensing relays prior to the end of their apparent qualified life and thus failed to complete the corrective action required by Condition Report 1-89-0501, Item 4, which was closed on May 14, 1990.
This is a Severity Level IV violation.
(Supplement I) (313/9309-01)
B.
Unit 2 Technical Specification 6.8.1.j required that written procedures shall be established, implemented, and maintained covering postaccident sampling.
Procedure 1617.009, Revision 11, Permanent Change 3, " Panel 2C357-Valve Alignment," required that Chloride Analyzer Isolation Solenoid Valve 2SV-5998 be left in the open position and Chemical Analyzer Drain Valve 2SV-5945 be left in the closed position following the completion of postaccident sampling system liquid sampl ing.
Contrary to the above, on November 3,1993, Valve 2SV-5998 was found to be in the closed position and Valve 2SV-5945 was found to be in the open position following completion of postaccident sampling system liquid sampling activities.
This is a Severity Level IV viclation.
(Supplement I) (368/9309-02)
Pursuant to the provisions of 10 CFR 2.201, Entergy Operations, Inc. is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region IV, 611 Ryan Plaza Drive, 9312280022 931217 PDR ADOCK 05000313--
G PDR
i l
1 2 1 Suite 400, Arlington, Texas. 76011, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This. reply should be clearly marked as a " Reply to a Notice of Violation". and should include for the Notice of Violation:
(1) the reason for the violation, or, if. contested, i
the basis-for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full' compliance will be achieved.
If an adequate reply is not received within the time specified in-this Notice, an order or a Demand for Information may be issued to show cause why the license should not be modified, suspended, or revoked, or why.such l
other action as may be proper should not be taken..Where good cause is shown, consideration will be given to extending the response time.
T i
Dated at Arlington, Texas i
this /76L day of/Chundett 1993 i