SoGIc
UNITED STATES
o
..
ff
qk
NUCLEAR REGULATORY COMMISSION
L
'
- -
_.
(,
f
j
necion iv
I
o
611 RYAN PLAZA DRIVE, SUITE 400
Y,
h
AR LINGTON, T E X AS 76011 -8064
- - $
.....
DEC I T 1993
Dockets:
50-313
50-368
Licenses: DPR-51
NPF-6
Entergy Operations, Inc.
ATTN:
J. W. Yelverton, Vice President
Operations, Arkansas Nuclear One
Route 3, Box 137G
,
Russellville, Arkansas 72801
SUBJECT:
NRC INSPECTION REPORT 50-313/93-09; 50-368/93-09 (NOTICE OF
VIOLATION)
This refers to the inspection conducted by L. Smith, and other inspectors of
-
this office, on October 3 through November 13, 1993. The inspection included
a review of activities authorized for your Arkansas Nuclear One, Units I and
2, facility. At the conclusion of the inspection, the findings were discussed
with you and those members of your staff identified in the enclosed report..
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress. The purpose of the inspection was to determine
whether activities authorized by the license were conducted safely and in
.;
accordance with NRC requirements.
Based on the results of this inspection, certain licensed activities appeared ~
to be in violation of NRC requirements, as specified in the. enclosed Notice of
Violation (Notice).
The first' violation is of concern because a speed switch
was not replaced on an emergency diesel generator at the end of its apparent
recommended life.
The second violation involved the failure to maintain
postaccident sampling system valves in the position required by the procedure.
1
This violation is of concern because it indicates a lack of control of plant
equipment status.
Two violations, discussed in Sections 2.1.2 and 3.6 of the enclosed report,
!
are not being cited because the criteria in Paragraph VII.B of Appendix C to
'
10 CFR Part 2 of the NRC's " Rules of Practice" were satisfied.
Your staff
took prompt and effective actions to correct these violations.
It is our
- i
'
understanding that, during the exit on November 18, a member of your staff
committed to certain corrective actions. These actions are listed in
Sections 2.1.2 and 3.6 of the enclosed report.
If your understanding of these
commitments differs from ours, please contact us immediately.
!
e
9312280020 931217
ADDCK 05000313
l
0
PDR._
- .
. . _ - .
.
.
-.
.-
.
-
l
l
-#
+
-;
.
.
t
- ..
I
Entergy Operations, Inc.
-2-
.l
!
!
l
One unresolved item was identified concerning the failure to implement a
vendor recommended modification to reactor coolant pump seal packages on
i
,
Unit 1.
Further inspection will be performed to-determine whether design
change controls were properly implemented. This matter is discussed in-
l
'?
Section 3.5 of the enclosed inspection report.
You are required to respond to this letter and should follow the instructions
j
specified in the enclosed Notice when preparing your response.
In your.
response, you should document the specific actions taken and any. additional
actions you plan to prevent recurrence. After reviewing your response to this
!
Notice, including your proposed corrective actions and the results of future
!
inspections, the NRC will determine whether further NRC enforcement action is
-
necessary to ensure compliance with NRC regulatory requirements.
j
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
l
i
this letter and its enclosures will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
i
by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.
,
Should you have any questions concerning this inspection, we will be pleased
i
to discuss them with you.
l
i
Sincerely,
t
'
!
.
!
. Bill Beach,
ire to r/
l
Division of Reac
Pri@ cts
.!
,
Enclosures:
.
1.
Appendix A - Notice of Violatio
2.
Appendix B - NRC Inspection Report
!
50-313/93-09; 50-368/93-09
t
cc w/ enclosures:
(
Entergy Operations, Inc.
,
ATTN:
Harry W. Keiser, Executive
i
Vice President & Chief Operating Officer
.
+
T.O. Box 31995
Jackson, Mississippi 39286-1995
-!
"
!
r
.,
'
.
-
_
_ . . -
_
,
t
l
.
.
,
!
.
Entergy Operations, Inc.
-3-
r
I
I
d
Entergy Operations, Inc.
"
ATIN: John R. McGaha, Vice President
!
Operations Support
P.O. Box 31995
i
Jackson, Mississippi -39286
r
Wise, Carter, Child & Caraway
i
ATTN: Robert B. McGehee, Esq.
-l
l
P.O. Box 651
Jackson, Mississippi 39205
l
t
Honorable C. Doug Luningham
'
County Judge of Pope County
Pope County Courthouse
Russellville, Arkansas 72801
l
'
Winston & Strawn
ATIN: Nicholas S. Reynolds, Esq.
1400 L Street, N.W.
,
Washington, D.C.
20005-3502
}
ATTN: Ms. Greta Dicus, Director
Division of Radiation Control and
Emergency Management-
!
4815 West Markham Street
Little Rock, Arkansas 72201-3867
f
!
B&W Nuclear Technologies
ATTN: Robert B. Borsum
~
Licensing Representative
,
1700 Rockville Pike, Suite 525
l
Rockville, Maryland 20852
,
Admiral Kinnaird R. McKee, USN (Ret)
- l
214 South Morris Street
Oxford, Maryland 21654
,
i
ABB Combustion Engineering
Nuclear Power
ATTN: Charles B. Brinkman
Manager, Washington
.,
Nuclear Operations
12300 Twinbrook Parkway, Suite 330
Rockville, Maryland' 20852
l
1'l
.
.
_
- - _
_.
.
-
.
_
-.
l
L:
a
'
-
<
-;
,
- DEC I7 m '
j
Entergy Operations, Inc.
-4_
i
!
[ [$dcitE DMB((IE01) ( -
'i
bec distrib. by RIV:
J. L. Milhoan
Resident-Inspector
l
Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503
.}
MIS System
DRSS-FIPS
I
!
RIV File
Section Chief (DRP\\TSS)-
'
-l
Project Engineer (DRP/D)
A. B. Beach, D:DRP
!
1
.!
.
r
1
!
t
!
I
-
.
!
.
.-
i
i
-.
.I
!
-i
!
RIV:EA:DRP/D*
RI:DRP/D*
_
RI:DRP/D*
SRI:DRP/D*
PE:DRP/D*
i
-t
KDWeaver:vh
SJCampbell
RBVickrey-
LJSmith-
KMKennedy
,j
12/16/93
12/16/93
12/16/93
12/16/93
12 /l'6/93---
_
f
C:/DRP/D*
D:DRP Nk
w>
TFStetka
ABBeach Wg
,
t
._
12/16/93
12/\\7/93
h
- Previously concurred
,
'f
270015
q
i
I
t
,
.
.
.
DEC I7 tgg3
Entergy Operations, Inc.
-4_
1.
h
bec to DMB (IE01)
!
bec distrib. by RIV:
J. L. Milboan
Resident Inspector .
.MNBB 4503
,
Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS:
i
MIS System
DRSS-FIPS
RIV File
Section Chief (DRP\\TSS)
,
Project Engineer (DRP/D)
A. B. Beach, D:DRP
.
!
1
,
RIV:EA:DRP/D*
RI:DRP/D*
RI:DRP/D*
SRI:DRP/D*
PE:DRP/D*
KDWeaver:vh
SJCampbell
RBVickrey
LJSmith
KMKennedy.
'
12/16/93
12/16/93
12/16/93
12/16/93
12/16/93
kk
C:/DRP/D*
D:DRP
\\J
' '
TFStetka
ABBeach jc
s
[12/16/93
12/ll/93
h
- Previously concurred
- -
- -