Forwards Insp Repts 50-313/93-09 & 50-368/93-09 on 931003-1113 & Notice of Violation
ML20058P941
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 12/17/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Yelverton J
ENTERGY OPERATIONS, INC.
Shared Package
ML20058P944 List:
References
NUDOCS 9312280020
Download: ML20058P941 (5)


See also: IR 05000313/1993009

Text

.

SoGIc

UNITED STATES

o

..

ff

qk

NUCLEAR REGULATORY COMMISSION

L

'

- -

_.

(,

f

j

necion iv

I

o

611 RYAN PLAZA DRIVE, SUITE 400

Y,

h

AR LINGTON, T E X AS 76011 -8064

  • - $

.....

DEC I T 1993

Dockets:

50-313

50-368

Licenses: DPR-51

NPF-6

Entergy Operations, Inc.

ATTN:

J. W. Yelverton, Vice President

Operations, Arkansas Nuclear One

Route 3, Box 137G

,

Russellville, Arkansas 72801

SUBJECT:

NRC INSPECTION REPORT 50-313/93-09; 50-368/93-09 (NOTICE OF

VIOLATION)

This refers to the inspection conducted by L. Smith, and other inspectors of

-

this office, on October 3 through November 13, 1993. The inspection included

a review of activities authorized for your Arkansas Nuclear One, Units I and

2, facility. At the conclusion of the inspection, the findings were discussed

with you and those members of your staff identified in the enclosed report..

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress. The purpose of the inspection was to determine

whether activities authorized by the license were conducted safely and in

.;

accordance with NRC requirements.

Based on the results of this inspection, certain licensed activities appeared ~

to be in violation of NRC requirements, as specified in the. enclosed Notice of

Violation (Notice).

The first' violation is of concern because a speed switch

was not replaced on an emergency diesel generator at the end of its apparent

recommended life.

The second violation involved the failure to maintain

postaccident sampling system valves in the position required by the procedure.

1

This violation is of concern because it indicates a lack of control of plant

equipment status.

Two violations, discussed in Sections 2.1.2 and 3.6 of the enclosed report,

!

are not being cited because the criteria in Paragraph VII.B of Appendix C to

'

10 CFR Part 2 of the NRC's " Rules of Practice" were satisfied.

Your staff

took prompt and effective actions to correct these violations.

It is our

- i

'

understanding that, during the exit on November 18, a member of your staff

committed to certain corrective actions. These actions are listed in

Sections 2.1.2 and 3.6 of the enclosed report.

If your understanding of these

commitments differs from ours, please contact us immediately.

!

e

9312280020 931217

PDR

ADDCK 05000313

l

0

PDR._

- .

. . _ - .

.

.

-.

.-

.

-

l

l

-#

+

-;

.

.

t

..

I

Entergy Operations, Inc.

-2-

.l

!

!

l

One unresolved item was identified concerning the failure to implement a

vendor recommended modification to reactor coolant pump seal packages on

i

,

Unit 1.

Further inspection will be performed to-determine whether design

change controls were properly implemented. This matter is discussed in-

l

'?

Section 3.5 of the enclosed inspection report.

You are required to respond to this letter and should follow the instructions

j

specified in the enclosed Notice when preparing your response.

In your.

response, you should document the specific actions taken and any. additional

actions you plan to prevent recurrence. After reviewing your response to this

!

Notice, including your proposed corrective actions and the results of future

!

inspections, the NRC will determine whether further NRC enforcement action is

-

necessary to ensure compliance with NRC regulatory requirements.

j

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

l

i

this letter and its enclosures will be placed in the NRC Public Document Room.

The responses directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

i

by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.

,

Should you have any questions concerning this inspection, we will be pleased

i

to discuss them with you.

l

i

Sincerely,

t

'

!

.

!

. Bill Beach,

ire to r/

l

Division of Reac

Pri@ cts

.!

,

Enclosures:

.

1.

Appendix A - Notice of Violatio

2.

Appendix B - NRC Inspection Report

!

50-313/93-09; 50-368/93-09

t

cc w/ enclosures:

(

Entergy Operations, Inc.

,

ATTN:

Harry W. Keiser, Executive

i

Vice President & Chief Operating Officer

.

+

T.O. Box 31995

Jackson, Mississippi 39286-1995

-!

"

!

r

.,

'

.

-

_

_ . . -

_

,

t

l

.

.

,

!

.

Entergy Operations, Inc.

-3-

r

I

I

d

Entergy Operations, Inc.

"

ATIN: John R. McGaha, Vice President

!

Operations Support

P.O. Box 31995

i

Jackson, Mississippi -39286

r

Wise, Carter, Child & Caraway

i

ATTN: Robert B. McGehee, Esq.

-l

l

P.O. Box 651

Jackson, Mississippi 39205

l

t

Honorable C. Doug Luningham

'

County Judge of Pope County

Pope County Courthouse

Russellville, Arkansas 72801

l

'

Winston & Strawn

ATIN: Nicholas S. Reynolds, Esq.

1400 L Street, N.W.

,

Washington, D.C.

20005-3502

}

Arkansas Department of Health

ATTN: Ms. Greta Dicus, Director

Division of Radiation Control and

Emergency Management-

!

4815 West Markham Street

Little Rock, Arkansas 72201-3867

f

!

B&W Nuclear Technologies

ATTN: Robert B. Borsum

~

Licensing Representative

,

1700 Rockville Pike, Suite 525

l

Rockville, Maryland 20852

,

Admiral Kinnaird R. McKee, USN (Ret)

l

214 South Morris Street

Oxford, Maryland 21654

,

i

ABB Combustion Engineering

Nuclear Power

ATTN: Charles B. Brinkman

Manager, Washington

.,

Nuclear Operations

12300 Twinbrook Parkway, Suite 330

Rockville, Maryland' 20852

l

1'l

.

.

_

- - _

_.

.

-

.

_

-.

l

L:

a

'

-

<

-;

,

DEC I7 m '

j

Entergy Operations, Inc.

-4_

i

!

[ [$dcitE DMB((IE01) ( -

'i

bec distrib. by RIV:

J. L. Milhoan

Resident-Inspector

l

Section Chief (DRP/D)

Lisa Shea, RM/ALF, MS: MNBB 4503

.}

MIS System

DRSS-FIPS

I

!

RIV File

Section Chief (DRP\\TSS)-

'

-l

Project Engineer (DRP/D)

A. B. Beach, D:DRP

!

1

.!

.

r

1

!

t

!

I

-

.

!

.

.-

i

i

-.

.I

!

-i

!

RIV:EA:DRP/D*

RI:DRP/D*

_

RI:DRP/D*

SRI:DRP/D*

PE:DRP/D*

i

-t

KDWeaver:vh

SJCampbell

RBVickrey-

LJSmith-

KMKennedy

,j

12/16/93

12/16/93

12/16/93

12/16/93

12 /l'6/93---

_

f

C:/DRP/D*

D:DRP Nk

w>

TFStetka

ABBeach Wg

,

t

._

12/16/93

12/\\7/93

h

  • Previously concurred

,

'f

270015

q

i

I

t

,

.

.

.

DEC I7 tgg3

Entergy Operations, Inc.

-4_

1.

h

bec to DMB (IE01)

!

bec distrib. by RIV:

J. L. Milboan

Resident Inspector .

.MNBB 4503

,

Section Chief (DRP/D)

Lisa Shea, RM/ALF, MS:

i

MIS System

DRSS-FIPS

RIV File

Section Chief (DRP\\TSS)

,

Project Engineer (DRP/D)

A. B. Beach, D:DRP

.

!

1

,

RIV:EA:DRP/D*

RI:DRP/D*

RI:DRP/D*

SRI:DRP/D*

PE:DRP/D*

KDWeaver:vh

SJCampbell

RBVickrey

LJSmith

KMKennedy.

'

12/16/93

12/16/93

12/16/93

12/16/93

12/16/93

kk

C:/DRP/D*

D:DRP

\\J

' '

TFStetka

ABBeach jc

s

[12/16/93

12/ll/93

h

  • Previously concurred
-

- -