Forwards SALP Repts 50-324/93-44 & 50-325/93-44 for Period 931101-06.Overall Level of Safety Performance at Facility Significantly Improved
ML20058P651
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 12/06/1993
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Richard Anderson
CAROLINA POWER & LIGHT CO.
Shared Package
ML20058P655 List:
References
NUDOCS 9312270219
Download: ML20058P651 (4)


See also: IR 05000324/1993044

Text

e

._

'

-

-R &s

...

[

{D

'

yff

3

R

~

+

~ ~

,n

i'e

1

A

DEC - 61993

"

1[

'

,

\\l'

1

1

Docket /Nos.: ' 50-325, 50 324

V

!

. License Nos.: .DPR-71,-DPR-62

.l

Carolina Power and. Light Company

'i

ATTN: Mr. R. A. Anderson

.Vice President

j

.

<

Brunswick Steam Electric Plant

,l

P. O. Box 10429

j

Southport, NC ~28461

j

t

Gentlemen:

1

a

'

-

SUBJECT:

SYSTEMATIC ASSESSMENT OF LICENSEE. PERFORMANCE (SALP)-

'!

i

The NRC Systemat U Nsessment'of Licensee Performance (SALP) has been:

_

l

. completed for yr

b iswick facility. The facility was evaluated for the

period of Novemy., ., .392, through' November 6,1993. The results ofJ the-

.i

evaluation are documented in the enclosed SALP report. This' report will be

4

.

discussed with you at a public meeting to be held at.the Brunswick Media

,j

Center on December 16,L1993, at 9:00 a.m.

1j

This SALP was conducted under the revised SALP process that was implemented by1

l

'

the Nuclear Regulatory Commission on July. 19, 1993. lThe'~re' vised SALP process

i

rates licensees lin four functional areas: Plant.0perations, Maintenance,'

"n

Engineering, and P1 ant Support'

y

The overall level of safety performance at the Brunswick facility has

9

significantly improved. .During this SALP period,. corporate and' site ,

<!

management's attention to plant safety resulted in excell.ent oversight (and

1

control of plant ~ activities. The very active role:of management was evidsnced

~,

by a. focus on' safety standards,-significantly improvi material ~ condition of-

j

the. plant-and a very successful operating record for Unit:2 since, initial

1

'

restart in April 1993, as well-as.an' excellent Unit 11 shutdown safety-

1

performance.

For this SALP period, Plant 0perations and-Plant. Support werei

l

rated as superior.;-Maintenance and Engineering were; rated as good.

-!

Significant improvement was observed in the effecti' enessiof Maintenance'

1

v

Programs. The success of. the site self-assessment activities to assure

,

readiness of: Unit 2 to restart from 'a year-long unplanned outage was

y

commendable. Continuing challenges noted by the board include further?

-!

improvement of the work control process; reducing the backlogiof maintenance

q

? procedure deficiencies; providing close oversight of the backlog;ofl

J'

Engineering issues and the- transition'of the Nuclear; Engineering Department ~

,

-

organization- to the site and filling. key vacancies; and the Nuclear.- Assessment'

~

~ Department being'more proactive in conducting assessments before problems are

i

identified. ?Although Plant Operations-was rated as-superior overall due to

3

y

5

.

.23'0042

O

'

I

t

9312270219 93120

i

PDR

ADOCK>05000324

'

<

.PDR-

,

,

"

'

DEC - 61993

,

!

Carolina Power and Light' Company

2

excellent performance in several areas, we direct your attention to the

-

challenges identified in the areas of shift duty assignment administration,

,

and coordination with maintenance activities discussed in the SALP report.

.

Our review of your self-assessment efforts indicates that your line management

[

programs in this area were extremely effective, comprehensive, and

sufficiently detailed to identify and correct previously identified problems

>

with weak performance. Of particular note were your assessments of

,

organizational and safety system readiness prior to Unit 2 restart. The

challenges identified in this report concerning oversight of design

'

engineering activities were exceptions which continued through the SALP

,

period.

l

,

In accordance with Section 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosure will be placed in the-NRC Public Document Room.

,.

'

No reply to this letter is required; however, should you have any questions or

comments, I would be pleased to discuss them with you.

1

Sincerely,

j

Original signed by:

i

Stewart D. Ebneter

Stewart D. Ebneter

!

Regional Administrator

i

!

Enclosure:

i

SALP report

3

cc w/ encl:

!

H. W. Habermeyer, Jr.

r

Vice President

Nuclear Services Department

Carolina Power & Light Company

l

P. O. Box 1551

- Mail OHS 7

!

Raleigh, NC 27602

J. P. Cowan

j

Plant Manager Unit 1

!

Brunswick Steam Electric Plant

!

P. O. Box 10429

l

Southport, NC 28461

C. C. Warren

l

Plant Manager Unit 2

Brunswick Steam Electric Plant

P. O. Box 10429

!

Southport, NC 28461

j

'

(cc w/ encl cont'J - See page 3)

,

,

.

t

-

.

Carolina Power and Light Company'

3

. DEC - 6 1993

i

(cc w/ encl cont'd)

l

Mark S. Calvert

.

Associate General Counsel

!

Carolina Power and Light Companj

!

P. O. Box 1551

.!

'

Raleigh, NC 27602

Don Warren, Chairman

Board of Commissioners

P. O. Box 249

.,

Bolivia, NC 28422

Dayne H. Brown, Director

Division of Radiation Protection

!

N. C. Department of Environment,

Commerce & Natural Resources

i

P. O. Box 27687

Raleigh, NC 27611-7687

y

a

Karen E. Long

Assistant Attorney General

'

State of North Carolina

P. O. Box 629

Raleigh, NC 27602

'j

l

Robert.P. Gruber

,

Executive Director-

Public Staff - NCUC

!

P. O. Box 29520

i

Raleigh, NC 27626-0520

)

Public Service Commission

State of South Carolina

o

P. O. Box 11649

Columbia, SC 29211

1

Mayor

City of Wilmington

City Hall

P. O. Box 1810

Wilmington, NC 28402

INP0-

700 Galleria Parkway

Atlanta, GA 30339-5957

-

(bec w/ encl cont'd - See page 4)

- . . .

.

l

.

>

Carolina Power and Light Company

4

DEC - 6 $Q3

,

L

bcc w/ encl:

>

l

Document Control Desk

H. Christensen, RII

P. Milano, NRR

,

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Star Route 1, Box 208

Southport, NC 28461

i

'

The Chairman

Commissioner Rogers

Commissioner Remick

-

Commissioner de Planque

J. M. Taylor, EDO

H. L. Thompson, Jr., EDO

J. A. Mitchell, Regional

Coordinator, EDO

T. E. Murley, NRR

S. Varga, NRR

G. Lainas, NRR

S. Bajwa, NRR

F. Allenspach, SALP Coordinator, NRR

Regional Administrators, RI, RIII

.

'

RIV, and RV

K. Clark, RII, PA0

D. M. Verrelli, DRP, RII

M. V. Sinkule, DRP, RII

A. R. Herdt, DRP, RII

R. V. Crlenjak, DRP, RII

-

DRS and DRSS Branch Chiefs

'

Document Control Desk

l

.c

i

y

k)

NRWEB:

RII4

SS

RII -d

'

RII:DR e II:DRP

RI

R

DVerrelli NBajwa

JSt'ohr

AGi

n

R

yatle

H

stensen

11/ d/93

II/d/93

11

/93-

j

ll/C(/93

11/q/93

11/tj/93

3

//

<

R I:DRP

RII.

/

~

JJ h son

te

13,/93

14s

j

93

i