ML20058P478

From kanterella
Jump to navigation Jump to search
Discusses Insp Rept for License NPF-30 on 920801-0923 & Forwards Notice of Violation
ML20058P478
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/15/1993
From: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20058P483 List:
References
IEIN-92-030, IEIN-92-30, NUDOCS 9310250046
Download: ML20058P478 (2)


Text

.

M t

DCT 15 EG3 Docket No.

50-483 License No. NPF-30 Union Electric Company ATTN: Mr. Donald F. Schnell Senior Vice President - Nuclear Post Office Box 149 - Mail Code 400 St. Louis, MO 63166

Dear Mr. Schnell:

SDL

'T:

FALSIFICATION OF PLANT RECORDS This refers to the NRC inspection conducted on August I through September 23, 1992, at the Callaway Nuclear Power Plant to review, in part, the actions taken by you to determine the potential for record falsification at your facility.

Information Notice (IN) 92-30, " Falsification of Plant Records," was issued on April 23, 1992, to alert all licensees of the NRC's concern that plant mechanics, technicians, and operators may have falsified plant records at several nuclear plants. As a result of your review, you identified 14 records that you determined were incomplete or inaccurate.

The NRC is concerned about the apparent misconduct on the part of the plant personnel involved with those records. Because the NRC must be able to rely on the professionalism and integrity of personnel who perform safety-related activities, including log taking and record keeping, such misconduct cannot be tolerated. Therefore, the NRC is issuing the enclosed Notice of Violation (Notice) to document that concern and to emphasize your management's responsibility to assure that your records are complete and accurate.

However, after considering the facts of this case, including your identification of the violation and the corrective actions taken (disciplinary action against the offending individuals and/or program upgrades to improve the log keeping process), the NRC has decided not to assign a severity level r0g to the violation, nor require a response to the Notice.

E In the future, similar violations may result in escalated enforcement action.

III In addition, enforcement action can be taken against not only the facility licensee for the inaccurate or incomplete information (see 10 CFR 50.9(a)),

but also against any individual who engages in deliberate misconduct that causes, or but for detection, would have caused a licensee to be in violation of a requirement for providing accurate information to you or the NRC (see 10 CFR 50.5).

-l 1

9310250046 931015 ADOCK 0500 j3 DR

~

OCT 151993 Union Electric Company 2

)

)

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of 3

this letter will be placed in the NRC's PLblic Document Room (PDR).

Cr:9:1 E! ned by Jcha 2,!.Srtia -

l John B. Martin Regional Administrator

Enclosure:

As Stated cc w/ enclosure:

l l.

G. L. Randolph, Vice President, Nuclear Operations J. V. Laux, Manager Quality Assurance S. E. Sampson, Supervising Engineer, S'te Licensing OC/LFDCB Resider ** Inspector, P.III Region R~

Resident Inspector, Wolf Creek K. Drey C. John Renken, Engineer Policy i Federal Dept.

Gerald Charnoff, Esq.

l R. A. Kucera, Deputy Director, Department of Natural Resources Chairman, Illinois Commerce Commission bec:

PUBLIC i

l l

69 RIII

>I RI RII II)

RIII RIT RIII [

0k +

h)b

'f f

W{

r M[B 4 Ads &

}f

' g\\6%y Gr]e f,

tiller Gianna W

1.

Lanksbury Greger tean

.aYtin l

lDf ?