Corrections to Proposed Tech Specs,Changing Inserts for Proposed Changes Page & Correcting Typo on Table 3.3.7.5-1
ML20058P212
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 12/14/1993
From:
Public Service Enterprise Group
To:
Shared Package
ML20058P209 List:
References
NUDOCS 9312230149
Download: ML20058P212 (2)


Text

-

DEERPS KR IHOIOSED ODNGES DEERP 1 DEERP 2 INSERP 3 1

80 l

INSERP 4 Average bulk pool tasperature Acoustic monitorirg and tailpipe tenperature High range noble gas monitors if One channel consists of the open limit switch, and the other channel ccrisists of the closed limit switch l

INSERP 5 ACTICH 80 -

With the number of OPERABIE channels less than the Required Number a.

of Channels shown in Table 3.3.7.5-1, restore the inoperable channel to OPIRABIE status within 30 days, or 4==htely initiate actions in accordance with Specification 6.9.2.

b.

With the number of OPERABLE channels less than the Mininum Number of Channels shown in Table 3.3.7.5-1, (except for the Primary contalment Hy&upVOxygen Corumiuation Analyzer and Monitor and the D:ywell Atmosphere Post Accident Radiation lenitor) restore at least one inoperable channel to OPERABIE status within 7 days, or be in at least IDr SHUIDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in CDID SHUIDOWN in the followirq 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

With the number of OPERABIE Primary Containment Hyiup/ Oxygen c.

Carmiuation Analyzer arri Penitor channels less than the Mininnn Number of Channels requirement shown in Table 3.3.7.5-1, restore at least one inoperable channel to OPERABIE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or be in at least IUr SIUIDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in CDID SHUIDOWN in the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

d.

With the punhar of OPERABIE Drywell Atmosphere Post Aa:ident Padiation Penitor channels less than the Minimum Number of Chanrsels i

l requirement shown in Table 3.3.7.5-1, initiate action in accortlance with ACTICH 81, below.

l 1

i

\\

l 9312230149 931214 ADOCK0500g4

{

PDR P

A Tacte 3.3.7 i-l :crt:.sec)

A~C*'ENT HONI :p N IN$ MLMEN T *:N A TICN suTEMENT5 INSERT 5-

~

4.. : -omDDD/%

a.

M :n.- wmoer of OPERABLE accident monitoring instrumen3ad cnannels,

tnan tne Recuired Numoer of Channels n in Taole 3.3,7.5-1, resto ne inoperaole channel (s)

RA81.E status l

  • itnin 7 days or be i least HOT SH' witnin tne next 12 nours and in COLD 5HUTO i

the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

(b.

Witn the number of LE accident me ing instrumentation channels les n the Minimum Channels OPER equirements of Taole 1

.5-1, restore the inoperaole channel (s)

ERABLE as within 28 hours3.240741e-4 days <br />0.00778 hours <br />4.62963e-5 weeks <br />1.0654e-5 months <br /> or be in at least HOT SHUTDOWN wit.

ne n xt 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> i

ACT:CN 31 -

With the number of OPERABLE accident monitoring instrumentation channels less than recuired by the Minimum Channels OPERABLE requirement, either restore the inoperable channel (s) to CPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or:

a.

Initiate the preplanned alternate method of monitoring the appropriate parameter (s), and b.

Prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.

ACTION 82 -

a.

With the number of OPERABLE accident monitoring instrumentation channels less than the Required Number of Channels shown in Table 3.3.7.5-1, verify the valve (s) position by use of alternate indica-tion methods.

If the affected penetration is not isolated by either (i) a closed manual valve, (ii) a blind flange, or (iii) a deactivate:

automatic valve located outside primary containment, restore the inoperable channel (s) to OPERABLE status within 30 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b.

With the number of OPERABLE accident monitoring instrumentation channels less than the Minimum Channels OPERABLE aquirements of Table 3.3.7.5-1, verify the valve (s) position by use of alternate indication methods.

If the affected pehetration is not isolated by either (i) a closed manual valve, (ii) a blind flange, or (iii) a deactivated automatic valve located outside primary containment, restere the inoperable channel (s) to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN witnin the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

HOPE CREEK 3/4 3-86 Amencment No.