Southem Califomia Edison Company 23 PARKEH S'i HEE'T IFtVINE. CALIFOf tNIA Ed2718 October 20, 1993 w*a t n o uxn,,,,
MANA(JFM C# NMA F. AH HF (M fLA FOHV AF'F AIF4%
(714).464 4403 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555 Attention: Mr. Robert M. Gallo, Chief Operator Licensing Branch, 0WFN-10D22
Dear Mr. Gallo:
Subject:
Docket Nos. 50-361 and 50-362 Response to Administrative Letter 93-03 San Onofre Nuclear Generating Station Units 2 and 3
Reference:
1)
Administrative Letter 93-03, " Operator Licensing National Examination Schedule," dated September 7, 1993 2)
Letter from Walter C. Marsh.(SCE) to Robert M. Gallo (NRC),
dated September 7,1993;
Subject:
Docket Nos. 50361 and 50-362, Request for a Change to the Operator National Examination Schedule, San Onofre Nuclear Generating, Units 2 and 3
\\
This letter provides the Southern California Edison (SCE) response to NRC Administrative Letter 93-03, " Operator Licensing National Examination Schedule" dated September 7, 1993.
The schedules on the enclosed sheet are an update to those provided in Reference 2 and provide SCE'S best estimate to meet our operator licensing needs through FY 1997.
If you have any questions, please contact me.
Sincerely, MO 4
Enclosure cc:
B. H. Faulkenberry, Regional Administrator, NRC Region V NRC Senior Resident Inspector's Office, San Onofre Units 1, 2 & 3 H. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 yyjoo3 9310220152 931020 D
{DR ADOCK 05000361 h I[ l PDR sf
I o*
C#PROVEDBVOMS: NO. 31So.ot 31 l AC FCAM 536 U.S. NUCLEAR REGULATORY COMMISSION
. EXP1RES: s/st/s4 r
z um ES*lMA'ED BURDEN PER AESPoNSE To COMPLY wtTM TMs NFoauATcN CoLLEC*CN REQUEST: 2 6, FoaWA OPERATOR LICENSING couuEc, nEcA,0.o unoEN EsmATE To,NE
,cRuA mc
^"o "So a $ "^^^"5"5"' '*"C" ("*** 7 i. u 8 "uC'r" EXAMINATION DATA RE3ULAtoRY Couu:$ SON, WASMNQToN. DC 20$5SotC1, AND TC THE PAPERWoAK REDuCT1oN PAGECT (31304131), OFFICE oF MANAGEuENT AND BuoGET,WASMNGTfH,DC 236C3.
NRC REQ @N F A CILITY Docket Nos. 50-361 and 50-362 1
San Onofre Nuclear Generating Station y
Units 2 and 3 A. PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE Fy 19 94 ry 19 9 b FY 19 96 FY 19 97 pejol/M oe/w/b po/ot/b b ef95 i po/=it_9_3.ce/w/ 2f; pozotf.2f_.eein,.17J 1'
ASSGNED CAM
,E oENE=C LErtra ot4.<o 04-94 04-L 04-96 04-97 L
NUMBERoF atACToa o*Euroas 2
0 0
0
?
NVuSEA 0F SENCA h"'ToA oeEwoes - astwt 2
0 0
0 NuueEn oF sENoa mEACrom oatuToas - uaouce 0
0 0
0 Nuusta on sENca sa,. oa ontwons - vunto 0
0 0
0 2.
A$$4NED DA*E PER GENERsC LETTER GL4643 10-94 10-95 10-96 10-97 NUMSER of arxtoa ePEuToas 0
0 0
0 4
NVuSER of SENCa REAC*oR i
ceEwoas - =swt 0
0 0
0 l
NUuGER of $ENCA AEAC'oR oeEuroas - uasu:E O
O 0
0 NuusEm of sENea %,oa o Eurons - uu In 0
0 0
0 B. PROPOSED REQUALIFICATION EXAMINATION SCHEDULE i
FY 19 94 FY 19 9b FY 19 96 FY 19 97 potoifd. ce/x/,9,4J po/oi/b.2/w/95 po/o,f_9 5. c./xf 96 p f.,f _9&e,fxf 97 i
z 3
01-03-94 10-10-94 10-09-95 10-07-97 1
- 2. citt MExa:
~01-10-94 10-17-94 10-16-95 10-14-97 01-17-94 10-24-94 10-23-95 10-21-97
' ^ ' " " "
01-24-94 10-31-94 10-30-95 10-28-97
* "'I
- 01-31-94 11-07-94 11-06-95 11-04-97 N/A N/A N/A N/A j
C. PROPOSED GENERIC FUNDAMENTAL EXAMINATION SCHEDULE FY 94 OCTOBER 1994 FEBRUARY 19 95 JUNE 1995 ESTtMATED NUMBER OF CANDIDATES 0
0 0
i a
N5c Fonu saa e sa e
l