Monthly Operating Rept for Sept 1993 for Oyster Creek Nuclear Generating Station
ML20058P182
Person / Time
Site: Oyster Creek
Issue date: 09/30/1993
From: J. J. Barton, Colby M, Krall J
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
C321-93-2290, NUDOCS 9310220139
Download: ML20058P182 (7)


Text

. .

4

.e GPU Nuclear Corporation Q gf (J Post Office Box 388 Route 9 South Forked River, New Jersey 08731-0388.

609 971-4000 Writer's Direct Dial Number:

C321-93-2290 October 14, 1993 t

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Dear Sir:

Subject:

Oyster Creek Nuclear Generating Station '

Docket No. 50-219 Monthly Operating Report In accordance with the Oyster Creek Nuclear Generating Station Operating License No. DPR-16, Appendix A, Section 6.9.1.C, enclosed are two (2) copies of the Monthly Operating Data (gray book information) for the Oyster Creek Nuclear Generating Station.

If you should have any questions, please contact Brenda DeMerchant, Oyster ,

Creek Licensing Engineer at (609) 971-4642.

S' cerel ,

j e

J J. arton V qq President and Director ysTer Creek JJB/BDEM: Jc Attachment  :

(MOR-RPT.5EP) l cc: -

Administrator, Region 1 i Senior NRC Resident Inspector _,

Oyster Creek NRC Project Manager j I

1 l

l

^

4onno 9310220139 930930 70 PDR ADOCK 05000219 !M R PDR W 1

\

GPU Nuclear Corporato s a subsidian of General Pubhc utihbes Ccrporation [bY -

H

SUMMARY

SEPTEMBER. 1993 l

Oyster Creek entered September operating at full power. The plant maintained full power operation throughout the month and generated 437,183 net electric megawatt hours.

I l

1' i

J tt0NJ11LY OP RATING R1PORJ LICMSffl_YENT REPORIS The f ollowing Licensee Event Reports were submitted during the month of September, 1993:

None

(

l l

i 1

l J

  • Oyster Creek Station #1 Docket No. 50-219 l

REFUELING INFORMATION - SEPTEMBER, 1993 Name of Facility: Oyster Creek Station #1 Scheduled date for next refueling shutdown: currently projected for September,1994 Scheduled date for restart following refueling: Currently projected for December, 1994 Will refueling or resumption of operation thereafter require a Technical _

Specification change or other license amendment?

No Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

1. General Electric Fuel Assemblies - Fuel design and performance analysis methods have been approved by the NRC.

The number of fuel assemblies (a) in the core = 560 (b) in the spent fuel storage pool = 1878 (c) in dry storage = 8 The present licensed spent fuel pool storage capace y and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

Present Licensed Capacity: 2600 The projected date af the last refueling that can be discharged to the spent fuel pool ascuming the present licensed capacity:

ruil . ore discharge capacity to the spent fuel pool will be available through the 1996 refueling outage.

NRC_RPT.WPD/99

t

. i i

. AVERAGE DAILY POWER LEVEL NET MWe DOCKE2 #. . . . . . . .. . . .50-219 .

UNIT. . . . . . . . . OYSTER CREEK #1 {

REPORT DATE. . . . . . . . . 10-13-93 $

COMPILED BY . . . . . . . . JIM KRALL TELEPHONE # . . . . . . .609-971-4115 MONTH: SEPTEMBER, 1993 i

DAL MH EAX ME

1. 595 16. 604
2. 597 17. 613
3. 589 18. 616
4. 596 19. 617 ,
5. 596 20. 618
6. 597 21. 617
7. 597 22. 618
8. 600 23. 617 -
9. 602 24. 612
10. 602 25. 617 l
11. 607 26. 611 ,
12. 610 27. 608
13. 607 28. 615 i
14. 603 29. 617
15. 601 30. 619 L

l i

NRC_RPT.WPD/99

. ~.

a OPERATING DATA REPORT OPERATING STATUS  !

1. DOCKET: 50-219  ;
2. REPORTING PERIOD: 09/93- i
3. UTILITY CONTACT: JIM KRALL (609)971-4115 {
4. LICENSED THERMAL POWER (MWt): 1930
5. NAMEPLATE RATING (CROSS MWe): 687.5 x 0.8 = 550
6. DESIGN ELECTRICAL RATING (NET MWe): 650
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 63? ,
8. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 610
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS: .

NONE

10. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): ,

NONE  !

11. REASON FOR RESTRICTION, IF ANY:

NONE MONTH YEAR CUMULATIVE ,

12. REPORT PERIOD HOURS 720.0 6551.0 208391.0 ,

i

13. HOURS RX CRITICAL 720.0 5481.6 137390.0-
14. RX RESERVE SHUTDOWN HRS 0.0 0.0 918.2
15. HRS GENERATOR ON-LINE 720.0 5445.4 133992.7
16. UT RESERVE SHTDWN HRS 0.0 0.0 1208.6

+

17. GROSS THERM ENERGY (MWH) 1387584 10361879 228870633 j
18. GROSS ELEC ENERGY (MWH) 454156 3420353 76816491 {
19. NET ELEC ENERGY (MWH) 437183 3287820 73671444
20. UT SERVICE FACTOR 100.0 83.1 64.3
21. UT AVAIL FACTOR 100.0 83.1 64.3
22. UT CAP FACTOR (MDC NET) 99.5 82.3 57.7
23. UT CAP FACTOR (DER NET) 93.4 77.2 54.4
24. UT FORCED OUTAGE RATE 0.0 0.0 10.6
25. FORCED OUTAGE HRS 0.0 0.0 15957.3
26. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION):

t NONE

27. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:

N/A  :

NRC_RPT WPD/101 [

i

(

l I l

m o

w r

o . ,

S js d T an o -

N mo i ~

E o i r ~

M nrt e .

P oc s p EO e ui VC rsdh g I/ e net n TS wwr i CN o gt EO ed rnr RI rt eio e uwr p RT OC hh oue .

CA Ts pd r 3 .

~

9 9

R e GO) -

k 1 b N 2 e l I R( -

e 5 .

o TO r C TTR .

C r l

8 1

NCE I AW 9 r be e 8 SEO .

1 e o ha 4- RP 2 t F

- s t c 1 OEG .

0 v c i 7 HN 5 O O M 9 DTI O C ,

HNU ,

TWD

EOE .

Y MDt e B :

OE E ,

NM DN A O TN I  : 'T LP H ETEPE )

1 m

a )n ri -

CI TML OEAOE ( mca aSl S D L' DCT N r p N O ccx m O S SiE +.

I T A t (

C E D ll a .-

U R O aamr ~

D H uuoe .-

E T nnth R E aaut MMMAO -

R T ) . . .

C 2123

(

4. ,

P D

N N A O )s ,

I .

S T r .

Aou R h M U t D m

f. a a

)

n a

e E i S a -

e l T i p .

I L m E

S L & (

g r -

n o i r) ner n i vEi ai a d rtl l E T aap ,

e rnx P l -

Yd u rt oE T ed osi( .

ce t it rh ana ri r e r

oc e meh FS pd pt

~

OAOO -

2 FS: . . . .

ef sh

) .

3 9

n +

+

i 9 E a .

1 T l ,

r A p n e D m o E i b ( t t m s c e ee i ,

t p rT r e

u t -

l r s S l o e a .R ~

F. e c y .

t n g' r E

nano enit ,

T . eel a .

N o N pt el a

O N O inus m N  : S uif s YA qae o T RE EMRR ~

R AR ,

O M .

P E

R

  • M)

L1 S(

ab. . cd.. S gn 0

.