Discusses NRC Acceptance of Topical Rept EMF-92-081, Statistical Setpoint/Transient Methodology for W Type Reactors
ML20058P135
Person / Time
Site: Framatome ANP Richland
Issue date: 12/10/1993
From: Thadani A C
Office of Nuclear Reactor Regulation
To: Copeland R
SIEMENS CORP.
Shared Package
ML20058P104 List:
References
NUDOCS 9312230087
Download: ML20058P135 (1)


Text

ga c%g

',% a 4

E

)*

E UNITED STATES i

1!

NUCLEAR REGULATORY COMMISSION

\\..v WASHINGTON, D.C. 20555-0001 December 10, 1993 Mr. R. A. Copeland Manager, Reload Licensing Siemens NJclear Power Corporation 2101 Horn Rapids Road P.O. Box 130 Richland, WA 99352-0130 i

Dear Mr. Copeland:

SUBJECT:

ACCEPTANCE FOR REFERENCING OF LICENSING TOPICAL REPORT EMF-92-081,

" STATISTICAL SETP0 INT / TRANSIENT METHODOLOGY FOR WESTINGHOUSE TYPE REACTORS" (TAC NO. M85061)

The staff has reviewed the topical report submitted by Siemens Nuclear Power Corporation by letter dated May 29, 1992.

The report is acceptable for referencing in license applications to the extent specified and under the limitations stated in the enclosed report and U.S. Nuclear Regulatory Commission (NRC) evaluation. The evaluation defines the basis for acceptance of the report.

The staff will not repeat its review of the mai.ters described in the report and found acceptable when the report appears as a reference in license applications, except to assure that the material presented applies to the specific plant involved. NRC acceptance applies only to the matters described in the report.

In accordance with procedures established in NUREG-0390, the NRC requests that Siemens Nuclear Power Corporation publish accepted versions of the report, proprietary and non-proprietary, within 3 months of receipt of this letter. The accepted versions shall incorporate this letter and the enclosed evaluation between the title page and the abstract and an -A (desi nating accepted) following the report identification symbol.

g If the NRC's criteria or regulations change so that its conclusion that the report is acceptable is invalidated, Siemens Nuclear Power Corporation and/or the applicant referencing the topical report will be expected to revise and resubmit its respective documentation,. or submit justification for the continued applicability of the topical report without revision of the respective documentation.

Sincer y AQ/O)' W 1

Asho C. Thadan b tor Divi ion of Systems Safety and Analysis Office of Nuclear Reactor Regulation

Enclosure:

EMF-92-081 Evaluation 3 S t rSCO I7 i

93122300B7 931210 PDR TOPRP ErfVEXXN C

PDR 1

e