Addresses Degraded Grid Voltage Relay Setting Limits Issue, Per Analysis Completed on 930107 of ABB Impell Calculation 0870-150-007,Rev 0
ML20058N963
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/15/1993
From: Link B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-93-134 VPNPD-93-212, NUDOCS 9312220345
Download: ML20058N963 (4)


Text

_. - _.

f

~

Wisconsin Electnc POWER COMPANY 2M W Mougan no k,= 204e Mwasee wi 5320b2045 (414D'212345 VPNPD 212 NRC-93-134 December 15, 1993 l

Document Control Desk U.S.

NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Gentlemen:

l DOCKETS 50-266 AND 50-301 l

D_EGRADED GRID VOLTAGE RELAY SETTING LIMITS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 On January 7, 1993, Wisconsin Electric (WE) completed an analysis of ABB Impell Calculation 0870-150-007, Revision O.

The analysis l

indicated that the existing settings for the Point Beach Nuclear l

Plant degraded grid voltage relays could be too low to adequately protect all safety >related equipment from operating at voltages below proven capability.

Technical Specification Table 15.3.5-1, Item 9,

" Degraded Voltage (4.16 kV)", contained a required setting of 23875 volts 12%.

The analysis indicated that operation at voltages just above the minimum required by this technical specification requirement could result in operation of equipment at lower than required voltages.

Therefore, all 4160 volt degraded grid voltage protection channels were declared inoperable at 1515 CST on January 7, 1993, invoking the shut down requirements of Technical Specification 15.3.0,

" Limiting Conditions for Operation."

A Nuclear Reactor Regulation Temporary Waiver of Compliance was l

requested and granted to allow time to determine new setting l

limits, calibrate the relays, submit a Technical Specification Change Request, and receive a license amendment for the setting limit change.

New setting limits were determined and relay setting changes were completed January 15, 1993.

A Technical Specification l

Change Request was submitted to the Nuclear Regulatory Commission l

by letter dated January 19, 1993, and amendments were issued on l

March 26, 1993.

Licensee Event Report 93-001-00 submitted on February 16, 1993, provides additional information concerning this issue.

l 9312220345 931215

[)['f ~

l PDR ADOCK 05000266 i

p PDR ff0

.4 m sur m a uhcom m u n e a m n u m m

l

,1 i

Document Control Desk December 15, 1993 Page 2 The current Technical Specification degraded grid voltage relay l

setting limit is 3959 i 1/2% as determined in WE Calculation i

N-93-002, Revision O.

However, this setting did not include the l

quantification of the errors in the potential transformers, the degraded grid voltage relays, and the voltmeters used to calibrate the relays.

The accuracy of these devices had not been determined at that time.

The 3959 i 1/2% setting limit was used because it l

was our judgement that the calculation was conservative due to the 1

assumptions used to quantify the electrical loads during-the worst case postulated conditions which were the basis for the calcula-tion.

l i

It was our-judgement that refining the calculation by using actual measured loads would result in a lower minimum allowable voltage on the 4160 volt safeguards busses, thus providing sufficient margin i

between the relay settings and the minimum required voltage to accommodate the relay and transformer accuracy tolerances.

Technical Specification Change Request 161, submitted to the NRC on January 19, 1993, noted this and stated that field measurements and verifications would be performed during'1993 to verify and refine the existing calculation inputs, assumptions, and results.

These measurements were to include quantifying actual relay calibration and potential transformer tolerances.

Our commitment to perform these measurements and verifications was also identified in the NRC Safety Evaluation for Technical Specification Amendments 137 and 141 for Units 1 and 2 respectively, issued by the NRC on March 26, 1993.

Prior to initiating these measurements, we decided to review other options which would demonstrate the acceptability of the new Technical Specification setting limits and account for the inaccuracies of the relay circuits.

Additional information was obtained from the manufacturers and from past studies which contain test data on some of the larger safeguards loads.

After review of this information, it was determined that the inputs and assumptions in Calculation N-93-002, Revision 0, were not overly conservative as they applied to major loads and impedances of system components.

With regard to the major loads, it was our judgement that additional field measurements would not yield significantly different results from those obtained from manufacturers and previous tests.

With regard to the relay circuits, information from the manufacturers of the existing relays and potential transformers showed that the accuracy of these devices was relatively high.

Therefore, based on the conclusion that field measurements would not yield significantly different load inputs and the relatively high accuracy of the relay circuits, appropriate degraded grid voltage relay setting limits can be determined without additional field measurements.

f i

I i

Document Control Desk f

December 15, 1993 i

I Page 3 Inputs from Calculation N-91-016, "PBNP Diesel Generator Loading Calculation," were used to refine the loading inputs in Revision 0 of Calculation N-93-002 to generate Revision 1.

These inputs I

consisted of data from pump brake horsepower curves and previous field measurements for the majority of the large safeguards loads.

l Also, administrative controls are in effect which will limit the j

maximum load on the limiting 4160 volt safeguards bus (1A-05).

i These controls will assure that the terminal voltage for the limiting load (Containment Recirculation Fan 1W-1B1) will not fall below the 90% of rated voltage requirement.

The remaining loads, including the non-safety related motors, were kept at the conservative values utilized in the initial calculation.

j WE Calculation N-93-002, Revision 1, based on the above input i

modifications, indicates that the minimum sustained bus voltage required for proper operation of safeguards equipment on the Unit 1

~

i 4160 volt Train A safeguards bus (1-A05) is 3941 volts.

The other i

4160 volt safeguards busses (1-A06, 2-A05, and 2-A06) have slightly lower minimum voltage requirements.

Therefore, 3931 volts will be used as the basis for the degraded voltage relay setting limit for all 4160 volt safeguards busses to maintain consistent settings for j

the degraded grid voltage relays.

An additional calculation (N-93-098, Revision 1) was prepared to quantify the maximum error associated with the operation of the degraded grid voltage relay circuits.

The guidance provided in ANSI /ISA-S67.04-1988 was utilized for combining the errors i

associated with each component of the relay circuit and the relay calibration process.

i The Technical Specification degraded voltage relay setting limit should be 23944 volts to properly allow for PT and voltmeter errots

}

as determined by Calculation N-93-098, Revision 1.

The proposed degraded voltage relay setting limit of 13944 volts is 5 volts higher than the current tolerance would allow (3959 - 1/2%

3959 = 3939 volts).

We have verified that the current relay settings in the plant are 23944 volts.

Therefore, this proposed i

setting limit is currently being met.

We propose to change this Technical Specification setting limit to 23944 volts.

This format for the setpoint, consistent with the presentation of other setting and safety limits in the Technical Specifications, is more appropriate than the current format of 3959 volts i 1/2%.

The new higher degraded voltage setting limit of 23944 volts is substantially higher than the previous setting of 3875 volts 12%

and therefore much closer to the notmal operating voltage of the 4 kV system.

This has raised our concern about the existing ITE 27D degraded grid voltage relays and the voltmeters used to calibrate the relays.

There is an increased possibility that the degraded grid voltage relays will not reset after short-term voltage dips because the ITE 27D relays have a wide deadband

l l

Document Control Desk December 15, 1993 Page 4 l

between the dropout setting of the relay and the voltage required to pick the relay up again.

Therefore, we have decided to replace the ITE 27D relays with ASEA Brown Boveri -(ABB) 27N relays which have an adjustable pickup setting.

This allows the setting of a much smaller deadband than the ITE 27D relay.

The new ABB 27N degraded grid undervoltage relays will be installed in early 1994 in conjunction with the planned annual diesel generator outages.

We expect to replace all the degraded grid undervoltage relays by March 31, 1994.

The voltmeters used previously to calibrate the degraded grid relays were rated by the manufacturer as having a 0.5% accuracy.

The last annual calibration tests of these voltmeters showed all to be within a 0.09% accuracy range, which is within the 0.1%

accuracy range used in Calculation N-93-098, Revision 1.

Future calibrations of the degraded grid voltage relays will be performed with meters that have a manufacturer's rated accuracy of 10.1%

accuracy to ensure that the 0.1% voltmeter accuracy is maintained.

In summary, the following additional actions are planned:

1)

Replace the existing ITE 27D degraded grid voltage relays on i

each of the four 4160 volt safeguard busses with the more accurate ABB 27N undervoltage relays.

This will be completed during the annual diesel generator outages in the first quarter of 1994.

2)

Revise the calibration procedures for the degraded grid voltage relays to assure the use of calibration equipment with accuracies as assumed in Wisconsin Electric Calculation N-93-098, Revision 1.

This will be done prior to the j

installation of the new ABB 27N relays in the first quarter of 1994.

3)

Revise Technical Specification Table 15.3.5-1, Item 9, to change the setting limit from 3959 volts 11/2% to >3944 volts.

This change will be submitted by March 1994.

Please feel free to contact us if you have any questions.

Sincerely,

-(

~

=

Bob Link Vice President Nuclear Power CAC/jg cc:

NRC Regional Administrator, Region III NRC Resident Inspector e

- - -