Proposed Tech Specs Deleting Ambiguous Paragraph in Bases for Tech Spec 3.0.3
ML20058N692
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/10/1990
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20058N690 List:
References
NUDOCS 9008140480
Download: ML20058N692 (1)


Text

__ _ . _ _ _ _ __ . . _ . . _ _ _ _ _ _ _ _ _ _

v =.[ , , .

1 AMnsd 2 ,

f :3/A.0 APPLICABILITY ,

BASES (Con't)-

e ,

-The time limits of Specification 3.0.3 allow 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> for the plant to be in COLD SHUTDOWN when a shutdown is required during POWER operation. If the plant is in a lower CONDITION of operation when a shutdown is required, the  ;

-time limit for reaching the next lower CONDITION of operation' applies.  !

, However, if a lower CONDITION of operation is reached in less time than allowed. the total allowable time to reach COLD SHUTDOWN, or other OPERATIONAL CONDITION, is not reduced. For example, if STARTUP is reached in E hours, the -!

time allowed to reach HOT SHUTDOWN is the next 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br /> because the total time to reach HOT SHUTDOWN is not reduced from the allowable limit of 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />.

Therefore, if remedial measures are completed that would permit a return to POWER operation, a penalty is not incurred by having to reach a lower CONDITION of operation in less than the total time allowed. 4

'b: C: ;r'n';l: 0;1'r th 7; r' t; th: :ll;~.:-th ;;." ;; tt; itit; ^'

th;; ",CT!0% n .ir . ;;t:, i' rOi== z'th thed.0T!C+' n;.irx ;t: fr :=

ni=^'= r="it- ir rtr/ 'nt: r CM"".T!0M.. 00M0!'!0M r nadi= ;'

. ; :r t' r '- t r t'- C r r t'-- '- 9 '-5 th: xx'n x^.: Of th: ' t'th; 0x;"

___u__<tir,, 'n, _ 0;r.t'_n r: =_ t

=_,,0.,_2 I' th: x; :;n_inti=_ _in ux u_ 2,,,_______ _. < 22_; ._ <_

' m ' ' m ' ".' . : '" ! , ' ""' , _'" . 3'Il l ' :' ' ""' _ ' _ J, '":: " ;' ' n ~ "" _ ' "' e

'4 4 z24 ' .!'I' ;E: u_;I' '; 'n.n"' z" 'il?'r"": c '1"": .""12 ',' . ... m Z x'II' 'I' "C' . . T ': " '. "'r m ' m ' 'G "':.l"' _ '12"X _ !"'1" """ "'

( 'a ':x"JTL "' 'I_III: _ - ' L"' i'_ ',' _'E r n

.n z _ I r '. .' ' " ' " "' ' ' ' ' " ' " ' r' ' -

' "'
' f' ' "": I"': .

=.. . . . =.- . L ' ' "r.,.....

. - ' " ", ' - " - ' ' " ' ' ' " = ' - - ' ' ,

The shutdown requirements of Specification 3.0.3 do not apply in CONDITIONS 4 and 5, because the ACTION reoutrements of individual specifications define the remedial measures to be taken.

Specification 3.0.4 establishes limitations on a change in OPERATIONAL

CJNDITIONS when a Limiting Condition for Operation is not met. It precludes placing the' facility in a higher CONDITION of operation when the requirements for a Limiting Condition for Operation are not met and continued noncompliance to these conditions would result in a shutdown to comply with the ACTION requirements if a change in CONDITIONS were permitted. The purpose of this specification is to ensure that facility operation is not initiated or that-

. higher CONDITIONS of operation are not entered when corrective action is being taken to obtain compliance with a specification by restoring equipment to OPERABLE status or parameters to specified limits. Compliance with ACTION requirements that permit continued operation of the facility for an unlimited period of time provides an acceptable level of safety for continued operation without regard to the status of the plant before or after a change in -

OPEP.ATIONAL CONDITIONS. Therefore, in this case, entry into an OPERATIONAL CONDITION or other specified condition may be made in accordance with the provisions of the ACTION requirements. The provisions of this specification should not, however, be interpreted as endorsing the failure to exercise good practice in restoring systems or components to OPERABLE status before plant

(

startup.