Summary of 931109 Meeting W/Pnl in Richland,Wa to Discuss Activities Associated W/Preparation of Standard Review Plan for License Renewal.List of Attendees Encl
ML20058N576
Person / Time
Issue date: 12/13/1993
From: Parkhill R
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
CON-FIN-L-1540 NUDOCS 9312220134
Download: ML20058N576 (4)


Text

i i /p A MCg%,

[ ' -[>$

UNITED STATES i

V NUCLEAR REGULATORY COMMISSION

,/

t WASHINGTON, D.C. 20555-0001 December 13, 1993 ORGANIZATION:

Pacific Northwest Laboratory (PNL)-Battelle i

SUBJECT:

MEETING BETWEEN PNL AND PROJECT DIRECTORATE FOR LICENSE RENEWAL (PDLR) STAFF REGARDING L-1540 s

On November 9,1993, Ron Parkhill and Harold Polk, PDLR staff members, met with PNL, et al., in their Richland, Washington, offices. The purpose of the meeting was to discuss the activities associated with the preparation of the standard review plan for license renewal (SRP-LR) as described under JCN L1540, Objective 1, Phase 5.

The main focus of the meeting was a discussion on how to streamline the process being used by the three national laboratories (i.e., PNL, BNL, and ANL) involved in capturing the technical agreements from the NUMARC Industry Reports. A summary of the maeting highlights follows:

1.

A brief summary of the current license renewal activities was provided by the NRC.

2.

It was decided that ANL will use the BNL report as the basis for their input instead of having BNL and ANL provide independent reports to PNL.

i ANL will clearly identify areas of disagreement, and also additions, to the BNL report when providing PNL with their final product.

It is not recommended that ANL coordinate their changes with BNL; however, ANL is encouraged to contact BNL only when additional clarification is warranted for their unaerstanding of BNL's position on a specific technical issue. ANL will provide PNL with a single report which identifies the technical agreements in the industry reports, rather than have PNL receive two totally independent reviews that could be cumbersome to incorporate into the SRP-LR.

l 3.

More communication is needed between the various laboratories. At present, the NRC is acting as a coordinator of the information provided by PNL and the other laboratories. However, PNL is the primary contractor responsible for the SRP-LR and is also responsible for the utilization of the information provided by ANL and BNL. As such, PNL needs to contact ANL or BNL directly to resolve any concerns they may have regarding the information provided to them. ANL's and BNL's actions should be limited to providing the basis of their previously stated positions or a justification why items were omitted. This contact should be documented, with copies of such communication sent in parallel to the NRC technical monitor, along with any additional information provided from ANL or BNL. Ultimately, the draft SRP-LR should be a document whose captured technical agreements have the combined technical support of PNL, ANL, and BNL.

If agreement cannot be reached between the laboratories, then PNL needs to get the NRC directly t

involved at that time.

l'!L'bf(Chbygua)

Jg g y

(<

y c /h a > eawa W"" J 1700D

{C3 9312220134 931213 E7 "

PDR TOPRP EXIBMNL

'MO C

pon t\\

(

s 4.

At the time of this meeting, BNL had provided four inputs and ANL had provided one input summarizing the technical agreements from the NUMARC industry reports. The following NRC staff comments need to be addressed for these inputs, as well as the inputs on the remaining five NUMARC industry reports:

a.

Clearly identify the items where agreements-in-principle (AIP) exist and where they do not.

BNL only identifies where AIP do not exist and ANL does not identify either.

b.

In the acceptance criteria section, it is not apparent when these criteria are just embracing the current regulations or exceeding them.

For example, the input on IGSCC is quite lengthy but much of it could be pre-empted by referencing R.G. 1.44 or NUREG-0313 as was done in the current standard review plan - NUREG-0800.

It is imperative that the final SRP-LR identify when it goes beyond the current regulations and when it relies on them.

I 5.

The preliminary schedule to which the laboratories should be working is as follows:

BNL - Concurrently submit all of the nine industry report inputs to PNL and ANL, no later than the end of December 1993.

This includes i

incorporation of the recommended changes as discussed above in all nine inputs.

ANL - Submit all of the nine industry report inputs to PNL no later than

}

two months'after they have been received from BNL.

This includes i

incorporation of the recommended changes as discussed above in all nine inputs PNL - Submit the second draft SRP-LR to the NRC technical monitor by May 1, 1994 (i.e., two months after the last ANL input is received).

6.

PNL was requested to incorporate the time-dependent portions of NUREG-0800 into the SRP-LR. A copy of those identified sections was provided to PNL.

7.

The NRC reviewed the PNL charges to the JCN L1540 for the months of i

8/93, 9/93, and 10/93, and found the personnel acceptable and the amount charged to be consistent with the previously submitted monthly reports.

/s/

i Ronald W. Parkhill, Sr. Mechanical Engineer Technical Section License Renewal and Environmental Review i

Project Directorate i

Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

Enclosure:

List of Attendees DIST'!!DUTION:

E4 s r n t oac a _.

di?L PDLR:SMEff/'

PDLRjE PD

~V PDLR:LAwork CNo RParkhill PTKuo S t erry 12/ /93 12/8/93 12/j3/93

}f93 1

DOC ENT NAME: PARKHILL MEETING

SUMMARY

g

i December 13, 1993 Meeting Sumary of November 9,1993, dated I

~

DISTRIBUTIOJ1:

! Central File ?

PDLR R/F PDR

'DCrutchfield, 11H21 5Newberry, 11F23 i

PKuo, llF23 RParkhill, llF23 i

DJackson, 11F23 HPolk,11F23 t

CNorsworthy, llF23 0Chopra, /

KBandyopaanyay, BNL JChristenson, PNL LDefferding, PNL i

i k

l i

f i

T l

]

i

)

l wr-

t

..- 14 ENCLOSURE NOVEMBER 9, 1993 LIST OF ATTENDEES MEETING BETWEEN PNL AND PDLR STAFF RECORDING L-1540.

Attendees:

Oraanization:

i R. Parkhill NRC/PDLR H. Polk NRC/PDLR D. Jackson NRC/PDLR (part-time via telecon)

J. Christenson PNL L. Defferding PNL I

M. Lintz PNL R. Allen PNL W. Morgan PNL l

S. Bush PNL (sub-contractor to BNL)

R. Gruel PNL S. Heaberlin PNL K. Bandyopadhyay BNL

0. Chopra ANL (part-time via telecon) l 9

4 I

~

4 i

l t

f

-., - -