f NUCLEAR REGULATORY COMMISSION C.9j WASHINGTON, D.C. 20555-0001 December 15, 1993 Docket No. 50-206 LICENSEE: Southern California Edison Company FACILITY: San Onofre Nuclear Generating Station, Unit 1
SUBJECT:
SUMMARY
OF MEETING HELD ON NOVEMBER 19, 1993, TO DISCUSS THE PROPOSED DECOMMISSIONING PLAN FOR SAN ONOFRE UNIT 1 On November 19, 1993, NRC staff members met at Rockville, Maryland, with employees of Southern California Edison (SCE) to discuss the proposed decommissioning plan for the San Onofre Nuclear Generating Station, Unit 1 (SONGS 1). A list of attendees is included as Enclosure 1.
The handout used by SCE at the meeting is included as Enclosure 2.
SONGS 1 was permanently shut down on November 30, 1992, and its Possession Only License became effective on March 9, 1993. The reactor is defueled and all fuel has been transferred to the spent fuel pool. Activities associated with transition preparation for entering the SAFSTOR decommissioning phase are expected to be completed by April 1, 1994. The required submittal date for the proposed decommissioning plan is November 30, 1994, two years from the time of final shutdown.
The proposed decommissioning plan anticipates that SONGS 1 will be maintained in SAFSTOR until 2013, when it will be dismantled concurrently with the collocated San Onofre Nuclear Generating Station, Units 2 and 3.
The estimated cost to maintain SONGS 1 in SAFSTOR, approximately $6.5 million per year (this value may be reduced to approximately $1.5 million following removal of the fuel from the spent fuel pool), will be paid from Operations and Maintenance funds until 2004. The decommissioning trust fund will then be used to finance SAFSTOR, preparations for dismantlement, and dismantlement.
The total estimated cost of decommissioning SONGS 1 is $271 million ($26 million for SAFSTOR and preparations for dismantlement, and $245 million for dismantlement) in 1993 dollars, which includes a 40 percent contingency; approximately 15 percent of the cost reflects returning the site to " green field." As of August 1993, SCE and San Diego Gas & Electric have collected approximately $224 million towards the decommissioning of SONGS 1.
200007 9312220066 931215 ADDCK0500g6 j)
I PDR R E R E CENTER C W Y L
[
~
San Onofre
- Meeting Summary
~
The licensee indicated its understanding that the proposed decommissioning plan will be the vehicle for determining the fund collection period as specified in 10 CFR 50.82(a). The licensee also noted that the November 1994 submittal would contain a preliminary site characterization, but that detailed site characterization would be presented in a later submittal closer to the anticipated dismantlement date. The licensee requested information regarding whether the NRC intends to implement Draft Reg. Guide 1006, " Decommissioning Recordkeeping," for prematurely shutdown plants.
1;:ald XW A-Michael K. Webb, Acting Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Operating Reactor Support Office of Nuclear Reactor Regulation
Enclosures:
As stated 1
cc/w enclosures:
See next page r
y i
1
-j; 9
ENCLOSURE 1 l
San Onofre Nuclear Generating Station, Unit 1 i
Proposed Decommissioning Plan Meeting November. 19, 1993 Attendees NAME ORGANIZATION l
Tony Llorens_
SCE Scott Medling SCE Jose Perez-SCE Stewart Brown NRC/NRR Richard Correia NRC/NRR Richard Dudley NRC/NRR Bob Gramm NRC/NRR Charles Petrone NRC/NRR Michael Webb NRC/NRR i
Bob Borsum B&W Nuclear Technologies Valerie Hubbard Winston & Straun f
a i
f f
1 I
i
SAN ONOFRE NUCLEAR GENERATING STATION UNIT 1 PROPOSED DECOMMISSIONING PLAN NOVEMBER 19,1993 1w Ii o
m
~
~......
- ~.. _,.,..,.. -
PURPOSE e
LAST MEETING WAS MARCH 24,1993 e
KEEP NRR/NMSS INFORMED Shutdown Activities Progress on Decommissioning Plan Plan Contents e
MAINTAIN COMMUNICATION LINK
e 4
a f
AGENDA l
~!
t PLANT STATUS f
STATUS OF PROPOSED DECOMMISSIONING PLAN PROPOSED DECOMMISSIONING PLAN ASSUMPTIONS PROPOSED DECOMMISSIONING PLAN CONTENTS NRC DECOMMISSIONING ORDER
PLANT STATUS e
FINAL SHUTDOWN ON NOVEMBER 30,1992 e
DEFUELED MARCH 6,1993 e
POL WENT INTO EFFECT MARCH 9,1993
-e TRANSITION ACTIVITIES WILL BE COMPLETED BY APRIL 1,1994
STATUS OF PROPOSED DECOMMISSIONING PLAN e
DECOMMISSIONING TASK FORCE TEAM ESTABLISHED DECEMBER 1992 e
TEAM COMPOSED OF REPRESENTATIVES FROM:
Operations Maintenance Engineering / Construction Health Physics / Environmental Project Management Licensing e
REQUIRED SUBMITTAL DATE IS NOVEMBER 1994 e
DRAFTS OF SEVP.RAL SECTIONS HAVE BEEN PREPARED
PROPOSED DECOMMISSIONING PLAN ASSUMPTIONS O
PLANT WILL BE MAINTAINED IN SAFSTOR UNTIL 2013 9
DECOMMISSIONING TRUST FUND WILL NOT BE UTILIZED UNTIL 2004 e
UTILIZED FORMAT OF DRAFT REG GUIDE 1005 9
DECOMMISSIONING PLAN IS FOCUSED ON THE TRANSITION AND SAFSTOR PERIODS e
LEVEL OF DETAIL Transition - Actual SAFSTOR - Detailed Dismantling - Summary e
EXISTING PROCEDURES ARE UTILIZED TO THE EXTENT POSSIBLE e
UPDATE TO PLAN WILL BE SUBMITl'ED NEAR THE END OF SAFSTOR PERIOD e
SITE CHARACTERIZATION WILL BE PERFORMED FOR AND i
PROVIDED IN UPDATED PLAN i
e
' MAINTAIN ONLY EQUIPMENT NECESSARY FOR SFP COOLING
. - ~ -
_. _ _ _ _ ~,.... _ _.. _
e PROPOSED DECOMMISSIONING PLAN CONTENTS 1.0 OVERVIEW 2.0 CHOICE OF DECOMMISSIONING ALTERNATIVES l
3.0 PROTECTION OF OCCUPATIONAL AND PUBLIC HEALTH AND SAFETY 4.0 PROPOSED FINAL RADIATION SURVEY 5.0 DECOMMISSIONING COST ESTIMATE 6.0 TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS 7.0 QUALITY ASSURANCE PROVISIONS 8.0 PHYSICAL SECURITY PLAN
i
- 1 i
1.0 -OVERVIEW y
e BACKGROUND q
e FACILITY DESCRIPTION 1
e
SUMMARY
OF THE PLAN e
DECOMMISSIONING PLAN REVISION PROCESS-
- l
(
.,_..2._
2.0 CHOICE OF DECOMMISSIONING ALTERNATIVES l
j i
e SAFSTOR ALTERNATIVE I
I e
ACTIVITIES, TASKS AND SCHEDULES:
4 i
Shutdown and Transition SAFSTOR Decontamination and Dismantling Radiation Exposure e
DECOMMISSIONING ORGANIZATION e
TRAINING PROGRAM e.
CONTRACTOR ASSISTANCE mu
_,_.._m____
w mm2-mm_,%
. +
__.-,_m m
mi..%_,
m,,,
c
,.w..,,,,
e
-6
,.m.
e w.
I 3.0 PROTECTION OF OCCUPATIONAL AND PUBLIC HEALTH AND SAFETY O
RADIOLOGICAL STATUS Document Review Scoping Studies Radionuclide Inventory e
RADIATION PROTECTION e
RADIOACTIVE WASTE MANAGEMENT e
ACCIDENT ANALYSIS e
OCCUPATIONAL SAFETY e
NON-RADIOACTIVE WASTE MANAGEMENT
e.
s 4.
4.0 PROPOSED FINAL RADIATION SURVEY e
RESIDUAL RADIOACTIVITY LIMITS--
e FINAL SITE SURVEY t
I e
h
?
, k
+
4
.a......
~
s 5.0 DECOMMISSIONING COST ESTIMATE 1
s ESTIM. ATE O
FINANCIAL PLAN o
PROVIDE SUFFICIENT DATA FOR NRC TO ASSESS OUR COLLECTION PER 50.82 e
PRELIMINARY DECOMMISSIONING PLAN -
1990 COST ESTIMATE e
PROPOSED DP - 1993 ESTIMATE I
T m
z
-. - -- ~
~v.w.--..
..m r,
-.v--------,---
us.
e 4-w,--
,e.*
r,.-.
v-
-e n r k-
F g
'e
. '. 4 :
6.0 TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS 7.0 QUALITY ASSURANCE k
8.0 PHYSICAL SECURITY 4
m
)
I I
NRC DECOMMISSIONING ORDER e
ASSUMING THAT APPROVAL OF DECOMMISSIONING PLAN WILL BE VIA DECOMMISSIONING ORDER e
DECOMMISSIONING ORDER WILL APPROVE OUR FUNDING ACCUMULATION AND COLLECTION PERIOD
-,..u a,,
g
\\~
-7 Mr. Harold B. Ray San Onofre Nuclear Generating Southern California Edison Company Station, Unit 1 Docket No. 50-206 CC*
Mr. R. W. Krieger, Vice President Southern California Edison Company
-San Onofre Nuclear Generating Station P. O. Box 128 San Clemente, California 92674-0128 Mr. Robert G. Lacy Manager, Nuclear Department San Diego Gas & Electric Company P. O. Box 1831 San Diego, California 92112 Resident Inspector / San Onofre NPS c/o U.S. Nuclear Regulatory Commission P. O. Box 4329 San Clemente, California 92674 Mayor City of San Clemente 100 Avenida Presidio San Clenente, California 92672 Chairman, Board of Supervisors County of San Diego
- 1600 Pacific Highway, Room 335 San Diego, California 92101 Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. Steve Shu Radiologic Health Branch State Department of Health Services P. O. Box 942732 Sacramento, California 94234 Mr. Don J. Womeldorf Chief, Environmental Management Branch California Department of Health Services 714 P. Street, Room 616 Sacramento, California 95814 Mr. Richard J. Kosiba, Project Manager Bechtel Power Corporation 12440 E. Imperial Highway Norwalk, California 90650
December 15, 1993 tn W
s The licensee indicated its understanding that the proposed decommissioning plan will be the vehicle for determining the fund collection period as specified in 10 CFR 50.82(a). The licensee also noted that.the November 1994 submittal would contain a preliminary site characterization, but that detailed site characterization would be presented in a later submittal closer to the anticipated dismantlement date. The licensee requested information regarding whether the NRC intends to implement Draft Reg. Guide 1006,." Decommissioning Recordkeeping," fcr prematurely shutdown plants.
1 Original signed by:
Michael K. Webb, Acting Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Operating Reactor Support Office of Nuclear Reactor Regulation
Enclosures:
As stated cc/w enclosures:
See next page DISTRIBUTION:
[SCEMEET.113] (Webb-lb)
Docket File 50-206 TMurley/FMiraglia RDudley ACRS (10)
PDRs LCallan EHylton JMitchell, RV ONDD R/F BGrimes OGC KPerkins DORS R/F SWeiss EJordan MWebb OND:lI/
ONDD:(A PM ONDD:SC p t[
0 4
Elly.tpn MWebb:S
'RDudley SWeis; i
12/g/93 12/I?/93 12//S/93 12//5 /93
..