Text
1 l
OPERATING DATA REPORT - REVISED 1
UNIT NAME Millstone Unit 1 DATE 931209 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 i
EXT 5730
]
OPERATING STATUS i
1.
Docket Number 50-245 2.
Reporting Period October 1993 Notes:
j 3.
Utility Contact G. Newburgh
- Revisions 4.
Licensed Thermal Power (MWt):
2011 5.
Nameplate Rating (Gross MWe):
662 6.
Design Electrical Rating (Net MWe):
660 j
7.
Maximum Dependable Capacity (Gross MWe):
'670 8.
Maximum Dependable Capacity (Net MWe):
- 641 9.
If Changes Occur in Capacity Ratings titems Number 4 Through 8) Since Last Report, Give Reasons:
- Derated due to continued operation of 'A' low pressure turbine without 13th stage installed.
- 10. Power Level To Which Restricted, if any (Net MWe):
N/A
)
- 11. Reasons For Restrictions, if Any:
N/A 1
This Month Yr.-To-Date Cumulative
- 12. Hours in Reporting Period 745.0 7296 200952A 563.7 7017.2 156486.6
- 13. Number Of Hours Reactor Was Critical
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3 l
- 15. Hours Generator On-Line
- 536.5
- 6975.2
- 152751.0 l
- 16. Unit Reserve Shutdown Hours 0.0 0.0 93.7
- 17. Gross Thermal Energy Generated (MWH) 1052080.0 13810054.0 287676927.0
- 18. Gross Electrical Energy Generated (MWH) 347807.0 4567741.0 96978740.0
- 19. Net Electrical Energy Generated (MWH) 330943.0 4367075.0 92519985.0
- 20. Unit Service Factor
- 72.0 95.6 75.0
- 21. Unit Availability Factor
- 72.0 95.6 76.1
- 22. Unit Capacity Factor (Using MDC Net)
- 63.3
- 93.4
'70.5
- 23. Unit Capacity Factor (Using DER Net) 67.3 90.7 69.8 l
- 24. Unit Forced Outage Rate
- 28.0 4.4
- 12.2 l
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duratlon of Each):
Refueling Outage, January 1994,71 day duration
- 26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:
N/A
- 27. Units in Test Status (Prior to Commercial Operation):
Forecast Acheived l
INITIAL CRITICALITY N/A N/A l
INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l
- Unit shutdown No. 93-11, date: 931016, revised duration - 79.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />.
i i
I i
j e
'g, R
1 Revisions to Millstone Unit 1 Capacity Factor (using MDC Net) i M nthly Year To Date Cumulative-Report Period o
December 1992 94.3 64.1 l
January 1993 98.7 98.7 l
February 1993 98.6 98.6 March 1993 99.1 98.8 i
April 1993 85.7 95.5 May 1993 94.7 95.4 70.1 l
June 1993 96.4 95.5 70.2 July 1993-97.0 95.7 70.3 August 1993 97.5 96.0 70.4 September 1993 97.3 96.1-70.5 Revisions resulted from derating Unit due to continued operation of
'A' low pressure turbine without 13th' stage installed.
October, 1993 changes and revisions included on previous page.
- Indicates no change to original report.
j l
'I i
l