l OPERATING DATA REPORT UNIT NAME-Millstone Unit 1 DATE 931209 COMPLETED BY G. Newburgh -
TELEPHONE (203) 447-1791 i
EXT 5730 i
OPERATING STATUS 1.
Docket Number 50-245 2.
Reporting Period November 1993 Notes:
.j 1
i 3.
Utility Contact G. Newburgh 4.
Licensed Thermal Power (MWt):
2011 5.
Nameplate Rating (Gross MWe):
662 6.
Design Electrical Rating (Net MWe):
660 7.
Maximum Dependable Capacity (Gross MWe):
670 8.
Maximum Dependable Capacity (Net MWe):
641 1
9.
If Changes Occur in Capacity Ratings (Items N' f er 4 Through 8) Since Last Report, Give Reasons:
~
N/A l
- 10. Power Level To Which Restricted, if any (Net MWe):
N/A l
- 11. Reasons For Restrictions, if Any:
N/A This Month Yr.-To-Date Cumulative l
- 12. Hours in Reporting Period 720.0 8016 201672.0 13 Number Of Hours Reactor Was Critical 720.0 7737.2 157206.6-
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3
- 15. Hours Generator On-Line 720.0 ~
7695.2 153471.0
- 16. Unit Reserve Shutdown Hours 0.0 0.0 93.7
- 17. Gross Thermal Energy Generated (MWH) 1436986.0 15247040.0 289113913.0
- 18. Gross Electrical Energy Generated (MWH) 475424.0 5043165.0 97454164.0
- 19. Net Electrical Energy Generated (MWH) 454861.0 4821936.0 92974847.0-
- 20. Unit Service Factor 100.0 96.0 76.1
- 21. Unit Availability Factor 100.0 96.0 76.1-
- 22. Unit Capacity Factor (Using MDC Net) 98.6 93.8 70.6
- 23. Unit Capacity Factor (Using DER Net) 95.7 91.1 69.9
- 24. Unit Forced Outage Rate 0.0 4.0 12.1
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling Outage, January 1994,71 day duration l
- 26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:
N/A
- 27. Units in Test Status (Prior to Commercial Operation):
Forecast Achelved INITIAL CRITICALITY N/A N/A l
INITIAL ELECTRICITY N/A-N/A COMMERCIAL OPERATION
'N/A N/A l
j r;
9312210256 931214 h
PDR ADOCK 05000245 g
p PDR a
^
AVERAGE DAILY UNIT POWER LEVEL -
-i DOCKET NO.- 50-245 UNIT Millstone Unit 1 DATE 931206 COMPLETED BY G. Newburgh-TELEPHONE -(203) 447-1791 EXT 5730 MONTH:
NOVEMBER 1993 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL l
(MWe-Net)
(MWe-Net) 1 636 17 628 f
2 637 18 637 3
566 19 637 4
635 20 63b' 5
-633 21 636 6
634 22-635 j.
7 635 23-636 8
'635 24 627 9
634 25 G38 i
10 613 26-638 l
11 637 27 638 12 636 28 623 13 636 29 638 l
14 635 30 638 l
15 634 31 N/A l
16 634 l
l INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each l
day in the reporting month. Compute to the nearest whole megawatt.
l i
t Yr4 9-
-T
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245 UNIT NAME Millstone Unit 1 DATE 931206
' ~
COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 REPORT MONTH November 1993 EXT 5730 No.
Date Type 1 Duration Reason 2 Method of License System Component Cause & Corrective (Hours)
Shutting Event Code 4 Code 5 Action to Down Reactor 3
Report #
Prevent Recurrence N/A 1 F: Forced 2 Reason 3 Method 4 IEEE Standard 805-1984, S: Scheduled A -Equipment Failure (Explain) 1 -Manual
" Recommended Practices B -Maintenance or Test 2 -Manual Scram for System Identification in C -Refueling 3 -Automatic Scram Nuclear Power Plants and D -Regulatory Restriction 4 -Continued from Related Facilities"
.E -Operator Training & License Examination Previous Month F -Administrative 5 -Power Reduction 5 IEEE Standard 803A-1983, G -Operational Error (Explain)
(Duration - 0)
" Recommended Practices H -Other (Explain) 6 -Other (Explain) for Unique Identification in Power Plants and Related Facilities - Component Function Identifiers"
t
)
REFUELING INFORMATION REQUEST i
1.
Name of facility: Millstone 1 2.
Scheduled date for next refueling shutdown:
January 1994' j
3.
Scheduled date for restart following refueling:
March 1994 l
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?'
None at this time 5.
Scheduled date(s) for submitting licensing action and supporting information:
None at this time 6.
Important licensing considerations associated with refueling, e.g., new or different _-
fuel design or supplier, unreviewed design or performance analysis methods, i
significant changes in fuel design, new operating procedures:
i 188 GE10 Fuel Assemblies i
t 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
in Core: (a) 580 in Spent Fuel Pool: (b) 2116 Unconsolidated l
1 l
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned,in number of fuel assemblies:
Present Capacitv: Maximum 3229 fuel assembiv locations 1
9.
The projected date of the last refueling that can be discharged to the spent fuel pool' l
assuming the present licensed capacity:
1997 Soent Fuel Pool Full, Core Off Load capacity is reached.
l l