l OPERATING DATA REPORT UNIT NAME-Millstone Unit 1 DATE 931209 COMPLETED BY G. Newburgh -

TELEPHONE (203) 447-1791 i

EXT 5730 i

OPERATING STATUS 1.

Docket Number 50-245 2.

Reporting Period November 1993 Notes:

.j 1

i 3.

Utility Contact G. Newburgh 4.

Licensed Thermal Power (MWt):

2011 5.

Nameplate Rating (Gross MWe):

662 6.

Design Electrical Rating (Net MWe):

660 7.

Maximum Dependable Capacity (Gross MWe):

670 8.

Maximum Dependable Capacity (Net MWe):

641 1

9.

If Changes Occur in Capacity Ratings (Items N' f er 4 Through 8) Since Last Report, Give Reasons:

~

N/A l

10. Power Level To Which Restricted, if any (Net MWe):

N/A l

11. Reasons For Restrictions, if Any:

N/A This Month Yr.-To-Date Cumulative l

12. Hours in Reporting Period 720.0 8016 201672.0 13 Number Of Hours Reactor Was Critical 720.0 7737.2 157206.6-
14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3
15. Hours Generator On-Line 720.0 ~

7695.2 153471.0

16. Unit Reserve Shutdown Hours 0.0 0.0 93.7
17. Gross Thermal Energy Generated (MWH) 1436986.0 15247040.0 289113913.0
18. Gross Electrical Energy Generated (MWH) 475424.0 5043165.0 97454164.0
19. Net Electrical Energy Generated (MWH) 454861.0 4821936.0 92974847.0-
20. Unit Service Factor 100.0 96.0 76.1
21. Unit Availability Factor 100.0 96.0 76.1-
22. Unit Capacity Factor (Using MDC Net) 98.6 93.8 70.6
23. Unit Capacity Factor (Using DER Net) 95.7 91.1 69.9
24. Unit Forced Outage Rate 0.0 4.0 12.1
25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage, January 1994,71 day duration l

26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:

N/A

27. Units in Test Status (Prior to Commercial Operation):

Forecast Achelved INITIAL CRITICALITY N/A N/A l

INITIAL ELECTRICITY N/A-N/A COMMERCIAL OPERATION

'N/A N/A l

j r;

9312210256 931214 h

PDR ADOCK 05000245 g

p PDR a

^

AVERAGE DAILY UNIT POWER LEVEL -

-i DOCKET NO.- 50-245 UNIT Millstone Unit 1 DATE 931206 COMPLETED BY G. Newburgh-TELEPHONE -(203) 447-1791 EXT 5730 MONTH:

NOVEMBER 1993 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL l

(MWe-Net)

(MWe-Net) 1 636 17 628 f

2 637 18 637 3

566 19 637 4

635 20 63b' 5

-633 21 636 6

634 22-635 j.

7 635 23-636 8

'635 24 627 9

634 25 G38 i

10 613 26-638 l

11 637 27 638 12 636 28 623 13 636 29 638 l

14 635 30 638 l

15 634 31 N/A l

16 634 l

l INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each l

day in the reporting month. Compute to the nearest whole megawatt.

l i

t Yr4 9-

-T

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245 UNIT NAME Millstone Unit 1 DATE 931206

' ~

COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 REPORT MONTH November 1993 EXT 5730 No.

Date Type 1 Duration Reason 2 Method of License System Component Cause & Corrective (Hours)

Shutting Event Code 4 Code 5 Action to Down Reactor 3

Report #

Prevent Recurrence N/A 1 F: Forced 2 Reason 3 Method 4 IEEE Standard 805-1984, S: Scheduled A -Equipment Failure (Explain) 1 -Manual

" Recommended Practices B -Maintenance or Test 2 -Manual Scram for System Identification in C -Refueling 3 -Automatic Scram Nuclear Power Plants and D -Regulatory Restriction 4 -Continued from Related Facilities"

.E -Operator Training & License Examination Previous Month F -Administrative 5 -Power Reduction 5 IEEE Standard 803A-1983, G -Operational Error (Explain)

(Duration - 0)

" Recommended Practices H -Other (Explain) 6 -Other (Explain) for Unique Identification in Power Plants and Related Facilities - Component Function Identifiers"

t

)

REFUELING INFORMATION REQUEST i

1.

Name of facility: Millstone 1 2.

Scheduled date for next refueling shutdown:

January 1994' j

3.

Scheduled date for restart following refueling:

March 1994 l

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?'

None at this time 5.

Scheduled date(s) for submitting licensing action and supporting information:

None at this time 6.

Important licensing considerations associated with refueling, e.g., new or different _-

fuel design or supplier, unreviewed design or performance analysis methods, i

significant changes in fuel design, new operating procedures:

i 188 GE10 Fuel Assemblies i

t 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

in Core: (a) 580 in Spent Fuel Pool: (b) 2116 Unconsolidated l

1 l

8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned,in number of fuel assemblies:

Present Capacitv: Maximum 3229 fuel assembiv locations 1

9.

The projected date of the last refueling that can be discharged to the spent fuel pool' l

assuming the present licensed capacity:

1997 Soent Fuel Pool Full, Core Off Load capacity is reached.

l l