ML20058M229
| ML20058M229 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 12/09/1993 |
| From: | Joyner J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20058M233 | List: |
| References | |
| NUDOCS 9312200204 | |
| Download: ML20058M229 (3) | |
Text
!
DEC 09 1%)
-i Docket Nos. 50-277 50-278 Mr. D. M. Smith Senior Vice President-Nuclear Philadelphia Electric Company Nuclear Group Headquarters Correspondence Control Desk P. O. Box 195 i
Wayne, Pennsylvania 19087-0195
Dear Mr. Smith:
SUBJECT:
Pennsylvania LLRW Shipment Inspection Report Nos. 50-277/PA-93-02/NRC-93-36 and 50-278/PA-93-02/NRC-93-36 Enclosed is the subject inspection report that was received from the Commonwealth of Pennsylvania by the NRC Region I office on October 25,1993. The report documents an inspection of your activities related to the shipment of low-level radioactive waste (LLRW),
i as conducted by the PA Department of Environmental Resources under the provisions of the Memorandum of Understanding between the Commonwealth of Pennsylvania and the NRC.
We note that no violations or deviations were identified and no response to this letter is required. If you have any questions concerning the enclosure, please contact Mr. Lonny Eckert of my staff. Your cooperation with us is appreciated.
Sincerely, OriginalSigned By James H.Joyner James H. Joyner, Chief Facilities Radiological Safety and Safeguards Branch 1
Division of Radiation Safety and l
Safeguards
Enclosure:
As Stated r ce na 160039 hl-
[ i *1 r, p~
1 omonaecono co"
^
pg22gggggg,r f
Philadelphia Electric Company 2
DEC 0 g 1993
-I cc w/ encl:
J. Doering, Chairman, Nuclear Review Board G. Rainey, Vice Pn:sident, Peach Bottom Atomic Power Station G. Cranston, General Manager, Nuclear Engineering Division 1
C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
l G. Edwards, Plant Manager, Peach Bottom Atomic Power Station
- A. J. Wasong, Manager, Experience Assessment G. A. Hunger, Jr., Manager, Licensing Section J. W. Durham, Sr., Senior Vice President and General Counsel J. A. Isabella, Director, Generation Projects Department, Atlantic Electric i
B. W. Gonnan, Manager, External Affairs R. McLean, Power Plant Siting, Nuclear Evaluations D. Poulsen, Secretary of Harford County Council R. Ochs, Maryland Safe Energy Coalition J. H. Walter, Chief Engineer, Public Service Commission of Maryland 3
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector
_i Commonwealth of Pennsylvania TMI - Alert (TMIA) t OFFICIAL RECORD COPY
1 1
-l Philadelphia Electric Company 3
DEC 0 9 1993 bec w/ encl:
i i
Region I Docket Room (with concurrences) bec w/ encl: (Via E-Mail) i W. Dean, OEDO Joseph Shea, NRR L. Nicholson, Acting PDI-2, NRR
(!
t k
I i
i f
3 i
i f
CONCURRENCES:
l UE FL"
. f{
i Ecken Bores Joyner RI:FRPS RI:FRPS RI:FRSSB 12/9/93 12/9 /93 12/f/93 i
OFFICIAL RECORD COPY i