Special Rept 93-01:on 931105,seismic Monitoring Instrumentation Was Removed from Svc to Perform TS Required 18 Month Channel Calibr of Sys & Remained Inoperable for More than 30 Days.Caused by Need for New Test Card
ML20058M120
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 12/09/1993
From: Hovey R
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
93-01, 93-1, NUDOCS 9312200160
Download: ML20058M120 (1)


Text

I O PSEG Ptibhc Service Elecinc and Gas Company P O Box 236 Hancocks Bridge. New Jersey 08038 Hope Creek Generating Station i

December 9, 1993 i 3

U.S. Nuclear Regulatory Commission l Document Control Desk  !

Washington, DC 20555 j

Dear Sir:

f Hope Creek Generating Station Docket No. 50-354 Unit No. 1 Special Report 93-01 This Special Report is being submitted pursuant to the '

requirements of Hope Creek Technical Specification 3.3.7.2 - ,

action a, due to the Seismic Monitoring Instrumentation being inoperable for more than 30 days.

  • On 11/05/93, the Seismic Monitoring Instrumentation was
  • removed from service to perform a Tech Spec required 18 month channel calibration of the system. During the final portion of the surveillance, it was determined that a new test card was needed to complete the testing. The card has been ordered and expected to arrive in mid December when testing  ;

will be resumed with an expected completion date of 12/31/93. l Although the system cannot be declared operable, the system  ;

will be functional until test completion.

i Sincerely,  !

__ t R.J. Homey l General Manager -

Hope Creek Operations LLA/

C Distribution i i

_!8001o .w 9312200160 931209 PDR ADOCK0500g4

[