Monthly Operating Repts for Nov 1993 for Jm Farley Nuclear Plant
ML20058L794
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/30/1993
From: Hill R, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9312200013
Download: ML20058L794 (9)


Text

,

l

-- Southern Nucitar Operating Company.

Post Omca Box 1295 -

8rmingham Alabama 35201 Telephone (205) 668-5131 Southem Nudear Operating Company e..e uor.y Vice President Farley P.oject

. The southem electoc system -

Deconber 13, 1993 I

h Docket Nos. 50-348 50-364 i

U. S. Nuclear Regulatory Commission ATTN: Document ControlDesk t

Washington, D.C. 20555 ~

I Joseph M. Farley Nuclear Plant Monthly Operating Data Report s

i Gentlemen:

+

Attached are the November 1993 Monthly Operating Reports for Joseph M. Farley Nuclear S

Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

Ifyou have any questions, please advise.

. Respectfully submitted,-

66 '>nt+f Dave Morey RWC:jgp(mor)

Attachments cc:

Mr. S. D. Ebneter Mr. T. A Reed Mr. T. M. Ross f'

9312200013 931130 57 gDR ADOCK 05000348 I/r PDR

OPERATING DATA REPORT:

DOCKET NO.

50-348 DATE December 6,1993 -

COMPLETED BY R. D. llill TELEPHONE-(205)S99-5156 -

QPERATEG STATUS 1.

Unit Name:

Joseph M. Farley-Unit 1 Notes 2.

Reporting Period:

November 1993 -

1) Cumulative data since 12-01-77, date 3.

Licensed Thermal Power (MWt):

2,652 ofcommercial operation.

4.

Nameplate Rating (Gross MWe):

860 5.

Design Electrical Rating (Net MWe):

829 6.

Maximum Dependable Capacity (Gross MWe):

855.7 7.

Maximum Dependable Capacity (Net MWe):

812 3.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A 9.

Power Level To Which Restricted, If Any (Net MWe) N/A 10.

Reasons For Restrictions,If Any:-

N/A This Month -

Yr.to Date i Cumulative 11.

Ilours in Reporting Period 720.0 8,016.0~

l4R256.0 12.

Number OfIlours Reactor Was Critical 720.0 7,798.6

'110,919.9:

13.

Reactor Reserve Shutdown llours 0.0 0.0 3,650.0 -

14.

Hours Generator On-line 720.0,

7,778.9 109,162.6 0.0 15.

Unit Reserve Shutdown Ilours 0.0 0.0 16.

Gross Thermal Energy Generated (MWII) 1,909,034.3-20,519,100.6 280,520,176.4 17.

Gross Electrical Energy Generated (MWII) 619,240.0 6,606,834.0 90,373,636.0 13.

Net Electrical Energy Generated (k 'II) 588,292.0 6,264.618.0--

85,330,868.0 19.

Unit Service Factor 100.0 97.0-77.8 20.

Unit Availabilty Factor 100.0 97.0-77.8 21.

Unit Capacity Factor (Using MDC Net) 100.6 96.3' 74.7 22.

Unit Capacity Factor (Using DER Net) 98.6 94.3 ~

73.4' 23.

Unit Forced Outage Rate 0.0 3.0 -

' 6.4 -

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Fxh):

Refueling / Maintenance Outage March 4,1994. Approximately 56 days.

25.

If Shut Down at End Of Report Period, Estimated Date of Startup:

N/A 26.

Units In Test Status (Prior To Commer cial Operation):

. Forecast

Achieved Initial Criticality 08/06/77 0&'09111 Initial Electricity 082.091-08/18/77 Commercial Operation 12/2191' 12/ DIG 1'

i-1 j

DOCKET NO.

50-348 ~

UNIT :

1 j'

' DATE December 6,- 1993 l

COMPLETED BY-R. D. Hill -

j

[

TELEPHONE - (205) 899-5156-l 4

Y

+

l MONTH ~' NOVEMBER l

DAY AVERAGE DAILY POWER LEVEL DAY - AVERAGE DAILY POWER LEVEL'.

l (MWe-Net).

(MWe-Net)

l

]

1 823'

.17 -

'810-

.2 822

' 18 -

8'18

-1 3

820 19 818-N 4

815 20' -

- I819-I o

5 810~ 819 j

6

-809' 22 819:

t 7

823 23 819 8

822 24 819-i 9

819 25.

'819-10 821 26 817 11 821 27 817-12 818-28,

'819-i 13 813 29

'819 i

l 14 808~

30

'818-1 15 810 -

31-N/A l

5!

16 810-

.j

.i PjSTRUCTIONS On dus format, list the average daily unit power level in MWe-Net for each day in Gm reporting period. Cornpute to em nearest m4ude megawstL 11

Joseph M. Fcrley Nuclerr PI:nt Unit I Narrative Summary of Operations November 1993 l

l There were no unit shutdowns or major power reductions during the month of November.

The following major safety related maintenance was performed during the month:

1.

Performed miscellaneous corrective and preventive maintenance on the diesel l

generators.

l 1

4

/

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKIRNO.

50-348 UNIT NAME J. M. Farley - Unit i DATE December 6,1993 COMPLLTED IlY R. D. Ilill REPORT MONTil NOVEMBER TELEPIIONE (205) 899-5156 MImIOD OF LICENSEE CAUSE AND CORRECI1VE DURATION SIIUTITNG EVENT SYSTEM COMPONENT ACTION TO

- NO.

DATE TYPE (1)

IlOURS REASON (2) DOWN REACTUR Q)

REPORT #

CODE (4)

CODE (5)

PREVENT RrrURRENCE There were no shutdowns or power reductions during the month of November.

1:

2:

3:

4:

5:

F: Forced Reason Method Exhibit G. Instructions for Exhibit I-Same Source S: Scheduled A Equipment Failure (Explain)

.1-Manual Preparations of Date Entry

- D MaintenanceorTest 2 ManualScram Sheets for Licensee Event

. C - Refueling 3 Automatic Scram Report (LER) File (NUREG-0161)

D-Regulatory Restriction.

4 - Other(Explain)

E - O erator Training & license Esami-stica i

F-Administrative G - Operational Error (Fglain)

II-Other(Explain)

OPERATING DATA REPORT DOCKET NO.

50-364 l

DATE-December 6,1993 f

COMPLETED BY R. D. Ilill TELEPHONE (205) 899-5156

}

f I

onuma srrres t

1.

Unit Name:

Joseph M. Farley - Unit 2 Notes 2.

Reporting Period:

November 1993

1) Cumulative data since 07-30-81, date 3.

Licensed Thermal Power (MWt):

2,652 ofcommercial operation.

j 4.

Nameplate Rating (Gross MWe):

860 t

5.

Design Electrical Rating (NetMWe):

829 6

Maxi.num Dependable Capacity (Gross MWe):'

863.6 i

7.

Maxir,4um Dependable Capacity (Net MWe):

822 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons N/A l

9.

Power Irvel To Which Restricted, If Any (Net MWe) N/A 10.

Reasons For Restrictions,IfAny:

N/A l

This Month Yr.to Date Cumulative I

11.

Ilours in Reporting Period 720.0 8,016.0 108,169.0 12.

Number OfIlours Reactor Was Critical 25.2 6,372.3 92,394.2

(

13.

Reactor Reserve Shutdown Ilours 0.0 0.0 138.0 -

14.

11ours Generator On-line 0.0 6,152.0 91,068.7-15.

Unit Reserve Shutdown llours 0.0 0.0 -

. 0.0 16.

Gross Thermal Energy Generated (MWII) 0.0-15,900,208.7 232,431,156.5 -

17.

Gross Electrical Energy Generated (MWH) 22.0 5,180,941.0 76,193,119.0' l8.

Net Electrical Energy Generated (MWII)

' (9,812.0) 4,906,313.0 72,245,511.0 19.

Unit Service Factor 0.0 76.7 84.2 20.

Unit Availabilty Factor 0.0 76.7 84.2 l

21.

Unit Capacity Factor (Using MDC Net)

N/A

'74.5 81.5 22.

Unit Capacity Factor (Using DER Net)

N/A 73.8 80.6 j

23.

Unit Forced Outage Rate 0.0 4.0 4.0 f

24 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

l N/A 25.

If Shut Down at End Of Report Period, Estimated Date ofStartup:

December 2,1993 j

26.

Units in Test Status (Prior To Commercia10peration):

Forecast

. Achieved Initial Criticality 05/06/81 05/08/81 l

Initial Electricity 05/24/81 05/25/81 l

Commercial Operation 0.8/01/81 02/30/81 l

.]

l

.m

I o

DOCKET NO.

50-364 i

UNIT 2

DATE December 6,1993 COMPLETED BY R. D. Hill TELEPIIONE (205) 899-5156 l

MONTH NOVEMBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) i 1

0 17 0

i 2

0 18 0

3 0

19 0

l 4

0 20 0

5 0

21 0

l 6

0 22 0

7 0

22 0

l 8

0 24 0

9 0

25 0

10 0

26 0

11 0

27 0

l 12 0

28 0

13 0

29 0

14 0

30 0

l 15 0

31 N/A 16 0

issmuloss On this format, list the average daily unit power levelin MWe-Net for each day in die reporting period. Compute to the nearest whole merswatt.

-. =.

~

Joseph M. Ftrley Nucle:r Plant Unit 2 Narrative Summary of Operations.

November 1993 l

The cycle 9-10 refueling outage continued through the month of November.

The following major safety related maintenance was performed during the month of j

November:

1.

Performed miscellanecus corrective and preventive maintenance on the diesel j

generators. Completed work on the 2C diesel generator as part of the station.

l black-out modification.

Ll 2.

Performed eddy. current testing, sleeving of tubes, and plugging of tubes in all j

three steam generators.

3.

Completed refueling the reactor and performed the reactor vessel assembly.

4.

Achieved reactor initial criticality at 2251 on Il-29-93.

r i

i

.J 1

i i

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-364 UNIT NAME J. M. Farley - Unit 2 DATE December 6,1993 COMPLETED llY R. D.11i11 REPORT MONTil NOVEMBER TELEPIlONE (205) 899-5156 MEDIOD OF LICENSEE CAUSE AND CORRECTIVE DURADON S11UTITNG EVENT SYSTEM COMPONENT ACllONTO NO.

DATE TYPE (l)

IlOURS REASON (2)

DOWN REACTOR (3)

REPORT #

CODE (4)

CODE (5)

PREVENT RFCURRENCE 005 931001 S

720 C

1 N/A N/A N/A The cycle 9-10 refueling continued fmm 930925.

l i

1:

2:

3:

4:

5:

F: Forced Reason Method Exhibit G Instructions for Exhibit I-Same Source

~ 5: Scheduled A - Equipment Failure (Explain)

I-Manual Preparations of Date Entry -

B. Maintenance or Test 2 - Manual,

sheets for Licensee Event C-Refueling 3 - Automatic.. ram '

Report (LER) File (NUREG-0161) -

D-Regulatory Restriction 4 -Other(Explain)

- E - Operator Training & Ucense Examination -

F-Adm nistrative

+

i

- G-Operational Error (Explain)

II-Other(Explain)

..