ML20058L794
| ML20058L794 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/30/1993 |
| From: | Hill R, Dennis Morey SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9312200013 | |
| Download: ML20058L794 (9) | |
Text
,
l
-- Southern Nucitar Operating Company.
Post Omca Box 1295 -
8rmingham Alabama 35201 Telephone (205) 668-5131 Southem Nudear Operating Company e..e uor.y Vice President Farley P.oject
. The southem electoc system -
Deconber 13, 1993 I
h Docket Nos. 50-348 50-364 i
U. S. Nuclear Regulatory Commission ATTN: Document ControlDesk t
Washington, D.C. 20555 ~
I Joseph M. Farley Nuclear Plant Monthly Operating Data Report s
i Gentlemen:
+
Attached are the November 1993 Monthly Operating Reports for Joseph M. Farley Nuclear S
Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.
Ifyou have any questions, please advise.
. Respectfully submitted,-
66 '>nt+f Dave Morey RWC:jgp(mor)
Attachments cc:
Mr. S. D. Ebneter Mr. T. A Reed Mr. T. M. Ross f'
9312200013 931130 57 gDR ADOCK 05000348 I/r PDR
OPERATING DATA REPORT:
DOCKET NO.
50-348 DATE December 6,1993 -
COMPLETED BY R. D. llill TELEPHONE-(205)S99-5156 -
QPERATEG STATUS 1.
Unit Name:
Joseph M. Farley-Unit 1 Notes 2.
Reporting Period:
November 1993 -
- 1) Cumulative data since 12-01-77, date 3.
Licensed Thermal Power (MWt):
2,652 ofcommercial operation.
4.
Nameplate Rating (Gross MWe):
860 5.
Design Electrical Rating (Net MWe):
829 6.
Maximum Dependable Capacity (Gross MWe):
855.7 7.
Maximum Dependable Capacity (Net MWe):
812 3.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A 9.
Power Level To Which Restricted, If Any (Net MWe) N/A 10.
Reasons For Restrictions,If Any:-
N/A This Month -
Yr.to Date i Cumulative 11.
Ilours in Reporting Period 720.0 8,016.0~
l4R256.0 12.
Number OfIlours Reactor Was Critical 720.0 7,798.6
'110,919.9:
13.
Reactor Reserve Shutdown llours 0.0 0.0 3,650.0 -
14.
Hours Generator On-line 720.0,
7,778.9 109,162.6 0.0 15.
Unit Reserve Shutdown Ilours 0.0 0.0 16.
Gross Thermal Energy Generated (MWII) 1,909,034.3-20,519,100.6 280,520,176.4 17.
Gross Electrical Energy Generated (MWII) 619,240.0 6,606,834.0 90,373,636.0 13.
Net Electrical Energy Generated (k 'II) 588,292.0 6,264.618.0--
85,330,868.0 19.
Unit Service Factor 100.0 97.0-77.8 20.
Unit Availabilty Factor 100.0 97.0-77.8 21.
Unit Capacity Factor (Using MDC Net) 100.6 96.3' 74.7 22.
Unit Capacity Factor (Using DER Net) 98.6 94.3 ~
73.4' 23.
Unit Forced Outage Rate 0.0 3.0 -
' 6.4 -
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Fxh):
Refueling / Maintenance Outage March 4,1994. Approximately 56 days.
25.
If Shut Down at End Of Report Period, Estimated Date of Startup:
N/A 26.
Units In Test Status (Prior To Commer cial Operation):
. Forecast
- Achieved Initial Criticality 08/06/77 0&'09111 Initial Electricity 082.091-08/18/77 Commercial Operation 12/2191' 12/ DIG 1'
i-1 j
DOCKET NO.
50-348 ~
UNIT :
1 j'
' DATE December 6,- 1993 l
COMPLETED BY-R. D. Hill -
j
[
TELEPHONE - (205) 899-5156-l 4
Y
+
l MONTH ~' NOVEMBER l
DAY AVERAGE DAILY POWER LEVEL DAY - AVERAGE DAILY POWER LEVEL'.
l (MWe-Net).
(MWe-Net)
- l
]
1 823'
.17 -
'810-
.2 822
' 18 -
8'18
-1 3
820 19 818-N 4
815 20' -
- I819-I o
5 810~ 819 j
6
-809' 22 819:
t 7
823 23 819 8
822 24 819-i 9
819 25.
'819-10 821 26 817 11 821 27 817-12 818-28,
'819-i 13 813 29
'819 i
- l 14 808~
30
'818-1 15 810 -
31-N/A l
5!
16 810-
.j
.i PjSTRUCTIONS On dus format, list the average daily unit power level in MWe-Net for each day in Gm reporting period. Cornpute to em nearest m4ude megawstL 11
Joseph M. Fcrley Nuclerr PI:nt Unit I Narrative Summary of Operations November 1993 l
l There were no unit shutdowns or major power reductions during the month of November.
The following major safety related maintenance was performed during the month:
1.
Performed miscellaneous corrective and preventive maintenance on the diesel l
generators.
l 1
4
/
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKIRNO.
50-348 UNIT NAME J. M. Farley - Unit i DATE December 6,1993 COMPLLTED IlY R. D. Ilill REPORT MONTil NOVEMBER TELEPIIONE (205) 899-5156 MImIOD OF LICENSEE CAUSE AND CORRECI1VE DURATION SIIUTITNG EVENT SYSTEM COMPONENT ACTION TO
- NO.
DATE TYPE (1)
IlOURS REASON (2) DOWN REACTUR Q)
REPORT #
CODE (4)
CODE (5)
PREVENT RrrURRENCE There were no shutdowns or power reductions during the month of November.
1:
2:
3:
4:
5:
F: Forced Reason Method Exhibit G. Instructions for Exhibit I-Same Source S: Scheduled A Equipment Failure (Explain)
.1-Manual Preparations of Date Entry
- D MaintenanceorTest 2 ManualScram Sheets for Licensee Event
. C - Refueling 3 Automatic Scram Report (LER) File (NUREG-0161)
D-Regulatory Restriction.
4 - Other(Explain)
E - O erator Training & license Esami-stica i
F-Administrative G - Operational Error (Fglain)
II-Other(Explain)
OPERATING DATA REPORT DOCKET NO.
50-364 l
DATE-December 6,1993 f
COMPLETED BY R. D. Ilill TELEPHONE (205) 899-5156
}
f I
onuma srrres t
1.
Unit Name:
Joseph M. Farley - Unit 2 Notes 2.
Reporting Period:
November 1993
- 1) Cumulative data since 07-30-81, date 3.
Licensed Thermal Power (MWt):
2,652 ofcommercial operation.
j 4.
Nameplate Rating (Gross MWe):
860 t
5.
Design Electrical Rating (NetMWe):
829 6
Maxi.num Dependable Capacity (Gross MWe):'
863.6 i
7.
Maxir,4um Dependable Capacity (Net MWe):
822 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons N/A l
9.
Power Irvel To Which Restricted, If Any (Net MWe) N/A 10.
Reasons For Restrictions,IfAny:
N/A l
This Month Yr.to Date Cumulative I
11.
Ilours in Reporting Period 720.0 8,016.0 108,169.0 12.
Number OfIlours Reactor Was Critical 25.2 6,372.3 92,394.2
(
13.
Reactor Reserve Shutdown Ilours 0.0 0.0 138.0 -
14.
11ours Generator On-line 0.0 6,152.0 91,068.7-15.
Unit Reserve Shutdown llours 0.0 0.0 -
. 0.0 16.
Gross Thermal Energy Generated (MWII) 0.0-15,900,208.7 232,431,156.5 -
17.
Gross Electrical Energy Generated (MWH) 22.0 5,180,941.0 76,193,119.0' l8.
Net Electrical Energy Generated (MWII)
' (9,812.0) 4,906,313.0 72,245,511.0 19.
Unit Service Factor 0.0 76.7 84.2 20.
Unit Availabilty Factor 0.0 76.7 84.2 l
21.
Unit Capacity Factor (Using MDC Net)
N/A
'74.5 81.5 22.
Unit Capacity Factor (Using DER Net)
N/A 73.8 80.6 j
23.
Unit Forced Outage Rate 0.0 4.0 4.0 f
24 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
l N/A 25.
If Shut Down at End Of Report Period, Estimated Date ofStartup:
December 2,1993 j
26.
Units in Test Status (Prior To Commercia10peration):
- Forecast
. Achieved Initial Criticality 05/06/81 05/08/81 l
Initial Electricity 05/24/81 05/25/81 l
Commercial Operation 0.8/01/81 02/30/81 l
.]
l
.m
I o
DOCKET NO.
50-364 i
UNIT 2
DATE December 6,1993 COMPLETED BY R. D. Hill TELEPIIONE (205) 899-5156 l
MONTH NOVEMBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) i 1
0 17 0
i 2
0 18 0
3 0
19 0
l 4
0 20 0
5 0
21 0
l 6
0 22 0
7 0
22 0
l 8
0 24 0
9 0
25 0
10 0
26 0
11 0
27 0
l 12 0
28 0
13 0
29 0
14 0
30 0
l 15 0
31 N/A 16 0
issmuloss On this format, list the average daily unit power levelin MWe-Net for each day in die reporting period. Compute to the nearest whole merswatt.
-. =.
~
Joseph M. Ftrley Nucle:r Plant Unit 2 Narrative Summary of Operations.
November 1993 l
The cycle 9-10 refueling outage continued through the month of November.
The following major safety related maintenance was performed during the month of j
November:
1.
Performed miscellanecus corrective and preventive maintenance on the diesel j
generators. Completed work on the 2C diesel generator as part of the station.
l black-out modification.
Ll 2.
Performed eddy. current testing, sleeving of tubes, and plugging of tubes in all j
three steam generators.
3.
Completed refueling the reactor and performed the reactor vessel assembly.
4.
Achieved reactor initial criticality at 2251 on Il-29-93.
r i
i
.J 1
i i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-364 UNIT NAME J. M. Farley - Unit 2 DATE December 6,1993 COMPLETED llY R. D.11i11 REPORT MONTil NOVEMBER TELEPIlONE (205) 899-5156 MEDIOD OF LICENSEE CAUSE AND CORRECTIVE DURADON S11UTITNG EVENT SYSTEM COMPONENT ACllONTO NO.
DATE TYPE (l)
IlOURS REASON (2)
DOWN REACTOR (3)
REPORT #
CODE (4)
CODE (5)
PREVENT RFCURRENCE 005 931001 S
720 C
1 N/A N/A N/A The cycle 9-10 refueling continued fmm 930925.
l i
1:
2:
3:
4:
5:
F: Forced Reason Method Exhibit G Instructions for Exhibit I-Same Source
~ 5: Scheduled A - Equipment Failure (Explain)
I-Manual Preparations of Date Entry -
B. Maintenance or Test 2 - Manual,
sheets for Licensee Event C-Refueling 3 - Automatic.. ram '
Report (LER) File (NUREG-0161) -
D-Regulatory Restriction 4 -Other(Explain)
- E - Operator Training & Ucense Examination -
F-Adm nistrative
+
i
- G-Operational Error (Explain)
II-Other(Explain)
..