T.S.6.9.1.6. l P11ILADELPHIA ELECTRIC COMPANY. f LIMERICK GENERATING STATION ,
P. O. BOX 2300 SANATOGA, PA 19464-2300 f December.13, 1993 l Docket Nos. 50-352 !
'50-353 'f
, . License Nos. NPF-39 ,
'NPF-85 ij i
U. S. Nuclear Regulatory Commi'ssion l l Attn: Document Control Desk .
! Washington, DC 20555 .
Subject:
Limerick Generating Station Monthly Operating Report For .
l Units 1 and 2 ,
i Enclosed are the monthly. operating reports-for Limerick Units '
1 and 2 for the month of November, 1993 - forwarded pursuant _ to '
Technical Specification 6.9.1.6.
very truly yours,.
2P5L 'N J es A. Muntz . . !
Director - Site Engineering jjm Enclosures cc: T.-T. Martin, Administrator,-Region I, USNRC~(w/ enclosures)
N. S. Perry, USNRC Senior Resident-Inspector LGS ~
(w/ enclosures) .
D. R. Helwig, Vice President, Limerick Generating Station I i
170fm u 93 ,
gDg217007493121g2 ADOCK0500g .-
.gKy j 11 \
. . Dock %t No. 50-352 :
Attcchm:nt to Monthly !
Operating Report for November 1993 Limerick Generating Station Unit 1 November 1 through November 30, 1993 I. Narrative Summary of Operatine Exoeriences Unit 1 began this operating period at 99% of rated thermal power (RTP).
On November 5, 1993 at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> power was reduced to 95%
RTP in order to remove extraction steam to the 5th feedwater heaters. Power was restored to 100% RTP at 1345 hours0.0156 days <br />0.374 hours <br />0.00222 weeks <br />5.117725e-4 months <br />.
On November 12, 1993 power began to decrease due to end-of-cycle coastdown.
On November 14, 1993 at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> power was reduced to 96%
RTP for main turbine valve testing. Power was restored to 98.5% RTP shortly thereafte- .
On November 28, 1993 at 0525 hours0.00608 days <br />0.146 hours <br />8.680556e-4 weeks <br />1.997625e-4 months <br /> power was reduced to 88.5% RTP due to high turbine backpressure. Power was i restored to 92% RTP by 0855 hours0.0099 days <br />0.238 hours <br />0.00141 weeks <br />3.253275e-4 months <br />.
On November 28, 1993 at 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> power was reduced to 50%
RTP for performance of control rod hydraulic control unit work and condenser cleaning.
Unit 1 ended this operating period at 50% of rated thermal power with control rod maintenance work continuing. 1 II. Challences to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief ,
Valves during the month of November. i i
QVERAGE DQILY UNIT POWER LEVEL
- DOC'tET NO. 50 - 352 .
UNIT LIMERICK UNIT 1 DATE DECEMBER 9, 1993 ,
COMPANY PHILADELPHIA ELECTRIC COMPANY JOHN J. MCMENAMIN REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3794 MONTH NOVEMBER 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
-(MWE-NET) (MWE-NET) 1 1026 17 986 2 1024 10 987 3 1017 19 975 4 1015 20 978 5 1006 '. 21 975 6 1018 22 969 7 1020 23 968 8 1021 24 957 9 1021 25 959 10 1021 26 952 11 1022 27 942 12 1007 28 869 e 13 1008 29 '430 14 992 30- 445 15 987 16 993
__ _ _ _ _ . _ . . _ _ . _ _ _ _ _ . _ _ . . _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ ._ _ _ , .. . . . . . '._... - ,, . . _ . . . . _ . . _ _. . . . _ _ . . _ . _ , _ . . . .__, a _ u . . . . . . -
OPEROTING DATA REPORT ,
DOCGET NO. 50 - 352 ,
DATE DECEMBER 9 1993 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY '
--...-----....._- _=--....-.
JOHN J. MCMENAMIN 4 REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION --3794 -
OPERATING STATUS
- 1. UNIT UAME: LIMEftICK -..---------- UNIT 1 ~~h0TES: THERE WAS ONE LOAb DROP
- 2. REPORTING PERIOD: NOVEMBER. 1993 GREATER THAN 20% THIS MONTH- ,
- 3. LICENSED THERMAL POWER (MWT): 3293 TO PERFORM CONTROL ROD'
- 4. NAMEPLATE RATING (GROSS MWE): 1138 HYDRAULIC CONTROL UNIT' WORK
- 5. DESIGN ELECTRICAL RATING (NET MWE): 1055 AND CONDENSER CLEANING.
'G. MAXIMUM DEPENDADLE CAPACITY (GROSS WWE): 1092 1
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):. 1055
= . -
- 8. - IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER'3 THROUGH_7) SINCE LAST REPORT. GIVE REASONS:
i
- 9. POWER LEVEL'TO WHICH RESTRICTED. IF ANY (N'ET MWE):
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH YR-TO-DATE. ' CUMULATIVE
- 11. HOURS IN REPORTING PERIOO - ' 720 8.016 68.640 -
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7.905.9g '55.455.1
- 13. REACTOR RESERVE. SHUTDOWN HOURS 0.0 0.0 0.0
- _- -= .
14 HOURS GENERATOR ON-LINE c720.0 -7.882.6; 54.440.8-
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 - 0.0 .O.0
=........
=- - --
- 16. GROS $ THERMAL ENERGY GENERATED (MWH) . 2.224.078. 25.649,2487 - 167.382.713. .. -
17.' GROSS ELECTRICAL ENERGY GENERATED (MWH)- .
'711.700' ._
.. 8.409.020.
54.385.160
- 18. NET ELECTRICAL' ENERGY' GENERATED (MWH). . 686.146 8.'113.960) - 52.154.477.' --- .-
- .....-s-.. ----.------- ...
PAGE'1 OF 2 +
+
t.
i t
e_.u -am_u__ -mm_._.i_--.cs.-___m_.__.____.___ m_2._me+ -a_ -*---+a..a__ + w oree w es 'ea=r.-e 4 m '- vnwtw --st--- -t *'-,++wwe~T-e rF -A-? e e .wm-'se ve in Nw
- v ervreeMed weeis- e ,4 wmab erad hr wre i s --w-e- 4 Tew W2e.-._m.u*-- .er.w.m u.u-.---_ia..-- -_.a_
OPERQTING DGTo REPORT (CONTINUED) DOCKET NO. 50 - 352 ,
_ _ _ . = .
DATE DECEMBER 9, 1993 THIS MONTH VR-TO-DATE CUMULATIVE .
- 19. UNIT SERVICE FACTOR 100.0 98.3 79.3
- 20. UNIT AVAILABILITY FACTOR 100.0 98.3 79.3
- 21. UNIT CAPACITY FACTOR (USING MOC NET) 90.3 95.9 72.0
- 22. UNIT CAPACITY FACTOR (USING DER NET) 90.3 95.9 72.0
- 23. UNIT FORCED OUTAGE RATE 0.0 1.7 4.8
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):
STH REFUELING OUTAGE: 1/79/94: 45 DAYS
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26.. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITY MID APRIL 85 4/13/85 COMMERCIAL OPERATION IST QTR 86 2/01/86 PAGE 2 0F 2.
_. _ . . _ . _ _ _ . _ _ _ _ . _ __ _ _ _ .__ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ - . . . , _ , . . . _ _ . _ . . , _ . ...._s __._. . _ _ _ _ _ . ,
G UNIT SHUTDOWNS AND POWER REDUCTIONS ' DOCKET NO. 50 - 352 UNIT NAKE LIKERICK UNIT 1
^
DATE DECEMBER 9 1993
- REPORT MONTH NOVEMBER. 1993 COMPLETED BV PHILADELPHIA ELECTRIC COMPANY JOHN J. MCMENAMIN ,
REPORTS ENGINEER '
SITE ENGINEERING n LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3T94
- - - - - - - - - _ _ - - - - - - . . . . . . _ - - - - - _ . . _ _ - - - - - . . . . . = = - - - - - - = - - - . . . - - .. ----- -- - - - - - - - - - -
METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND' CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT * (4)- (5) PREVENT RECURRENCE-26 931105 5 000.0 H 4 N/A CH HTEXCH REACTOR POWER WAS REDUCED TO 95% TO REMOVED THE STH FEEOWATER HEATER FROM SERVICE DUE TO COASTDOWN. ;
27 931114 S 000.0 B 4 N/A HA INSTRU REACTOR POWER WAS REDUCED TO 96% FOR '
MAIN TURBINE VALVE TESTING.
28 931128 F 000.0 d 4 N/A HA TURBIN REACTOR POWER WAS REDUCED TO 88.5% TO REDUCE HIGH TURBINE BACKPRESSURE.
29 931128 S 000.0 8 4 N/A RB CONROD REACTOR POWER WAS REDUCED TO 50% TO-PERFORM CONTROL ROD HYDRAULIC CONTROL.
UNIT MAINTENANCE AND TO PERFORM' CONDENSER CLEANING. ,
.I (1) (2)' '(3)' (4)
F - FORCED REASON METHOD EXHIBIT G ~ INSTRUCTIONS S - SCHEDULED A- EQUIPMENT FAILURE (EXPLAIN) '1 - MANUAL .FOR PREPARATION OF DATA B - MAINTENANCE _OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)
D - REGULATORY RESTRICTION OTHER (EXPLAIN) '
' FILE.(NUREG-0161)
E - OPERATOR TRAINING +' LICENSE EXAMINATION F - ADMINISTRATIVE -(5):'
- G - OPERATIONAL ERROR ~ (EXPLAIN).
H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE - t
'( .
4
- . ,.s ..-',...I. ,-,.-,*.~-#.-.4- , , - e.,t.e. . ,m... ~,Es -c.,-.As .e e - ...e.,,+-d.- ,.).*%e, er ,v % ,..a webi. ,-. . , . .. , _ + , . ,
l 1
- . Dockst No. 50-353 .)
~Attachm:nt to Monthly.. _j Operating Report for.
' November'1993 Limerick Generating Station Unit 2 November 1 through November 30,'1993 i
I. Narrative Summary of Operatina Experiences Unit 2 began this operating period at 100% of ratedLthermal ;
power (RTP) . j On November 6, 1993 at 0823 hours0.00953 days <br />0.229 hours <br />0.00136 weeks <br />3.131515e-4 months <br /> power was reduced to 80%~ l RTP for a control rod pattern adjustment and-SCRAM time testing. Power was. restored to 100% RTP at 2120 hours0.0245 days <br />0.589 hours <br />0.00351 weeks <br />8.0666e-4 months <br />. !
On November 14, 1993 at 1320 hours0.0153 days <br />0.367 hours <br />0.00218 weeks <br />5.0226e-4 months <br /> power was reduced to 97%
RTP for a centrol rod exercise test and then restored to ,
100% RTP shortly thereafter.
On November 21, 1993 at 0934 hours0.0108 days <br />0.259 hours <br />0.00154 weeks <br />3.55387e-4 months <br /> power.was reduced to 92%~
RTP for Main Turbine Valve Testing. Power-was restored to J
100% RTP at 1250 hours0.0145 days <br />0.347 hours <br />0.00207 weeks <br />4.75625e-4 months <br />. l Unit 2 ended this' operating period at'100%-of ratedLthermal- ;
power.
II. Challences to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief l l
Valves during the month of November. :
i l
l 1.
i l
I
DVERAGE DQILV UNIT POWER LEVEL ,
DOCKET NO. 50 - 353 .
UNIT LIMERICK UNIT 2 DATE DECEvBER 9, 1993 ,
COMPANY PHILADELPHIA ELECTRIC COMPANY JOHN J. MCMENAMIN REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3794 MONTH NOVEMBER 1993 DAY AVERAGE DAILY POWER LEVEL DAV AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 1070 17 1065 2 1071 18 1070 3 1070 19 1063 4 1072 20 1071 5 1064 21 1060 6 990 22 1071
- 7. 1073 23 1075 8 1073 24 1065 9 1073 25 1075 10 1072 26 1074 11 1071 27 1065.
12' 1068 28 1062 13 1069 29 1067 14 1060 30 1071 15 1056 16 1066
_ . , , . . - . . , . . . . _ . . . . - . , . . . . - _ , . . - - - .-_ .. . .. _ . _ . - - - _ . - . . - - . . . _ _ . - . .. _ , ~ ~ . . _ - . . . . - . - - , _ . - - -
OPERATING DATA REPORT ,
DOCGET NO. 50 - 353 .
DATE DECEMBER 9. 1993 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY ,
JOHN J. MCMENAMIN REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3794 OPERATING STATUS _ _ _ - _ _ _ _ _ - - - - _ _ . . . - - . - . . _ - - - - ----_
- 1. UNIT NAME: LIMERICK UNIT 2 NOTES: THERE WAS ONE LOAD DROP
- 2. REPORTING PERIOD: NOVEMBER, 1993 GREATER THAN 20% THIS
- 3. LICENSED THERMAL POWER (MWT): 3293 MONTH TO PERFORM CONTROL
- 4. NAMEPLATE RATING (GROSS MWE): 1138 ROD PATTERN ADJUSTMENTS
- 5. DESIGN ELECTRICAL RATING (NET MwE): 1055 AND SCRAM TIME TESTING.
6.
MAXIMUM DEPENOABLE CAPACITY (GROSS MWE): 10 ]
7 MAXIMUM DEPENDABLE CAPACITY (NET WWE): 1055
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720 8,016 34.152
_~_--___.___ -.....-... . = __.--.
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 6.657.8 29,898'6 .
_--____...-- ... -___..._ - _=___.
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 720.0 6,546.2 29,202.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,358,192 20,890.734 92.856,884
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 792,530 .6,916.340 30,669,446
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 767.261 6,670,604 29,533.651 PAGE 1 OF 2
O OPERQTING DQTA REPORT (CONTINUED) DOCKEY NO. 50 - 353 .
__..____ ._________ ______... ~*
DATE DECEMBER 9, 1993 THIS MONTH YR-TO-DATE CUMULATIVE ,
- 19. UNIT SERVICE FACTOR 100.0 81.7 85.5
- 20. UNIT AVAILABILITY FACTOR 100.0 81.7 85.5
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.0 78.9 82.0
- 22. UNIT CAPACITY FACTOR (USING DER NET) 101.0 78.9 82.0
- 23. UNIT FORCED OUTAGE RATE O.0 2.7 4.2
- _ = _ _ - = - _ - _ - _ _ _ __.__....___
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUPa
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 08/12/89 08/12/89 INITIAL ELECTRICITY 09/01/89- 09/01/89 COMMERCIAL OPERATIO.4 02/01/90' 01/08/90 PAGE 2 OF 2
.__ . _ . _ . _ . _ _ _ - - _ _ _ - - _ - - _ _ _ _ _ _ . - _ _ - _ _ _ - - - _ - _ _ _ _ - - .__ , - - -. . , . . --- , . . . ~ , ~ . - . . - .~ .- . - . - - . . - ._
UNIT SHUTDOWN 5 AND POWER REDUCTIONS DOCKET NO. 50 - 353 ,
UNIT NA%E LI~ERICK UNIT 2 REPORT MONTH NOVEMBER, 1993 COMPLETED BY PHILAOELPHIA ELECTRIC COMPANY .
JOHN J. MCMENAMIN ",
REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (215) 32T-1200 EXTENSION 3T94 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOwN EVENT CODE CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT s (4) (5) PREVENT RECURRENCE 43 931106 S 000.0 0 4 N/A RB CONROD REACTOR POWER WAS REDUCED TO 80% FOR CONTROL RCD PATTERN ADJUSTMENTS AND TO PERFORM SCRAM TIME TESTING.
44 931114 S 000.0 B 4 N/A RB CONROD REACTOR POWER WAS REDUCED TO 9T% FOR CONTROL ROD EXERCISE TESTING.
45 931121 $ 000.0 B 4 N/A HA INSTRU REACTOR POWER WAS REDUCED TO 92% FOR MAIN TURBINE VALVE TESTING.
(1) (2) (3) (4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR-TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. ' EVENT REPORT (LER)
D - REGULATCRV RESTRICTION - 4 - OTHER (EXPLAIN) FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE .' (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE