Informs That as Discussed in to Nrc,Rev 6 of Unit 1 IST Plan phased-out Prior to Return to Power Following Third Refueling Outage for CPSES Unit 1.Subj Plan May Be Discarded or Marked Historical
ML20058L235
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 12/10/1993
From: William Cahill, Walker R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-93420, NUDOCS 9312160197
Download: ML20058L235 (5)


Text

.

l'

==

Log # TXX-93420 File # 10010.1 905.4 (clo)

__,,r r

Ref. # 10CFR50.55a(f)

TUELECTRIC December 10, 1993

% illiam J. Cahill, Jr.

j tiroup Vh e PerssJerrt U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

CDMANCHE PEAK STEAM ELECTRIC STATION (CPSES) - UNIT 1 DOCKET NO. 50-445 PHASE OUT OF REVISION 6 0F THE UNIT 1 INSERVICE TESTING PROGRAM PLAN REF:

TU Electric Letter logged TXX-92302 from Mr. William J. Cahill, Jr. to the NRC, dated July 2,-1992 Gentlemen:

Reference 1 transmitted Revision 0 of the combined Unit 1 and 2 Inservice Testing Plan (IST) and described the phase-in process for Unit 1.

Since t

July 2, 1992, two IST Plans have been in use:

1)

Inservice Testing Plan for Unit 1 Only (curre-ly Revision 6) 2)

Inservice Testing Plan for Units 1 and 2 (currently Revision 3) l As discussed in Reference 1 the Unit 1 IST Plan (item 1 above) was phased-out prior to the return to power following the third refueling outage for CPSES Unit 1 (1RF03). As noted in the enclosed memo either discard your i

copy of the Unit 1 IST Plan or mark your copy as " historical".

I I

140008 i

i

[40 '[

f n

9312160197 931210

\\ gDR ADOCKOS00g5 1

4% N, Ohve Street LB. 81 Da! Ins. Texas 75201 i

TXX-93420

.Page 2 of 2 If you have any questions, please call Mr. Carl Corbin at (214) 812-8859.

Sincerely, n/JL & GA B>b William J. Cahill, Jr.

By:

Roger D. Walker u

oyA ar Manager CBC/cbc Enclosure c - Mr. J. L. Milhoan, Region IV Resident Inspectors, CPSES Mr. T. A. Bergman, NRR y

Mr. G. Bynog, TOLR Mr. J. C. Hair, Authorized Nuclear Inservice Inspector, CPSES I

m He a

4 w

A

'0 ws a

m j

+

-,w-4

.a 4

A l

1 J

l c

i l

1 i

l f

1 I

i t

I i

I a

r B

1 i

9 ENCLOSURE TO TXX-93420 P

d

?

8

- I t

' l I

' i 8

a 7

9 i

)

9 P

+

a

?

E e

t a

e i

s i

f

+

e

-, r

-t y

v1---,

y t

,,1--

--m-.

f n1UELECTRIC OFFICE MEMORANDUM i

a CPSES-9318035 TUS-93421 December 3, 1933' DCC to issue memo to l

IST Unit I copy holders l

T0:

Distribution

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

INSERVICE TESTING PLAN, UNIT 1 ONLY, REVISION 6 Ref:

1)

TU Electric Letter Logged TXX-92302, from William J. Cahill, Jr.,

l to the NRC-dated July 2, 1992 l

Reference 1 transmitted Revision 0 of the combined Unit 1 and 2 Inservice i

Testing Plan (IST) and described the phase-in process for Unit'1.

Since July 2, 1992, two IST Plans have been in use:

1)

Inservice Testing Plan for Unit 1 Only (currently Revision 6)

[

2)

Inservice Testing Plan for Units 1 and 2 (currently Revision 3)

I As discussed in Reference 1 the Unit 1 IST Plan (item 1 above) is being phased out before the return to power following the third refueling outage for CPSES 3

Unit 1 (1RF03). The implementation status has been tracked by. Technical Compliance.

The phase-in process has assured that the appropriate portions.of the combined plan have been implemented prior to superseding related portions of the existing Unit 1 program plan.

This memo requests that the copy holders of the Unit 1 only IST Plan, Revision i

6, discard, or clearly mark the cover sheet and the outside of the manual as-i

" historical, the Unit 1 IST plan (item 1 above) after Unit I has entered Mode 4 during the startup for cycle 4. -After Mode 4'the Unit 1 and 2 IST. Plan i

(item 2) will supersede the Unit 1 IST Plan (item 1 above).

i If you have any questions please contact Carl Corbin at (214) 812-8859.

D. R. Woodlan 24ST Docket Licensing Manager CBC/grp C6c_

j

/$3 c-CCS E06

. ;i 1 o,3 pai)

= -.

i TUS-93421 l

Pag 6 2 of 2 l

.t Distribution R.T. Blankenship (006)

J.H. Brau (011) f D.E. Buschbaum (006)

R.G. Cockrel (C07B)

J.W. Donahue (002)

C.K. Feist (C07B) l F.W. Madden (C078)

R.B. Mays (006)

G.P. McGee (006)

J.W. Muffett (C07B)

D.

Nelson (F04) (Please distribute memo and acknowledgement sheet to Unit 1 IST Plan copy holders) t I

f t

i

-l i

5 i

i l

.]

f i

5 l

7 i

t r

-. -