ML20058K626

From kanterella
Jump to navigation Jump to search

Forwards Rev 1 to Sequoyah Nuclear Plant Unit 1,Cycle 6 Core Operating Limits Rept
ML20058K626
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 12/08/1993
From: Fenech R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20058K631 List:
References
TAC-M86824, TAC-M86825, NUDOCS 9312150340
Download: ML20058K626 (3)


Text

.

t 4

l 1

. ~ -.. -. -

Tennersst e Va!!ey /suthonty. Post OfN:e Dox 2000, Sad 1y-Datsy. Tennenee 37379-2000 i

i Robert A Fenech

%ce Pf e+ckint Sequovah tuloar Plant f

December 8, 1993 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

-l Gentlemen:

In the Matter of

)

Docket No. 50-328 Tennessee Valley Authority

)

SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 2 CORE OPERATING LIMITS REPORT (COLR),-

REVISION 1 i

Reference:

TVA letter to NRC dated June 4, 1992, "Sequoyah Nuclear Plant j

(SQN) - Unit 2 Core Operating Limits Report (COLR)"

In accordance with SQN Unit 2 Technical Specification (TS) 6.9.1.14.c, i

enclosed is the Unit 2 Cycle 6 COLR, Revision 1.

This midcycle revision is I

being provided to implement the methodology approved by NRC in TS

[

Change 93-07, End of Life Moderator Temperature Coefficient ~ Relaxation.

(reference TAC Nos. M86824 and M86825).

Please direct questions concerning this issue to W. C. Ludwig at (615) 843-7460.

l Sincerely,

. Robert A. Fenech Enclosure cc: See page 2

{

M0020 oh

\\

l 5

9312150340 931200 "I

l PDR ADOCK 05000328 O

P PDR M

i P

I

~

i U.S. Nuclear Regulatory Commission Page 2 l

December 8, 1993 l

f l

cc (Enclosure).

Mr. D. E. LaBarge, Project Manager j

U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike l

Rockville, Maryland 20852-2739 I

NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igos Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II

j 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711

]

i I

I 1

f j

i i

J l

i l

..~..

1 i

1 ENCLOSURE l

SEQUOYAH NUCLEAR PIANT UNIT 2 CYCLE 6 CORE OPERATING LIMITS REPORT REVISION 1 i

i NOVEMBER 12, 1993 i

l (L36 931202 802)

[

l l

[

r i

i i

i r

h

-l l

I l

i k

l

.I l.l l

i

?

--4.

,