ML20058K776
| ML20058K776 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 02/10/1975 |
| From: | Larson C NORTHERN STATES POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20058K782 | List: |
| References | |
| NUDOCS 9102140382 | |
| Download: ML20058K776 (1) | |
Text
-
- =
p
,.)C \\
y l
~
i i NORTHERM STATES POWER COMPANY
- ~f s
Hunticello, Minnesota 55362 s
t t
7 February 10, 1975 I
i Mr. J. G. Keppler, Director Regim TII
.tOffice of Inspection and Enforceury2r t
United States Nuclear Regulatory C==hsion o
7 799 Ibosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. - Keppler:
MONTF'PT Tn MKLEAR GD EP.ATEXi PIET
~
Docket Ib. 50-263 License Ib. LFR-22 Ort February 9,1975, s:cke was observed erm%g from the motor starter for reactor water cicam:p discharge isolatica. valve, ID 2339.
Investi-gation revealed that a shorted relay coil resulted in overheating of the control tr=nsformer in the r:otor starter.
Failure of the centrol transformer caused the isolatica valve to be in per:ble.
Neither this i
. valve nor another valve in the discharge line was placed in the c1csed
'3he f:liled position as required by Techlical Specificatien 3.7.D.2.
relay and notor starter were repicced anti the systesa was returned to norcal cperation within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
Further investigation of this mience is continuing.
Yours very :nly, 1,:
C
.x2 Plant !hnaget l
CEL/m en 6
cc: A Giambusso G Charnoff i
Minnesota Pollutien Control Agency Attn:
E A Pry:ina File f
1 7102140382 750210 t
i P
b
- 6
,,,-n,,
c
,, ~. ~ -, -,, - -. - - - - -,. - - - -
- - - --- -