ML20058K776

From kanterella
Jump to navigation Jump to search
Ro:On 750209,smoke Was Observed Coming from Motor Starter for Reactor Water Cleanup Discharge Isolation Valve Caused by Shorted Relay Coil Resulting in Overheating of Control Transformer
ML20058K776
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/10/1975
From: Larson C
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20058K782 List:
References
NUDOCS 9102140382
Download: ML20058K776 (1)


Text

- . . - = . - . .

, .)Cy \

p

  • l

~

i i STATES POWER COMPANY *~f NORTHERM s s

Hunticello, Minnesota 55362 -

t t

. 7 February 10, 1975 .

I i

Mr. J. G. Keppler, Director Regim TII -

.tOffice of Inspection and Enforceury2r United States Nuclear Regulatory C==hsion o 7 t

799 Ibosevelt Road .

Dear Mr. - Keppler:

MONTF'PT Tn MKLEAR GD EP.ATEXi PIET ~

Docket Ib. 50-263 License Ib. LFR-22 Ort February 9,1975, s:cke was observed erm%g from the motor starter for reactor water cicam:p discharge isolatica . valve, ID 2339. Investi-gation revealed that a shorted relay coil resulted in overheating of the control tr=nsformer in the r:otor starter. Failure of the centrol Neither this  ;

transformer caused the isolatica valve to be in per:ble. i

. valve nor another valve in the discharge line was placed in the c1csed position as required by Techlical Specificatien 3.7.D.2. '3he f:liled _

relay and notor starter were repicced anti the systesa was returned to norcal cperation within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. Further investigation of this mience is continuing.

Yours very :nly, .

C . .x2 1,:

Plant !hnaget l,

CEL/m en 6

cc: A Giambusso G Charnoff i Minnesota Pollutien Control Agency ,

Attn: E A Pry:ina File ,>

f 1

7102140382 750210 t CF ADDCK 05000263 '

CF g, i P

b

  • 6

-. ,,,-n,, c , , ~ . ~ - , - , , - - . - - - - - , . - - - - - - - - , - . . - . - - . - - _ , - .- -- - - -- - - - --- -