MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
, !
4 l
, see
'Af T elntthtnie (412) 39MAKK) f 4utloar Grauss f' O fion 4 Muppospport l'A 18,077 DKM December 8,1993 <
Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operatmg Report l
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:
In accordance with Appendix A, Technical Specifications, the Monthly i' Operating Report is submitted for Unit I and Unit 2 for the month of November,1993. ,
i Respectfully, N )1, W' '
(/'.
D E. Spoerry p# i Division Vice President Nuclear Operations DTJ/mmg Enclosures cc: NRC Regional Office King of Prussia, PA
[ UU9[ !
9312150028 931130 7 /
PDR ADOCK 05000334 8 / ,
R PDR E f g
\
10RRATIVE SOf%RY OF 1
IOf1HLY OPIRATDJG EXPERIDJCE I l
INIT 1 l l
NOVEMBER 1993 November 1 'Ibe report period began with the Unit in Mode 5 while repairs through to the "C" Reactor Coolant Punp rotor continued.
November 4 November 5 Following satisfactory completion of repairs to the "C" Reactor .
Coolant Punp notar, Pew Coolant System (RCS) heatup was '
-arm and }tde 4 entered at 2352 hours0.0272 days <br />0.653 hours <br />0.00389 weeks <br />8.94936e-4 months <br />.
November 6 'Ihe Unit remained in Mode 4 as notor operated valve (10/) ,
inspections were being performd. RCS heatup was placed on hold at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> pendirg resolution of the issue waxanirq eye-bolt torque values for various }D/'s.
November 7 At 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br /> the Unit - erced cooldcAn to Mode 5 to facilitate 107 inspections in Containment (where scaffoldiry was needed to ensure perscnnel safety).
November 8 Mode 5 was entered at 0212 hours0.00245 days <br />0.0589 hours <br />3.505291e-4 weeks <br />8.0666e-5 months <br />.
November 9 h Unit remained in Mode 5 while IOV inspections were being ,
i through performd.
Noverter 12 November 13 Following satisfactory catpletion of 107 inspections and resolution of eye-bolt torque value concerns, RCS heatup was cuu5 cud ard Mode 4 entered at 1256 hours0.0145 days <br />0.349 hours <br />0.00208 weeks <br />4.77908e-4 months <br />.
November 14 'Ihe Unit entered Mode 3 at 1345 hours0.0156 days <br />0.374 hours <br />0.00222 weeks <br />5.117725e-4 months <br />.
November 15 'Ibe Unit remained in Mode 3 while preparations were in pvgess for entry into }bde 2.
November 16 'Ihe Unit entered Mode 2 at 0545 hours0.00631 days <br />0.151 hours <br />9.011243e-4 weeks <br />2.073725e-4 months <br /> and the reactor was taken critical at 0645 hours0.00747 days <br />0.179 hours <br />0.00107 weeks <br />2.454225e-4 months <br />. At 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br />, wd2ul red K-6 was declared inoperable due to primary voltage irriicatirq the red position was 13 steps low. At 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br /> rod K-6 was declared operable after adjustire supply voltage to within specifications. Otmpletion of calibration of rod position irdication for control rod K-6 was occpleted at 1515 hours0.0175 days <br />0.421 hours <br />0.0025 weeks <br />5.764575e-4 months <br />. ,
Mode 1 was entered at 1613 hours0.0187 days <br />0.448 hours <br />0.00267 weeks <br />6.137465e-4 months <br />. ;
November 17 'Ihe analog rod positicn indication (ARPI) for control rod F-6 was declared inoperable at 0030 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> when rod position was fourd rnMirg greater than 12 steps different than control bank demand. Control rod F-6 was declared operable after recalib ation of ARPI. '
r
NARRATIVE SLHMARY OF FOtmILY OPERATUG EXPERIDJCE UNIT 1 IOVD4BER 1993 (continued)
November 17 The Main Unit Generator was synchronized to the grid at 1115 hours0.0129 days <br />0.31 hours <br />0.00184 weeks <br />4.242575e-4 months <br />. Power was increased to approxi2nately 30% output ard remained there due to Steam Generator chemistry requirements. >
November 18 The Unit remained at approximately 30% output until 1240 hours0.0144 days <br />0.344 hours <br />0.00205 weeks <br />4.7182e-4 months <br /> when Steam Generator chemistry was reported within specification and increase to 100% output began.
November 19 The Unit continued to increase power to 100% output. !
November 20 The Unit achieved 100% output at 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />.
November 21 The Unit operated at a ncminal value of 100% output, t!' rough November 25 November 26 The Unit reduced output from 100% to appruximately 95% twice during the day frm 0857 hours0.00992 days <br />0.238 hours <br />0.00142 weeks <br />3.260885e-4 months <br /> to 1125 hours0.013 days <br />0.313 hours <br />0.00186 weeks <br />4.280625e-4 months <br /> and frca 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br /> to 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> for planned troubleshooting of 'n2rbine controls.
November 27 'Ihe Unit operated at a ncxninal value of 100% output.
thruugh November 30 l
l 1
I i
. j AVERAGE DAILY UTIT POWER IIVEL l i
DOCKET 10. 50-334 i UTIT BVPS Unit 1 DATE Dec. 2, 1993 CINFLETED BY David T. Jones TELEPIDIE (412) 393-7553 i PDmi November 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY IWER LEVEL ;
(!fde-Net) (PMe-Net) 1 0 17 52 i 2 0 18 225 3 0 19 592 4 0 20 792 i 5 0 21 813 6 0 22 804 7 0 23 804 8 0 24 808 9 0 25 821 10 0 26 783 11 _
0 27 808 1 12 0 28 800 13 0 29 808 14 0 30 808 15 0 31 16 0 INSTRUCTIGIS On this form, list the average daily unit power level }He-Net for each day in the reporting month. Oxpute to the nearest whole megawatt.
1 I
I OPERATING DATA REPORT '
DOCKET NO.: 50-334 REPORT DATE: 12/03/93 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393-7553 3 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: NOVEMBER 1993
- 3. LICENSED TilERMAL POWER (MWt): 2652 .
- 4. NAMEPLATE RATING (Gross MWe): 923 !
- 5. DESIGN ELECTRICAL RATING (Net MWe): 835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 860
- 7. MAX. DEPENDABLE CAPACITY (Not MWe): 810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): hne
- 10. REASONS FOR RESTRICTIONS. IF ANY: N/A i
THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 720.0 8016.0 154152.0 t
- 12. NO. OF HRS. REACTOR WAS CRITICAL: 353.3 5236,6 98786.9
- 13. REACTOR RESERVE SifUTDOWN HOURS: 0.0 0.0 4482.8
- 14. HOUR.S CENERATOR WAS ON LINE: 324.8 5148.4 96799.2
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GEN. (MWH): 779517.0 12495367.0 231470368.5
- 17. GROSS ELECT. ENERGY GEN. (MWil) : 249110.0 4034370.0 74528863.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH): 226330.0 3760840.0 69626780.0 45.1
- 19. UNIT SERVICE FACTOR: (PERCENT) 64.2 64.7 l
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 45.1 64.2 64.7 38.8
- 21. UNIT CAPACITY FACTOR (MDC): PCT 57.9 58.3
- 22. UNIT CAPACITY FACTOR (DER): PCT 37.6 56.2 56.6
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 54.9 15.1 15.9
- 24. SliUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACllIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A i
UNIT SHUTDOWNS AND POWER REDUCTIONS (120%) Docket No. 50-334 -
Unit Nome BVPS Unit #1 .
Date December 3. 1993 Completed By _ David T. Jones REPORT MONTH NOVEMBER 1993 T elephone (412) 393-75S3 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No. Date Typel (Hours) Reason 2 Down Reactor 3 Report # Code 4 Code 5 Prevent Recurrence 14 931101 F 161.0 8 4 N/A CB MOTORM The Unit remained shutdown to complete repairs to the "C" Reactor Coolant Pump motor.
15 931107 F 234.25 N 9 N/A XX VALVEX The Unit remained shutdown to complete various motor operated valve inspections.
1 2 3 4 F-Forced Reason: Method: Exhibit F-Instromtions for S Scheduled A-Equipment Failure (Explain) 1 Manual Preparation of Data Entry Sheets a Maintenance or Test 2 Manual Scram for Licensee Event Report (LER) File C Refueling 3-Automatic Scram (NUREG0161).
0-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reduction 5 F-Administrative 9-Other Exhibit H-Same Source.
G-Operational Error (Explain)
H-Other (Explain)
IURPATIVE
SUMMARY
OF MJNIHLY OPERATDiG EXPERIDiCE l
UNIT 2 l 1
NOVD GER 1993
{
Ncr/enber 1 The report perioca began with the Unit in }tde 5. The Unit through ruraained in Mode 5 as the fourth refuelirg outage continued.
Novcsber 20 :
November 21 Reacter Coolant System (RG) heatup was w. am ul at 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> and Mode 4 was entered at 0308 hours0.00356 days <br />0.0856 hours <br />5.092593e-4 weeks <br />1.17194e-4 months <br />. ;
November 22 The Unit entered Mcde 3 at 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br />.
November 23 The Unit rurained in Mode 3 sttile required testing was throtgh performed. Several attempts were rade to &curdwate .
November 28 operability of the Turbine Driven Auxiliary FeedweLer Pung .
while repairs ard testing of three steam supply valves and !
an erratic governor valve continued.
November 29 At 0328 hours0.0038 days <br />0.0911 hours <br />5.42328e-4 weeks <br />1.24804e-4 months <br /> an Unusual Event was declared due to required Unit shutdcun to Mcde 4 per technical specifications for ;
repairs to associated Turbine Driven N wilin y Feedwater Ptep governor and senam supply valves. At 0330 hours0.00382 days <br />0.0917 hours <br />5.456349e-4 weeks <br />1.25565e-4 months <br /> cooldown to Mode 4 was - umAd. Mode 4 was entered at 1005 hours0.0116 days <br />0.279 hours <br />0.00166 weeks <br />3.824025e-4 months <br /> and the Unusual Event teminated.
November 30 Following satisfactory cmpletion of repairs to the Turbine Driven hwiling Feedwater Pump governor and steam supply valves, RCS heatup was c a m e.d at 1720 hours0.0199 days <br />0.478 hours <br />0.00284 weeks <br />6.5446e-4 months <br /> and Mode 3 was entered at 1804 hours0.0209 days <br />0.501 hours <br />0.00298 weeks <br />6.86422e-4 months <br />. The Unit resrained in Mode 3 for the rurairder of the report period as required post raintenance testiry of the Turbine Driven Auxiliary .
Feedwater PLzrp continued.
i i
3 f
i AVIPJGE DAILY INIT POWER IE7EL DOOTT10. 50-412 INIT BVPS Unit 2 DATE Dec. 2. 1993 CEMPLEIID BY David T. Jones TELEMENE (412) 393-7553 IT2TIH Ikwe:nber 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWIR LEVEL
(!Ee-Net) ()Me--Net) e 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 !
9 0 25 0 10 0 26 0 11 0 27 0 ,
12 0 28 0 13 0 29 0 !
14 0 30 0 15 0 31 ,
16 0 i
INSIRDCTIOtG On this fann, list the average daily unit power level }He-lbt for each day in the iwLirg rmth. Cmpute to the nearest whole megerett.
9 OPERATING DATA REPORT ,
DOCKET NO.: 50-412 l REPORT DATE: 12/03/93 J COMPLETED BY: DAVID T. JONES i TELEPHONE: (412) 393-7553 f OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: NOVEMBER 1993
- 3. LICENSED THERMAL POWER (MWt): 2652 ,
- 4. NAMEPLATE RATING (Gross MWe): 923 i
- 5. DESIGN ELECTRICAL RATING (Net MWe): 836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 870
- 7. MAX. DEPENDABLE CAPACITY (Not MWe): 820 !
)
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS: ;
-l i
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): "
None
- 10. REASONS FOR RESTRICTIONS IF ANY: N/A I
THIS MONTH YEAR TO DATE CUMUIATIVE .;
- 11. HOURS IN REPORTING PERIOD: 720.0 8016.0 52935.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL: 0.0 6205.8 44707.0- ;
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.C 0.0 0.0 i
- 14. HOURS GENERATOR WAS ON LINE: 0.0 6197.8 44423.1
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 4
- 16. GROSS THERMAL ENERGY GEN. (MWH): 0.0 15366901.0 108913542.4 ;
- 17. GROSS ELECT. ENERGY GEN. (MWH): 0.0 5073344.0 35217148.0 i
- 18. NET ELECTRICAL ENERGY GEN. (MWH): -10029.0 4795316.0 33245123.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 0.0 77.3 83.9 l
- 20. UNIT AVAIIABILITY FACTOR:(PERCENT) 0.0 77.3 83.9 l
- 21. UNIT CAPACITY FACTOR (MDC): PCT 0.0 73.0 76.1 {
- 22. UNIT CAPACITY FACTOR (DER): PCT 0.0 71.6~ 75.1 i
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 5.4. 1.2 3.0 t
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH)* t THE FOURTH REFUELING OUTAGE CURRENTLY IN PROGRESS BECAN ON SEPTEMBER 17. 1993 ;
AND WAS SCHEDULED TO LAST FOR 70 DAYS. BUT HAS BEEN EXTENDED. !
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 12/7/93 !
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): .
FORECAST ACHIEVED I INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATICN N/A N/A l r
-)
UNIT SMUTDOWNS AND POWER REDUCTIONS (220%) Dock et No. 50-412 Unit Name .9VPS Unit #2 .
Date December 3. 1993 Completed By David T. Jones REPORT MONTH NOVEMBER 1993 Telephone (412) 393-7553 l Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No. Date Typet (Nours) Reason 2 Down Reactor 3 Report 8 Code 4 Code 5 Prevent Recurrence 16 931101 5 6 75 .5 C 4 N/A RC FUELXX Unit remained shutdown to continue with the fourth refueling outage.
17 931129 F 38.6 C 4 2-93-14 WG VALVEX The Unit remained shutdown to repair the Turbine Driven Auxillary Feedwater Pump governor and steam supply valves.
18 931130 $ 5.9 C 4 N/A RC FUELXX Unit remained shutdown to continue with the fourth refueling outage.
1 2 3 4 F-Forced Reason: Meth od: Exhibit F Instructions for S-Scheduled A-Equipment Falture (Emplain) 1-Manuel Preparation of Data Entry Sheeta e Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File C-Refueling 3-Automatic Scres (NUREG0161).
D Regulatory Restriction 4-Cont'd. f rom Previous Month E Cperator Training & License Exsa 5-Reduction 5 F-Administrative 9-Other Exhibit H-Same Source.
G Operational Error (Emplain)
N-Other (Explain)
_ . . . - _ - . . _ _ _ . .