ML20058K254
| ML20058K254 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 12/06/1993 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | J. J. Barton GENERAL PUBLIC UTILITIES CORP. |
| References | |
| NUDOCS 9312150018 | |
| Download: ML20058K254 (3) | |
Text
.*
November 6, 1993 (Corrected date is December 6,1993)
Docket No. 50-219 t
Mr. John J. Barton Vice President and Director GPU Nuclear Corporation Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731
Dear Mr. Barton:
SUBJECT:
REACTOR BUILDING CRANE - OYSTER CREEK NUCLEAR GENERATING STATION At the meeting held on November 19, 1993, with GPU Nuclear Corporation (GPUM) regarding Independent Spent Fuel Storage Installation and the Oyster Creek Reactor Building Crane, the staff expressed concern that GPUN would not be complying with heavy loads criteria specified in NUREG-0612 " Control of Heavy Loads at Nuclear Power Plants." The criteria require the licensee either to utilize a single failure proof crane in such movement or to assume a cask drop and to analyze the effects upon safe shutdown equipment on spent fuel in accordance with Section 5.1, " Recommended Guidelines" of NUREG-0612.
At the meeting you stated that per Generic Letter 85-11, NRC approval of your planned actions was not required and that you plan to perform a 10 CFR 50.59 review and not 5.ropose to use an installation of a single failure crane.
We plan to audit your 10 CFR 50.59 evaluation before movement of any fuel in the new dry storage casks.
Sincerely, Original signed by John F. Stolz, Director Project Directorate I-4 qL g q p' A 0 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc:
See next page DISTRIBUTION:
Docket File NRC & Local PDRs PDI-4 Plant SVarga JCalvo SNorris ADromerick OGC ACRS (10)
CMcCracken JRogge, RGI bb n kY Dik Do$ o$o$0h19 C
P pon OFFICE LA:PDI-4 PM PDJ A Dh-4 SN W Ahokr k:bf JStob wt DHE LR/(,/93
[g/t/93 d./cb/93
/ /
//
l O OfflCIAL RICORD COPY l hq Document Name: G:\\DROMERIC\\ CRANE.0YS y'
l e ntc 0
UNITED STATES f.
['
j NUCLEAR REGULATORY COMMISSION
^
WASHINGTON, D C. 20666-0001
.o' November 6, 1993 (Corrected date is December 6,1993)
Docket No. 50-219 Mr. John J. Barton Vice President and Director GPU Nuclear Corporation Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731
Dear Mr. Barton:
SUBJECT:
REACTOR BUILDING CRANE - OYSTER CREEK NUCLEAR GENERATING STATION At the meeting held on November 19, 1993, with GPU Nuclear Corporation (GPUN) regarding Independent Spent Fuel Storage Installation and the Oyster Creek Reactor Building Crane, the staff expressed concern that GPUN would not be complying with heavy loads criteria specified in NUREG-0612 " Control of Heavy Loads at Nuclear Power Plants." The criteria require the licensee either to utilize a single failure proof crane in such movement or to assume a cask drop and to analyze the effects upon safe shutdown equipment on spent fuel in accordance with Section 5.1, " Recommended Guidelines" of NUREG-0612.
At the meeting you stated that per Generic Letter 85-11, NRC approval of your planned actions was not required and that you plan to perform a 10 CFR 50.59 review and not propese to use an installation of a single failure crane.
We plan to audit your 10 CFR 50.59 evaluation before movement of any fuel in the new dry storage casks.
Sincerely, pL Joh F. Stolz, irector Pr ject Directorate I-vision of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc: See next page i
i i
i l
i k
a Mr. John J. Barton Oyster Creek Nuclear Generating Station cc:
Ernest L. Blake, Jr., Esquire Resident Inspector Shaw, Pittman, Potts & Trowbridge c/o U.S. Netlear Regulatory Commission 2300 N Street, NW.
Post Office Box 445 Washington, DC 20037 Forked River, New Jersey 08731 j
Regional Administrator, Region I Kent Tosch, Chief U.S. Nuclear Regulatory Commission New Jersey Department of 475 Allendale Road Environmental Protection King of Prussia, Pennsylvania 19406 Bureau of Nuclear Engineering CN 415 BWR Licensing Manager Trenton, New Jersey 08625 GPU Nuclear Corporation 1 Upper Pond Road Parsippany, New Jersey 07054 Mayor Lacey Township 818 West Lacey Road Forked River, New Jersey 08731 i
Licensing Manager Oyster Creek Nuclear Generating Station Mail Stop:
Site Emergency Bldg.
Post Office Box 388 forked River, New Jersey 08731 i
l 4
i