ML20058J249
| ML20058J249 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 11/30/1993 |
| From: | Peebles T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Richard Anderson CAROLINA POWER & LIGHT CO. |
| References | |
| NUDOCS 9312140021 | |
| Download: ML20058J249 (4) | |
Text
-
y,.,
NOV 3 01993 Carolina Power and Light Company ATTN: Mr. R. A. Anderson Vice President Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461 Gentlemen:
SUBJECT:
REACTOR OPERATOR AND SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS EXAMINATION REPORT NO. 50-324/94-300 In a telephone conversation between Mr. Mike Williams, Acting Operations Training Supervisor, and Mr. D. Charles Payne, License Examiner, NRC Region II Operator Licensing Section, arrangements were made for the administration of licensing examinations at the Brunswick Steam Electric Plant.
The examination preparation visit is scheduled for January 10, 1994. The written examinations are scheduled for January 24, 1994, and the operating examinations are scheduled for January 25-28, 1994. Your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in Revision 7 of NUREG-1021, " Operator Licensing Examiner Standards," (ES-201, Attachment 4) during the week of January 10, 1994.
In order to prepare the examinations and meet the above schedule, your staff has already furnished the reference materials listed in Attachment 2 of ES-201.
The NRC will p epare and administer the written examinations in accordance with ES-401 and ES-402 of NUREG-1021.
In order to conduct the requested examinations, it will be necessary for your staff to provide adequate space and accommodations on the date noted above. The NRC's guidelines for administering the written examinations are described in ES-402, Attachment 1.
The NRC w',11 prepare and administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021.
Ir order to conduct the requested operating tests, it will be necessary for your staff to make the simulation facility i
available on the dates noted above.
Your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
130017 ES-402, Attachment 2, and ES-302, Attachment 1, contain a number of NRC policies and guidelines that will be in effect while the written examination and operating tests are being administered.
Your staff should submit preliminary reactor operator and senior reactor-operator license applications and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications and the medical certifications and evaluate any requested waivers.
If the applications are not received at least 30 days before the examination date, a postponement may be necessary.
Final, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
9312140021 931130
\\k PDR ADOCK 05000324 S
NOV 3 0 9 93 Carolina Power & Light Co.
2 This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires October 31, 1995. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing, and mailing the required material.
Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, MNBB-7714, Division of Information Support Services, Office of Information Resources Management, U. S. Nuclear Regulatory Commission, Washington, D. C.
20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NE08-3019, Office of Management and Budget, Washington, D. C. 20503.
Thank you for your cooperation in this matter.
Mr. Williams has been advised of the policies and guidelines referenced in this letter.
If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Lawrence L. Lawyer, Chief, Operator Licensing Section, at (404) 331-4700, or myself at (404) 331-5541.
Sincerely, (Original signed by L. Lawyer for)
Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety cc:
H. W. Habermeyer, Jr.
Vice President Nuclear Services Department i
Carolina Power & Light Company P. O. Box 1551
- Mail OHS 7 Raleigh, NC 27602 i
J. P. Cowan Plant Manager Unit 1 Brunswick Steam Electric Plant i
P. O. Box 10429 i
Southport, NC 28461 i
C. C. Warren Plant Manager Unit 2 Brunswick Steam Electric Plant P. O. Box 10429 i
Southport, NC 28461 Mark S. Calvert Associate General Counsel Brunswick Steam Electric Plant i
P. O. Box 10429 Southport, NC 28461 cc cont'd:
(See page 3)
E Carolina Power & Light Co.
3 cc cont'd:
Kelly Holden, Chairman Board of Commissioners P. O. Box 249 Bolivia, NC 28422 Dayne H. Brown, Director Division of Radiation Protection N. C. Department of Environment, i
Commerce & Natural Resources P. O. Box 27687 Raleigh, NC 27611-7687
)
Karen E. Long Assistant Attorney General State of North Carolina P. O. Box 629 4
Raleigh, NC 27602 i
Robert P. Gruber Executive Director Public Staff - NCUC P. O. Box 29520 Raleigh, NC 27626-0520 Public Service Commission State of South Carolina P. O. Box 11649 Columbia, SC 29211 Mayor City of Wilmington i
City Hall l
P. O. Box 1810 Wilmington, NC 28402
{
-i Mr. Denny Hicks l
Training Manager Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461 1
i 4
$~
b t
t i
Carolina Power & Light Co.
4 bcc: P. Milano, NRR f
H. Christensen, DRP A. Gibson, DRS J. Jaudon, DRS G. Hallstrom, DRS C. Payne, DRS j
NRC Resident Inspector U.S. Nuclear Regulatory Commission Star Route 1, Box 208
[
Southport, NC 28461 i
Document Control Desk f
-t I
i l
i i
l i
l l
RII S
Payne:cd/sd Llawyer
/,TPebbles ll/tT/93 1/g/93 11/g/93 1
Document Name: G:\\LA\\BRU\\l30090DA.DCP
,j
.