Confirms That License Renewal Review Team Will Visit Richland Mfg Plant on 931214-16 to Familiarize Team W/ Facility & Discuss Issues Re Renewal.Agenda Encl
ML20058H595
Person / Time
Site: Framatome ANP Richland
Issue date: 12/08/1993
From: Adams M
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Maas L
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
References
TAC-L21656, NUDOCS 9312130142
Download: ML20058H595 (4)


Text

!

pa etc

,., q

[t UNITED STATES j.. T' j

NUCLEAR REGULATORY COMMISSION

' s WASHINGTON, D.C. 20555-0001 E

\\ ^v

,p DEC 8 1993

?

i Docket 70-1257 License SNM-1227 Mr. L. J. Maas, Manager Regulatory Compliance Siemens Power Corporation 2101 Horn Rapids Road Richland, Washington 99352-0130

Dear Mr. Maas:

SUBJECT:

AGENDA FOR SITE VISIT, DECEMBER 14-16, 1993 (TAC NO. L21656)

This letter is to confirm that the license renewal review team will visit the Richland manufacturing plant on December 14-16, 1993 (agenda enclosed).

The purpose of the visit is to familiarize the review team with the facility and to discuss issues concerning the license renewal.

We expect to discuss the following specific topics:

chemical safety, fire protection, environmental protection, radiation protection, and nuclear criticality safety. We request that the individuals on your staff who are responsible for these areas be available to participate in discussions scheduled for Tuesday afternoon and Wednesday morning. We anticipate completing the discussions for all of these topics, except chemical safety, on December 14-15. 1993.

The chemical safety discussion is expected to take one additional day, December 16, 1993.

Participants will include Nuclear Regulatory Commission staff and contractors from Science Applications International Corporation (SAIC).

SAIC has been contracted to assist in the review of the renewal application and preparation of the Environmental Assessment and Safety Evaluation Report for the license renewal. We are aware that the license renewal application contains I

proprietary information; NRC's contract with SAIC includes a contractor commitment to handle the proprietary information in accordance with NRC requirements.

In addition, Dr. Michael Tokar and I have scheduled a meeting with the State j

of Washington's Department of Ecology and Department of Health in the Department of Ecology's Kennewick office on Thursday morning, December 16, 1993. The purpose of the meeting is to discuss (1) the scope and general i

conditions of your Part 70 license, (2) the State's plans for the Dangerous Waste Permit and (3) renewal of your State-issued source material license, in order to avoid issuing conflicting or duplicative license and permit conditions.

nonOQR g

9312130142 931208 PDR ADOCK 07001257 l

C PDR I<

i l

DEC S 1993 i

Mr. L. J. Maas 2

We appreciate your accommodation of our staff at this site visit.

If you have any questions, please contact me at 301-504-2505.

Sincerely, UT@tif)$lg0cdBy-Mary Thoma Adams Licensing Section 2 Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Fnclosure:

Agenda cc:

SAIC i

DISTRIBUTION w/encls.

(Control No. 1805)

Docket No. 70-1257 PDR NRC File Center HMSS R/F FCLB R/F Region V CHooker, RV FCSS R/F Ft.LS2 R/F 0FC FCLB h

FCLif b

FCLB b

MAdamffN

\\5tlharpe MTok'aM [

NAME DATE 12/8/93 12/1/93 12/[/93 C = COVER E = COVER & ENCLOSURE N = NO COPY

[G:\\agendal2.spc]

F i

4 l

Enclosure AGENDA FOR SITE VISIT TO SIEMENS POWER CORPORATION DECEMBER 13-17, 1993

[

MONDAY. DEC 13 l

4:00 PM - 5:00 PM MEETING BETWEEN NRC AND SAIC AT BEST WESTERN TOWER INN 10 flNAll2E'C00RDINAT10N Of SITE VISIT TUE50AY. DEC 14 7:00 AM ARRIVE AT SITE 7:30-8:30 AM INTRODUCTIONS (NRC. sal, SPC staff) 8:30 AM -12:00 N PLANT TOUR

?

SPECIALTY FUELS BUILDING i

U0 BUILDING AND POWDER STORAGE ElbBUILDING PRODUCT DEVELOPMENT TEST FACILITY PACKAGED RAD MATERIAL WAREHOUSE-TEMPORARY STORAGE FACILITIES MATERIALS WAREHOUSE UNH DRUM STORAGE WAREHOUSE LAUNDRY FACILITY i

UF CYLINDER STORAGE AREAS (0LD AND NEW) 6 PACKAGED FUEL STORAGE AREAS 4

PACKAGED WASTE STORAGE AREAS PROCESS CHEMICAL WASTE STORAGE LAGOON SYSTEM RETENTION TANKS HIGH URANIUM SOLIDS POND SOLIDS TRENCH l

LAGOON URAN 1UM RECOVERY AMMONIA REC 0VERY FACILITY LAGOON 5A 10N EXCHANGE PROCESS (ARF BUILDING) 12:00-12:45 LUNCH W

l

- = >. -. ~

a 2

]

12:45 PM-5:00 PM DISCUSSIONS ON SPECIFIC TOPICS:

  • Swain, **Tanaka)

)

ENVIRONMENTAL PROTECTION (Adams,,,Burklin)

RADIATION PROTECTION (Lamastra,

'i FIRE PROTECTION ( Storey, Probasco) l 0,HEMICAL SAFETY (Milstein, Troskoski, *McKnight, *Le, 77%

NU i.i R CRITICALITY (Tokar, Klasky, *Beary,'* Manning)

]

WEDNESDAY DEC. H 7:00 AM-12:00 N CONTINVATION OF DISCUSSIONS ON SPECIFIC TOPICS 12:00-12:45 PM LUNCH l

12:45 PM-2:00 PM FINDINGS AND RESOLUTION OF LICENSE RENEWAL ISSUES (NRC, SAIC) e 2:00 PM - 5:00 PM FINDINGS AND NRC SCHEDULES FOR LICENSE RENEWAL (NRC, SAIC, SPC)

DISCUSSION OF GSUR MODIFICATIONS AMENDMENT k

THURSDAY. DEC. 16 8:00 AM - 11:00 AM M. TOKAR, M. ADAMS MEET WITH STATE OF WASHINGTON STAFF RE LICENSE COORDINATION ISSUES 7:00 AM - 5:00 PM CONTINUE CHEMICAL SAFETY DISCUSSIONS (NRC, SAIC, SPC) 2 I

i

)

E b

SAIC STAFF

i 4

,- ~.

--7

.-_r m.

~m

...._,..s-