ML20058H302

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Brunswick Unit 2,Cycle 9 Core Operating Limits Rept. Rev Issued to Implement Change to Rod Block Monitor Sys Setpoints
ML20058H302
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 11/08/1990
From: Loflin L
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20058H306 List:
References
NLS-90-229, NUDOCS 9011150167
Download: ML20058H302 (1)


Text

-

Caroline Power & Light Company 140V'081990 l

SERIAL: NLS 90 229 United States Nuclear Regulatory Commission ATTENTION: Document Control' Desk i

Washington, DC 20$$$

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50 324/ LICENSE NO. DPR 62 TRANSMITTAL OF MID. CYCLE CORE OPERATING LIMITS REPORT Centlemen:

In accordance with Technical Specification 6.9.3.4 for the Brunswick Steam Electric Plant, Unit 2, Carolina Power & Light Company, herewith submits a copy-of the Core Operating Limits Report, Revision.1,-November 1990 for Brunswick j

Unit 2, Cycle 9.

This revision to the Core Operating Limit s Report is being i

issued to implement a change to the Rod Llock Monitor System setpoints.

Please refer any questions regarding this submittal to Mr. W. R. Murray at l

(919) 546 4661.

Yours very truly,

/l).k.' h&

0 L/L Leonard I. Loflin

[

Manager' Nuclear Licensing Section WRM/wrm

.(\\cor\\colrb2c9)

Enclosure cc:

Mr. S. D. Ebneter Mr. N, B. Le Mr. R. L. Prevatte I

t i

i 9011150167 901108 PDR ADOCK 05000324 P

PDC i

411 rey.n.wne street. p, o. 8041$51

  • Raleign. N. C. 27602 400/

-t v 0

.///{

y-

,