ML20058H302
| ML20058H302 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 11/08/1990 |
| From: | Loflin L CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20058H306 | List: |
| References | |
| NLS-90-229, NUDOCS 9011150167 | |
| Download: ML20058H302 (1) | |
Text
-
Caroline Power & Light Company 140V'081990 l
SERIAL: NLS 90 229 United States Nuclear Regulatory Commission ATTENTION: Document Control' Desk i
Washington, DC 20$$$
BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50 324/ LICENSE NO. DPR 62 TRANSMITTAL OF MID. CYCLE CORE OPERATING LIMITS REPORT Centlemen:
In accordance with Technical Specification 6.9.3.4 for the Brunswick Steam Electric Plant, Unit 2, Carolina Power & Light Company, herewith submits a copy-of the Core Operating Limits Report, Revision.1,-November 1990 for Brunswick j
Unit 2, Cycle 9.
This revision to the Core Operating Limit s Report is being i
issued to implement a change to the Rod Llock Monitor System setpoints.
Please refer any questions regarding this submittal to Mr. W. R. Murray at l
(919) 546 4661.
Yours very truly,
/l).k.' h&
0 L/L Leonard I. Loflin
[
Manager' Nuclear Licensing Section WRM/wrm
.(\\cor\\colrb2c9)
Enclosure cc:
Mr. S. D. Ebneter Mr. N, B. Le Mr. R. L. Prevatte I
t i
i 9011150167 901108 PDR ADOCK 05000324 P
PDC i
411 rey.n.wne street. p, o. 8041$51
- Raleign. N. C. 27602 400/
-t v 0
.///{
y-
,