ML20058H092
| ML20058H092 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/31/1990 |
| From: | Neron G, Scace S NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| MP-90-1195, NUDOCS 9011140244 | |
| Download: ML20058H092 (5) | |
Text
-
secsmaast urn. mas L
2m 1
.uu.
-,,,,ui c w.
.40Lvost **1ER *0Wrf# COW *W
{
880A,*E4$1 t/get(3 g,negg (rnemsg
-y
,,,_m __ ___ _ - (Q~) _
November 7, 1990e MP-90-1195 Re: '.'10CFR50'. 71(a)
U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Reference:
Facility Operating License No. DPR-65 Docket No. 50 336
Dear Sir:
This letter is forwarded to provide the report of-operating and shutdown experience relating 'to Millstone Unit 2.for the month of October,1990,. in
accordance with Appendix A Technical Specifications, Section 6.9.1;6.
One additional copy of the report is enclosed.
Very truly.yourr, c
' NORTHEAST NUCLEAR ENERGYKCOMPANY:
l CW
/ Step E.
cace Station Directar
-l Millstone Nuclear-Power Station-1 SES/GN cc: T. T. Martin, Region I Administrator G. S. Vissing, NRC Project Manager, Millstone. Unit No.- 2.
W. J. Raymond, Senior-Resident Inspector,; Millstone Unit Nos. 1.-2-6 3
)
c $g ['
O j
a PDC l
\\
o
- 11 0:
3 4
oS70 REV.7-85 em
~,
n';;
3 ; {l;.
=.;_
~i l-t-
a.
3
-m.
4 t
l OPERATING DATA REPORT DOCKET NO, 50 336' DATE 11/08/90 i
COMPLETED BY G. Neron TELEPHONE'._f203) 447-1791 EXT.
4417 i
OPERATING STATUS Notes: Items-21'and 22 1.
Unit Name:
Millstone Unit 2 cumulative-are weighted 2.
Reportin6 Period:
cetober 1990 averages.1 Unit operated.
l
'3. Licensed Thormal Power (MWt):
2700' at 2560 MWTH= prior to its 3
4, Nameplate Rating (Gross MWe);
909 uprating toithe current 5.
Design Electrical Rating (Net MWe):
870
.2700 MWTH power: level.
6, Maximum Dependable Capacity (Gross MJe):
893.88-7.
Maximum Dependable Capacity (Net MWe):
862.88-8.
-If Changes occur in capacity Ratings (Items Number 31Through 7)'Since' Last-Report,.
Give Reasons:
,i N/A
?
^{
9.
Power Level To Which Restricted,'If anyf(Net MWe):
N/A'
- 10. Rec. sons For Restrictions, If Any:
N/A
'umulative This Month Yri-To Date-C
- 11. Hours In Reporting Period 745.0 7296.0 130176.0 l
- 12. Number Of. Hours Reactor Was Critical 0.0 5246'.4' 95607.5
- 13. Reactor Reserve Shutdown Hours-0.0-0.0_
2205.5
- 14. Hours. Generator On Line
-0.0.
5201.4 91152.8 l
15, Unit Reserve Shutdown Hours 0.0' O.0 468 2 3
16, Gross Thermal Energy Generated (MWH) 0.0 13881399.0 252017237.4
'17. - Gross Electrical' Energy Generated- (MWH)
_(-2763.0)'
4335420.5 73332054.5 0.0 4509124.5 76428294.5
- 18. Not Electrical Energy Generated (MWH).
- 19. Unit Service Factor 0.0 71.3 70.0 i
- 20. Unit Availability Factor 0.0 71.3-70.4 21 Unit Capacity Factor (Using MDC Net) 0.0 68.9-66.2 122. Unit Capacity Factor (Using DER Net) 0.0 68.3 64.9
.=
23, Unit Forced Outage Rate 0.0L 2.1~
13.3
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and buration of Each):
Unit is currentiv in the vrocess of startuo from the EOC 10 refuel'outare.
i i
{
l f25. If Unit Shutdown At End Of Report-Period, Estimated Date of Startup: November 9. 1990 L
~26. Units'In Test Status (Prior to Commercial Operation):
l Forecart Achieved INITIAL ~ CRITICALITY N/A N/A INITIAL ELECTRICITY.-
N/A
-N/A' COMMERCIAL OPERATION N/A N/A
.l
.W i
1 m.1~
"i
.)
AVERACE DAILY cNIT POWER LEVEL DOCKET.NO.
50-336 UNIT:
Millstone Unit 2 DATE:
11/08/90 COMPLETED BY G. Neron j
TELEPHONE:
(203)447-1791 EXT:
4417' MONTH:
OCTOBER 1990 DAY AVG. DAILY POWER LEVEL DAY AVC..' DAILY POWER LEVEL (MWe-Net)
(MWe Net)
,j 1
1 0
17 0
1 2
0 18
-O 3
0 19' O
4 0-20 0
5 0
1 21 0
6 0 0 7
0 23 0-8 0-
- 24'
-0 l
9 0
25 0
10 0
26 0
1 11 0
27 0'
I 12 0
28 0
,. >}
13 0
29 0"
4.I 14 0
30 0'
15 0
. 31
,o l
1 16 0
- j INSTRUCTIONS 11 On this format, list the average daily unit. power level in'MWe Net for'each i
day.in the reporting month.
Compute. toe the nearest whole megawatt.
4.
.i g,
.}
')
i a;
4 c
' sc
9 DOCKET NO.
50-336 UNIT SHUTDCCNS AND POWEk REDUCTIONS UNIT NAME Millstone 2
~'
DATE 11/08/90 COMPLETED BY G. Neron TELEPHONE (203) 447-1791-REPORT MONTil OCTOBER 1990 EXT.
4417 l
2 Cause & Corrective No.
Date Type Duration Reason Method of License Systgm Compgnent (fiours)
Shutting-Event Code Code Action to 3
Down-Reactor Report #
Prevent Recurrence
-05 901014 S
745.0-C 1
N/A N/A N/A Continuation of refuel and maintenance outage from previous month.
2 3
U 1: ~ Forced Reason'.
Method Exhibit G - Instructions.
F S: Scheduled.
A-Eculpment. Failure (Explain) 1-Manual for Preparation of Data B-riaintenance or. Test-2-Manual Scram.
Entry. Sheets for License-C-Refueling 3-Automatic Scram 1 Event Report (LER) File; 4-Continued from-(NUREG-0161). '
D-Regulatory Restriction-Previous month' E-Operator. Training & License Examination 5 Exhibit 1.-Same Source..
F-Administrative 5-Power Reduction G-Operational Error (Explain)
(Duration -0) 11 Other (Explain) 6-Other (Explain)'
A, m
-... -.-~~
-e-
..-_.c_---__..-.--
-u-
~
d
t REFUELING INFORMATION REOUEST-1.
Name of facility:
Millstone 2 2.
Scheduled date for.next refueling shutdown:
March, 1992 3.
Scheduled date for restart following refueling:-
Current 1v in Drocess of startup_from End Of Cycle 10 refuel outaae 4.
Will refueling or resumption of operation thereafter require a-technical specification change or_other. license-amendment?
None at this time 5.
Scheduled date(s):for submitting licensing action and supporting information:.
None _it this time Important licensing considerations associated with refueling 6.
new or different fuel design or supplier, unreviewed design o, e.g.,
r performance analysis methods, significant changes in fuel. design, new operating proceoures:
None 7.
The number of fuel assemblies (a) in the core and=(b) in the spent fuel storage pool:
In Core:
(a)
LUl In Spent Fuel Pool:
(b), Ill.
NOTE: "hese numbers represent the total = fuel assemblies and-consol-ndated fugl storace boxes in these two (2) Item Control Areas 8.
The prosent licensed spent fuel pool storage capacity and the size of any increase in-licensed storage capacity that has been requested or is planned, in number of, fuel assemblies:
Currently 1277 The projected date of the last refueling that can be discharged to -
. j 9.
the spent fuel pool assuming the present licensed capacity:
1994. Soent Fue:
Pool Full, core off load cacacity is reached (with
-out consolidation).
1998. Core Full. Soent Fuel Pool Full 1009. Soent Fuel Pool Full, core off load capacity is reached-contincent uDon-full scale storace of consolidated fug.1 in the Soent Fuel Pool.
3
)