March 3, 2020 MEMORANDUM TO:
Victor E. Hall, Chief Vogtle Project Office Office of Nuclear Reactor Regulation FROM:
Jennivine Rankin, Project Manager /RA/
Vogtle Project Office Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF A PUBLIC MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY ON FEBRUARY 27, 2020 The U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with Southern Nuclear Operating Company (SNC) on February 27, 2020. The purpose of the meeting was to discuss SNCs request for an alternative regarding the inservice test interval code edition for Vogtle Electric Generating Plant (VEGP), Unit 4.
The meeting notice can be found in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML20010E841. The request for alternative and discussion topic can be found under ADAMS Accession Nos. ML19304C432 and ML20050D173, respectively. The meeting notice is also posted on the NRC public website.
Enclosures 1 and 2 are the meeting agenda and attendance list for the meeting, respectively.
CONTACT: Jennivine Rankin, NRR/VPO (301) 415-1530
V. Hall Summary of Meeting:
On February 27, 2020, staff from the NRC conducted a public meeting with representatives from SNC to discuss IST-ALT-01, which requests authorization to use an alternative to the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(f)(4)(i) and 10 CFR 50.55a(f)(4)(ii) regarding use of the latest edition and addenda of the American Society of Mechanical Engineers (ASME) Operation and Maintenance of Nuclear Power Plants Code (OM Code) for initial and successive inservice test intervals. The NRC noted it was considering authorizing the alternative for Unit 4 initial fuel load dates prior to January 1, 2022. This considered the alternative request which indicated the Unit 4 fuel loading would follow Unit 3 by approximately 1 year (a Unit 3 initial fuel load date of November 23, 2020, resulting in a Unit 4 initial fuel load date of November 23, 2021). SNC explained that January 1, 2022, may not provide the desired flexibility for unanticipated delays of a complex construction project. SNC proposed November 23, 2022, as the backstop date for the Unit 4 authorization. The NRC staff noted that November 23, 2022 was reasonable, but if Unit 4 was to be further delayed, the NRC staff expectation is that SNC would be required to update the initial inservice testing program interval for VEGP Unit 4 to comply with the requirements of the ASME OM Code incorporated by reference in 10 CFR 50.55a in accordance with the time period prior to initial fuel load specified in 10 CFR 50.55a.
At the conclusion of the presentation, there was an opportunity for the public to provide comments and ask questions. There were no comments or questions from the public.
Docket No.:
52-026
Enclosures:
As stated cc w/encls: See next page
- via e-mail NRC-001 OFFICE PM: NRR/VPO LA: NRR/VPO PM: NRR/VPO BC: NRR/VPO:BC NAME JRankin* (c)
RButler*
CSantos*
VHall*
DATE 3/2/2020 3/2/2020 3/2/2020 3/2/2020 OFFICE PM: NRR/VPO NAME JRankin (s)
DATE 3/3/2020
AGENDA FOR PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION (NRC)
Thursday, February 27, 2020 Teleconference 9:00 a.m. - 12:00 p.m.
PURPOSE:
To discuss issues associated with the safety review of licensing actions for Southern Nuclear Operating Companys (SNC) Vogtle Electric Generating Plant (VEGP) Units 3 and 4.
OPEN Time Topic Led By 9:00 a.m.
Opening Remarks NRC 9:10 a.m.
Discussion of Identified Topics NRC/SNC Opportunity for Public Comment Open Portion Concludes NRC/Public CLOSED 12:00 p.m.
(If needed)
Adjourn NRC/SNC
PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION Thursday, February 27, 2020 One White Flint North, Room O-11B4 9:00 a.m. - 12:00 p.m.
List of Attendees Name Organization Representing the Nuclear Regulatory Commission Jennie Rankin Tanny Santos Vic Hall NRR/VPO Nick Hansing Tom Scarbrough NRR/DEX Representing Industry Adam Quarles*
Stephanie Agee*
Chris Pendleton*
Amy Chamberlain*
Southern Nuclear Operating Company
- = participated via teleconference
Vogtle Mailing List (Revised 2/13/2020) cc:
Resident Manager Resident Inspector Oglethorpe Power Corporation Vogtle Plant Units 3 & 4 Alvin W. Vogtle Nuclear Plant 8805 River Road 7821 River Road Waynesboro, GA 30830 Waynesboro, GA 30830 Mr. Barty Simonton Office of the Attorney General Team Leader 40 Capitol Square, SW Environmental Radiation Program Atlanta, GA 30334 Air Protection Branch Environmental Protection Division Southern Nuclear Operating Company 4244 International Parkway, Suite 120 Document Control Coordinator Atlanta, GA 30354-3906 3535 Colonnade Parkway Birmingham, AL 35243 Brian H. Whitley Regulatory Affairs Director Anne F. Appleby Southern Nuclear Operating Company Olgethorpe Power Corporation 3535 Colonnade Parkway, BIN N-226-EC 2100 East Exchange Place Birmingham, AL 35243 Tucker, GA 30084 Mr. Michael Yox County Commissioner Site Regulatory Affairs Director Office of the County Commissioner Vogtle Units 3 & 4 Burke County Commission 7825 River Road, Building 302 (ESB)
Waynesboro, GA 30830 Bin 6031 Waynesboro, GA 30830 Mr. Wayne Guilfoyle Commissioner District 8 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3
Vogtle Mailing List Email aagibson@southernco.com (Amanda Gibson) acchambe@southernco.com (Amy Chamberlian) gam@nei.org (Gia Montserrat)
Lindsay@georgiawand.org (Lindsay Harper) bhwhitley@southernco.com (Brian Whitley)
Bill.Jacobs@gdsassociates.com (Bill Jacobs) corletmm@westinghouse.com (Michael M. Corletti) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dlfulton@southernco.com (Dale Fulton) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David)
G2NDRMDC@southernco.com (SNC Document Control)
George.Taylor@opc.com (George Taylor) harperzs@westinghouse.com (Zachary S. Harper) james1.beard@ge.com (James Beard)
JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)
John.Bozga@nrc.gov (John Bozga)
Joseph_Hegner@dom.com (Joseph Hegner) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy) kroberts@southernco.com (Kelli Roberts)
KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) markus.popa@hq.doe.gov (Markus Popa) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)
Melissa.Smith@Hq.Doe.Gov (Melissa Smith) mike.price@opc.com (M.W. Price)
MKWASHIN@southernco.com (MKWashington) mphumphr@southernco.com (Mark Humphrey)
MSF@nei.org (Marvin Fertel) nirsnet@nirs.org (Michael Mariotte)
Nuclaw@mindspring.com (Robert Temple)
Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) ppsena@southernco.com (Peter Sena,III) r.joshi15@comcast.net (Ravi Joshi) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett)
Michelle@cleanenergy.org (Michelle Powell)
Page 2 of 3
Vogtle Mailing List sblanton@balch.com (Stanford Blanton)
Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) sjones@psc.state.ga.us (Shemetha Jones) skauffman@mpr.com (Storm Kauffman) slieghty@southernco.com (Steve Leighty) sroetger@psc.state.ga.us (Steve Roetger) syagee@southernco.com (Stephanie Agee)
TomClements329@cs.com (Tom Clements)
Vanessa.quinn@dhs.gov (Vanessa Quinn) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver)
William.Birge@hq.doe.gov (William Birge)
X2edgran@southernco.com (Eddie R. Grant) x2gabeck@southernco.com (Gary Becker)
X2hagge@southern.com (Neil Haggerty)
X2wwill@southernco.com (Daniel Williamson)
Page 3 of 3