i APPENDIX A NOTICE OF VIOLATION Tennessee Valley Authority Docket No. 50-438 Bellefonte 1 License No. CPPR-122 As a result of the inspection conducted April 26-29, 1982, and in accordance with the NRC Enforcement Policy, 47 FR 9987 (March 9,1982), the following violation was identified.
10 CFR 50, Appendix B, Criterion V, as implemented by FSAR Section 17.A1.5, requires that activities affecting quality be prescribed and accomplished in accordance with documented procedures or instructions. Bellefonte pro-cedure QCP 6.16RO requires that openings on piping materials and equipment be sealed or capped to maintain cleanliness.
Contrary to the above, piping installed in the core flooding system was not adequately sealed or capped to assure maintenance' of cleanliness in that, on April 27, 1982, the valve adjacent to weld 1NL0005 in the core flooding system was open and dirt and debris had entered the system piping through the opening.
r This is a Severity Level IV Violation (Supplement I1.0).
Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within thirty days of the date of this Notice, a written statement or 1
explanation in reply, including: (1) admission or denial of the alleged viola-tion; (2) the reasons for the violation if admitted; (3) the corrective steps which have been-taken and the results achieved; (4) corrective steps which will be taken to avoid further violations: and (5) the date when full compliance will i
be achieved. Consideration may be given to extending your response-time for good -
cause shown.