Enclocura 2 r.
BEFUELING OPERATIONS 3/4.9.6 REFUELING PLATFORM LIMITING CONDITION FOR OPERATION 3.9.6 The refueling platform shall be OPERABLE and used for handling fuel '
assemblies or control rods within the reactor pressure vessel.
APPLICABILITY:
During handling of fuel assemblies or control rods within the reactor pressure vessel.
ACTION:
With the requirements for refueling platform OPERABILITY not satisfied, suspend use of any inoperable refueling platform equipment from operations involving the handling of control. rods and fuel assemblies within the reactor pressure vessel-after placing the load in a safe condition.
SURVEILLANCE REOUIREMENTS 4.9.6 Each refueling platform ~ crane or hoist used for handling of control rods or fuel assemblies within.the reactor pressure vessel shall be demonstrated OPERABLE within 7 days prior to the start of such operations with that crane or hoist by:
a.
Demonstrating operation of the overload cutoff on the main hoist when the load exceeds (1200 1 50) pounds.
b.
Demonstrating operation of the overload cutoff on the frame mounted and monorai) hoists when the load exceeds (500
- 50) pounds.
c.
Demonstrating operation of the uptravel mechanical stop on the frame mounted and monorail hoists when uptravel brings the top of (active) fuel assembly to (8) feet below the (normal fuel storage pool) water level.
d.
Demonstrating operation of.the downtravel mechanical cutoff on the main hoist when grapple hook down travel reaches (4) inches below fuel assembly handle.
e.
Demonstrating operation of the slack cable cutoff dn the main hoist when the load is less than-(50 i 10) pounds.
f.
Demonstrating operation of the loaded interlock on the main hoist when the load exceeds (485
- 50) pounds.
g.
Demonstrating operation of the redundant loaded interlock on the main hoist when the load exceeds (550 i 50) pounds.
GE-STS (BWR/4) 3/4 9-8 8208030237 820728
~
PDR ADOCK 05000409 P
~
- REFUELING OPERATIONS 3/4.9.7 CRANE TRAVEL-SPENT FUEL STORAGE POOL.
LIMITING CONDITION FOR OPERATION 3.9.7 Loads in excess of-(1100) pounds shall be prohibited from travel over fuel assemblies in.the spent fuel storage pool racks.-
APPLICABILITY:
With fuel assemblies in the spent fuel storage pool racks.
ACTION:
With the requirements of the above specification not satisfied, place the' crane load in a safe condition.
The provisions of Specification 3.0.3 are not applicable.
~
SURVEILLANCE RE0VIREMENTS 4.9.7 Crane interlocks and physical stops which prevent crane travel with loads in excess of (1100) pounds over fuel assemblies in the spent fuel storage pool l
racks'shall be demonstrated OPERABLE within 7 days prior to and at least once per 7 days during crane operation.
e e
O 4
e
=c 9
GE-STS (BWR/4) 3/4 9-9 9
-_-_---_----_-__-___-.____--_-_-_n_-__-_.___-_-__-__--
JUL 2 9 E82 Mr. Frank Linder CC I
Frit'z Schubert, Esquire U. S. Environmental Protection Staff Attorney Agency Dairyland Power Cooperative Federal Activities Branch 2615 East Avenue South Region V Office La Crosse, Wisconsin 54601 ATTN:
Regional Radiation Representative 230 South Dearborn Street O. S. Heistand, Jr., Esquire Chicago, Illinois 60604 Morgan, Lewis & Bockius 1800 M Street, N. W.
Mr. John H. Buck Washi'gton, D. C.
20036 Atomic Safety and Licensing Appeal Board n
U. S. Nuclear Regulatory Commission Mr. R. E. Shimshak Washington, D. C.
20555 La Crosse Boiling Water React'or Dairyland Power Cooperative Mr. Ralph S. Decker P. O. Box 275 Route 4, Box 1900 Genoa, Wisconsin 54632 Cambridge, Maryland 21613 Mr. George R. Nygaard Charles Bechhoefer, Esq., Chairman Coulee Region Energy Coalition Atomic Safety and Licensing Board 2307 East Avenue U. S. Nuclear Regulatory Commission La Crosse, Wisconsin 54601 W::hington, D. C.
20555 Dr. Lawrence R. Quarles Dr. George C. Anderson Kendal at Longwood, Apt. 51 Department of Oceanography Kenneth Square, Pennsylvania 19348 University of Washington Seattle, Washington 98195
.U. S. Nuclear Regulatory Commission Resident Inspectors Office James G. Keppler, Regional Administrator Rural Route #1, Box 276 Nuclear Regulatory Commission, Region III Genoa, Wisconsin 54632 799 Roosevelt Road Glen Ellyn, Illinois 60137 Town Chairman Thomas S. Moore Town of Genoa Atomic Safety and Licensing Appeal Board Route 1 U. S. Nuclear Regulatory Commission Genoa, Wisconsin 54632 Washington, D. C.
20555 Chairman, Public Service Commission of Wisconsin Hill Farms State Office Building Madison, Wisconsin 53702 Alan S. Rosenthal, Esq., Chairman Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Commission Washington, D. C.
20555 e
...