ML20058F756
| ML20058F756 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 11/16/1993 |
| From: | Larry Nicholson Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20058F760 | List: |
| References | |
| NUDOCS 9312080271 | |
| Download: ML20058F756 (9) | |
Text
.~
/k-UNITED STATES j.
M E
NUCLEAR REGULATORY COMMISSION
- kil/
5 WASHINGTON, D.C. 20%D001 as., v
....+
PHILADELPHIA ELECTRIC COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANf DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSI Amendment No. 181 License No. DPR 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Philadelphia Electric Company, et.
al. (the licensee) dated August 20, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR R
Chapter :.
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be c' onducted without endangering the health and safety of the public, and (ii) that such activities will be conducted
.l in compliance with the Comission's regulations; D.
The 1ssuance of this amendment will not be inimical to the comon defense and security or to the health or safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-44 is hereby amended to read as follows:
9312080271 931116 i
PDR ADOCK 05000277 P
, t (2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 181, are hereby incorporated in the license.
PEC0 shall operate the facility in accordance with the Technical Specifications.
i 3.
This license amendment is effective as of its date of issuance and shall be implemented within 90 days of issuance.
FOR THE NUCLEAR REGULAT,0RY COMMISSION 2)
Larry. Nicholson, Acting Director Project Directorate 1-2 Division of Reactor Projects - I/II l
Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical
{
Specifications i.
Date of Issuance:
November 16. 1993 i
I i
t t
'l i
I
f.
ATTACHMENT TO LICENSE AMENDMENT NO.181 FACILITY OPERATING LICENSE NO. DPR-44 l
DOCKET NO. 50-277 Replace the following page of the Appendix A Technical Specifications with the enclosed page. The revised areas are indicated by marginal lines.
Remove Insert 240f 240f 1
l 1
PBAPS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.14;A (Cont'd)
- c. Hose station valve c.
Turbine Building operability.and blockage d.
Circulating Water Pump check - once every 3 years.
Structure
- d. Hose hydrostatic test at a 6.
When a hose station serving pressure at least an area which contains 50 psig greater than equipment which is required the maximum pressure to be operable becomes available at that hose inoperable; establish a station but not less continuous fire watch than 150 psig, or replace equipped with portable with an appropriately fire suppression equip-tested hose. Testing ment within I hour frequency shall be annually and provide equivalent for hose stored outside, and protection to the area every 3 years for interior served by the inoperable hoses.
station from the operable hose station within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 6.
None 7.
Except as specified in 7.
The SGTS fire suppression 3.14.A.8 below, the spray system testing fire suppression spray system shall be performed as follows:
serving a Standby Gas Treatment System charcoal filter train
- a. Manual activation test every l
shall be operable when a train is 18 months.
required to be operable.
- b. Inspection of nozzles 8.
If the requirements of 3.14.A.7 and spray header-cannot be met, once every 18 months
- a. establish a fire watch patrol
- c. Header and nozzle air to inspect the area with flow test - once every inoperable fire suppression 3 years equipment at least once per shift.
- b. restore the system to an operable status within 14 days, or in lieu of any other i
report required by Specification 6.9.2 submit a Special Report to the Commission pursuant to Specification 6.9.3 within 31 days outlining the cause of the malfunction and the plans for restoring the system to an operable status. The SGTS may be considered operable for the purposes of Specification 3.7.B.
-240f-Amendment No. 29. 63, 69, 85.,
181
- i Ik UNITED STATES j
NUCLEAR REGULATORY COMMISSION j i
'f WAEHINGToN, D.C. 20555-0001 g...../
l s,
~
PHILADELPHIA ELECTRIC COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY l
DELMARVA POWER AND LIGHT COMPANY
.}
i ATLANTIC CITY ELECTRIC COMPANY l
DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 186 License No. DPR-56 1.
The Nuclear Regulatory Comission (the Comission) has found that:
l A.
The application for amendment by Philadelphia Electric Company, et.
al. (the licensee) dated August 20, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the l
Act), and the Comission's rules and regulations set forth in 10 CFR Chapter 1.
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the i
Comission-C.
There is reasonable assurance (1) that the activities authorized by h
this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations-D.
The issuance of this amendment will not be inimical to the comon.
defense and security or to the health or safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
i 1
2.
Accordingly, the license is amended by. changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-56 is hereby amended to read as follows:
1 i
I
I e '
(2) Technical Soecifications i
The Technical Specifications contained in Appendices A and B, as revised through Amendment No.186, are hereby incorporated in the license.
PECO shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 90 days of issuance.
FOR THE NUCLEAR REGULAT0dY COMMISSION
/ /
Q Larry. Nicholson, Acting Director Proje Directorate I-2 3
Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation.
Attachment:
Changes to the Technical Specifications Date of Issuance:
November 16. 1993 l
i
')
i
l ATTACHMENT TO LICENSE AMENDMENT NO.186 FACILITY OPERATING LICENSE NO. DPR-56 DOCKET NO. 50-278 l
Replace the following page of the Appendix A Technical Specifications with the enclosed page. The revised areas are indicated by marginal lines.
Remove Insert 240f 240f h
t I
l i
I I
Unit 3 PBAPS s
LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.14.A (Cont'd)
- c. Hose station valve c.
Turbine Building operability and blockage d.
Circulating Water Pump check - once every 3 years.
Structure
- d. Hose hydrostatic test at a 6.
When a hose station serving pressure at least an area which contains 50 psig greater than equipment which is required the maximum pressure to be operable becomes available at that hose inoperable; establish a station but not less continuous fire watch than 150 psig, or replace equipped with portable with an appropriately fire suppression equip-tested hose. Testing i
ment within I hour frequency shall be annually and provide equivalent for hose stored outside, and protection to the area every 3 years for interior served by the inoperable hoses.
station from the operable hose station within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 6.
None 7.
Except as specified in 7.
The SGTS fire suppression 3.14.A.8 below, the spray system testing fire suppression spray system shall be performed as follows:
serving a Standby Gas Treatment System charcoal filter train
- a. Manual activation test every shall be operable when a train is 18 months.
required to be operable.
1
- b. Inspection of nozzles 8.
If the requirements of 3.14.A.7 and spray header-cannot be met, once every 18 months
- a. establish a fire watch patrol
- c. Header and nozzle air to inspect the area with flow test - once every j
inoperable fire suppression 3 years equipment at least once per shift.
- b. restore the system to an operable status within 14 days, or in lieu of any other report required by Specification 6.9.2 submit a Special Report to the i
Commission pursuant to i
Specification 6.9.3 within 31 days outlining the cause of the malfunction and the plans for restoring the system to an operable status. The SGTS may be considered operable for the purposes of Specification 3.7.B.
-240f-Amendment No. 29. 62. 68. 84 186