ML20058F291

From kanterella
Jump to navigation Jump to search
Forwards IE Investigation Repts 50-498/82-02 & 50-499/82-02 on 820205-0319
ML20058F291
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/03/1982
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Oprea G
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20058F294 List:
References
NUDOCS 8207300386
Download: ML20058F291 (1)


See also: IR 05000498/1982002

Text

-

.

n

' O.J. . _

,-

$

fY

'

.

,

g s'

-

In Reply Refer To:

, Docket: 50-498/82-02

.

50-499/82-02

.

Houston Lighting and Power

ATTN:

.G. W. Oprea , Jr. .

Executive Vice President,

P. O. Box 1700

Houston, Texas 77001

-

Gentlemen:

This refers to the investigation conducted by Messrs. D. D. Driskill and

J. E. Gagliardo of our' staff during the period February 5, 8-12, 23, March 11

and-19, 1982 of activities authorized by NRC Construction Permit CPPR 128 and

129 for the South Texas Project, Units 1 and 2.

Areas examined during the-investigation and our findings are discussed.in the

enclosed report. Within these areas, the investigation consisted of selective

examination of records and interviews with personnel.

During the investigation, it was determined that two potential deficiencies

. had not been reported to-the NRC within 24 hcurs of their identification.

The failure to meet the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> reporting time requirements of 10 CFR Part 50.55(e) is a violation of NRC requirements, and will be the subject of a

Notice of Violation which will be sent to you under separat6 cover.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room. We understand that you will

conduct an expedited: review of this investigation and will notify us by

telephone when we will be able to release this report to the NRC Public

Document Room and the ASLB.

Should you have any questions concerning this investigation, we will be

pleased to discuss them with you.

Sincerely,.

/

t# A

(

'

8207300386 820603

G. L. Madsen, Chief

f)

gDRADOCK05000

Reactor Project Branch 1

V

Enclosure:

Appendix'- NRC Investigation Report'

50-498/82-02; 50-499/82-02

'

'

IES

$6

RPB #

DRRP&E

RA-R2

EHJohnson/bb

LMadsen

JGagl'i do

plTCo'

ns-

6/ 3 /82

6/J./82

6/3 /3

$ 6/ 3 j

-

1