ML20058F291
| ML20058F291 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 06/03/1982 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Oprea G HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20058F294 | List: |
| References | |
| NUDOCS 8207300386 | |
| Download: ML20058F291 (1) | |
See also: IR 05000498/1982002
Text
-
.
n
' O.J. . _
,-
$
fY
'
.
,
g s'
-
In Reply Refer To:
, Docket: 50-498/82-02
.
50-499/82-02
.
Houston Lighting and Power
ATTN:
.G. W. Oprea , Jr. .
Executive Vice President,
P. O. Box 1700
Houston, Texas 77001
-
Gentlemen:
This refers to the investigation conducted by Messrs. D. D. Driskill and
J. E. Gagliardo of our' staff during the period February 5, 8-12, 23, March 11
and-19, 1982 of activities authorized by NRC Construction Permit CPPR 128 and
129 for the South Texas Project, Units 1 and 2.
Areas examined during the-investigation and our findings are discussed.in the
enclosed report. Within these areas, the investigation consisted of selective
examination of records and interviews with personnel.
During the investigation, it was determined that two potential deficiencies
. had not been reported to-the NRC within 24 hcurs of their identification.
The failure to meet the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> reporting time requirements of 10 CFR Part 50.55(e) is a violation of NRC requirements, and will be the subject of a
Notice of Violation which will be sent to you under separat6 cover.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room. We understand that you will
conduct an expedited: review of this investigation and will notify us by
telephone when we will be able to release this report to the NRC Public
Document Room and the ASLB.
Should you have any questions concerning this investigation, we will be
pleased to discuss them with you.
Sincerely,.
/
t# A
(
'
8207300386 820603
G. L. Madsen, Chief
f)
gDRADOCK05000
Reactor Project Branch 1
V
Enclosure:
Appendix'- NRC Investigation Report'
50-498/82-02; 50-499/82-02
'
'
IES
$6
RPB #
DRRP&E
RA-R2
EHJohnson/bb
LMadsen
JGagl'i do
plTCo'
ns-
6/ 3 /82
6/J./82
6/3 /3
$ 6/ 3 j
-
1