ML20058F219
| ML20058F219 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 07/15/1982 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| Shared Package | |
| ML20058F222 | List: |
| References | |
| NUDOCS 8207300364 | |
| Download: ML20058F219 (2) | |
See also: IR 05000315/1982011
Text
..
..
.
- _ _ _ _ - - _ - _ _ _ _ _ _ - _ _ _ ~ _ _ _ _ _
. _ .
_ _ - .
.
v
'Jul 1 5 G82~
Docket No. 50-315
Docket No. 50-316
American Electric Power Service
Corporation
Indiana and Michigan Electric Company
ATTN:
Mr. John E. Dolan
Vice Chairman
Engineering
2 Broadway
New York, NY 10004
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. E. R. Swanson
and N. E. DuBry of this office on May 1 through June 15, 1982, of activities
at Donald C. Cook Nuclear Plant, Units 1 and 2, authorized by NRC Operating
Licenses No. DPR-58 and No. DPR-74 and to the discussion of our findings with
Mr. W. G. Smith, Jr. , and others of your staff during the course of and at
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy. of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to. file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been
[O[
8207300364 820715
PDR ADOCK 05000315
0
J
.
t
American Electric Powei
2
July 15, 1982
Service Corporation
delayed such that less than seven (7)' days are available for your review,
please notify this office'promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must.
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter, the enclosures,
and your response to this letter will be placed in the Public Document
Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
lf0ififnal signed by R.L. spessard"
R. L. Spessard, Director
Division of Project and
Resident Programs
Enclosure:
Inspection
Report No. 50-315/82-11(DPRP);
No. 50-316/82-11(DPRP)
cc w/ enc 1:
W. G. Smith, Jr., Plant Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Commission
II 5
RIII
RIf
Ni
k
Haye /jp
Knop
Sp s rd
7/8/82