Forwards IE Insp Repts 50-315/82-11 & 50-316/82-11 on 820501-0615 & Notice of Violation
ML20058F219
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/15/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML20058F222 List:
References
NUDOCS 8207300364
Download: ML20058F219 (2)


See also: IR 05000315/1982011

Text

..

..

.

- _ _ _ _ - - _ - _ _ _ _ _ _ - _ _ _ ~ _ _ _ _ _

. _ .

_ _ - .

.

v

'Jul 1 5 G82~

Docket No. 50-315

Docket No. 50-316

American Electric Power Service

Corporation

Indiana and Michigan Electric Company

ATTN:

Mr. John E. Dolan

Vice Chairman

Engineering

2 Broadway

New York, NY 10004

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. E. R. Swanson

and N. E. DuBry of this office on May 1 through June 15, 1982, of activities

at Donald C. Cook Nuclear Plant, Units 1 and 2, authorized by NRC Operating

Licenses No. DPR-58 and No. DPR-74 and to the discussion of our findings with

Mr. W. G. Smith, Jr. , and others of your staff during the course of and at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy. of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to. file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been

[O[

8207300364 820715

PDR ADOCK 05000315

0

PDR

J

.

t

American Electric Powei

2

July 15, 1982

Service Corporation

delayed such that less than seven (7)' days are available for your review,

please notify this office'promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must.

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter, the enclosures,

and your response to this letter will be placed in the Public Document

Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

lf0ififnal signed by R.L. spessard"

R. L. Spessard, Director

Division of Project and

Resident Programs

Enclosure:

Inspection

Report No. 50-315/82-11(DPRP);

No. 50-316/82-11(DPRP)

cc w/ enc 1:

W. G. Smith, Jr., Plant Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

II 5

RIII

RIf

Ni

k

Haye /jp

Knop

Sp s rd

7/8/82