Informs That NRR in Process of Publishing Rule Re Protection Against Malevolent Use of Vehicles at Npp.Safeguards Info Withheld
ML20058F079
Person / Time
Site: Pilgrim
Issue date: 11/16/1993
From: Callan L
Office of Nuclear Reactor Regulation
To: Boulette E
BOSTON EDISON CO.
References
NUDOCS 9312070312
Download: ML20058F079 (4)


Text

.

y,,


3

.~

. :x.

  • g*.%

t UNITED STATES i,.'fg1lfj NUCLEAR REGULATORY COMMISSION 1 Ir 4 /!

WASHINGTON. D.C. 20556-0001

%gv4/

NOV 161933

....+

Docket No. 50-293 Mr. E. Thomas Boulette, Ph.D Senior Vice President - Nuclear Boston Edison Company Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road Plymouth, Massachusetts 02360

Dear Mr. Boulette:

SUBJECT:

PROPOSED RULE FOR PROTECTION AGAINST MALEVOLENT USE OF VEHICLES AT NUCLEAR POWER PLANTS - PILGRIM NUCLEAR POWER STATION On November 4,1993, the Commission published in the Federal Reaister (58 FR 58804 to 58807) proposed amendments to 10 CFR Part 73 that would modify the design basis threat for radiological sabotage to include use of a land vehicle by adversaries. The Federal Reoister notice refers to a draft regulatory guide prepared by the staff that contains preliminary information for licensees on initial assessments of protective measures against vehicle intrusions and approaches to-assess whether the Commission's design goals and criteria are met by measures taken to protect against vehicle intrusion. The Commission's Office of Nuclear Regulatory Research is in the process of publishing this proposed guide.

A preliminary version of the draft guide was included as Enclosure 8 to SECY-93-270, " Proposed Amendments to 10 CFR Part 73 to Protect Against Malevolent Use of Vehicles at Nuclear Power Plants," September 29, 1993.

SECY-93-270 is available in the public document room. To facilitate any comments you may have on the proposed rulemaking package, enclosed is Safeguards Information that is referenced in the preliminary draft guide.

It provides the proposed characteristics of the design basis vehicle (forwarded to you earlier),

guidance for barrier design, and guidance for blast analysis.

^D.' '% ( ?! ~

lASC 'C QQ)Q

$l**

e unews

..n.w1I E UO -

NOV 161933 Mr. E. Thomas Boulette

-2_

When the draft guide is formally issued, it will be forwarded to licensees through normal distribution without the enclosed Safeguards Information. The l

Safeguards Information will be updated and forwarded to licensees after i

publication of any final rulemaking, if necessary.

l Sincerely, Originalsigned by L. J. Callan Acting Associate Director for Projects Office of Nuclear Reactor Regulation

Enclosure:

[

Safeguards Information cc w/o enclosure:

l See next page IllSTRIBUTION w/o enclosure:

Docket File NRC & Local PDRs 6

PDI-3 Reading WButler REaton Q

Stittle i-V.

l OFFICE PDIrhLA PDdh/

PDI-3:0 Ak NAME S1Ake REttoNdt WButler Ldaklan DATE ll/iD/93 11/l0/93 11/10 /93 ll//T/93 0FFICIAL RECORD COPY DOCUMENT NAME: G:\\RGletter.PIL i

i i

i g,, '

e 8

unus mW-

i. n encicwes, inis document is cecontroiled "

bi A

l 52 $

  • ~ ' ' ' 'o

.' s

r. /a - *; ' - :-L.i LC.L.u..,.... vi.i.ia i iUIa Mr. E. Thomas Boulette NOV 161993 When the draft guide is formally issued, it will be forwarded to licensees through normal distribution without the enclosed Safeguards Information. The Safeguards Information will be updated and forwarded to licensees after publication of any final rulemaking, if necessary.

Sincerely, j

i L.

) Callan Act fig Associate Director for Projects Office of Nuclear Reactor Regulation

Enclosure:

Safeguards Information cc w/o enclosure:

See next page i

6 v$G. hWent trane,mi'ted hrTA D Cr"'** * "*"*/C urda r'ir~ * ' " ~ ~ '

+-

g.,

Ei!iE A L..ei.~...aes!

Mr. E. Thomas Boulette Pilgrim Nuclear Power Station cc:

Mr. Edward S. Kraft, Mr. H. Vernon 0heim Vice President of Nuclear Manager, Reg. Affairs Dept.

Operations & Station Director Pilgrim Nuclear Power Station Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road RfD #1 Rocky Hill Road Plymouth, Massachusetts 02360 Plymouth, Massachusetts 02360 Mr. David F. Tarantino Resident Inspector Nuclear Information Manager U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Pilgrim Nuclear Power Station RfD #1, Rocky Hill Road Post Office Box 867 Plymouth, Massachusetts 02360 Plymouth, Massachusetts 02360 Mr. Thomas Rapone Chairman, Board of Selectmen Secretary of Public Safety 11 Lincoln Street Executive Office of Public Safety Plymouth, Massachusetts 02360 One Ashburton Place Boston, Massachusetts 02108 Office of the Commissioner Massachusetts Department of Mr. David Rouham, Director Environmental Protection Massachusetts Emergency Management One Winter Street Agency Boston, Massachusetts 02108 400 Worcester Road P.O. Box 1496 Office of the Attorney General Framingham, Massachusetts 01701-0317 One Ashburton Place Attn: James Muckerheide 20th Floor Boston, Massachusetts 02108 Chairmen, Citizens Urging Responsible Energy Mr. Robert M. Hallisey, Director P. O. Box 2621 Radiation Control Program Duxbury, Massachusetts 02331 Massachusetts Department of i

l Public Health Citizens at Risk 305 South Street P. O. Box 3803 Boston, Massachusetts 02130 Plymouth, Massachusetts 02361 1

Regional Administrator, Region I W. S. Stowe, Esquire U. S. Nuclear Regulatory Commission Boston Edison Company l

475 Allendale Road 800 Boylston St., 36th Floor King of Prussia, Pennsylvania 19406 Boston, Massachusetts 02199 Mr. Paul J. Hamilton Licensing Division Manager Boston Edison Company 25 Braintree Hill Park Braintree, Massachusetts 02184 l

_ _ _ _ _ _ _ _ _ _