Interim Deficiency Rept Re Potential Failure to Show Design Changes on Drawings Used by Newberg-Marble Hill for Erection & Insp of Structural Steel.Initially Reported on 820622. Drawings Reviewed for Conflicts.Next Rept by 821022
ML20058E935
Person / Time
Site: Marble Hill
Issue date: 07/22/1982
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, S82-15, SVP-0013-82, SVP-13-82, NUDOCS 8207300256
Download: ML20058E935 (2)


Text

,.

PUBLIC SERVICE IBJ[)lALBJ/A July 22, 1982 S82-15 S. VL Shields SVP-0013-82 Senior Vice President -

Nuclear Division Mr. James G. Keppler, Docket Nos.: STN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commissicn Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road CPPR - 171 Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On June 22, 1982, Mr. T. D. Geib of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). The primary civil contractor, Newberg-Marble Hill (NMH) was utilizing the structural steel fabri-cator's drawings for erection and inspection of structural steel.

This fabricator had gone out of business and no longer reviewed the plant designer's drawings for design changes or conflicts.

The NMH quality assurance program did not provide for this review and the potential therefore exists that a number of design changes may not be shown on drawings used by NMH production and inspection personnel to erect structural steel.

PSI has instructed NMH to review the erection drawings against the design drawings for revisions and potential conflicts for future construction activities. PSI is also presently evaluating the impact of this situation on previously erected structural steel.

This letter is intended to fulfill the requirements of an interim report as defined in 10 CFR 50.55(e). A further report will be filed on or before October 22, 1982.

If you have any questions on this report please feel free to contact me.

Sincerely, S. W. Shields SWS/SJB/bak r207300256 820722 PDR ADOCK 05000546 dub 26 $$2 S

PDR P. O. Box 190, New Washington, Indiana 47162 812. 289.3000 gg/7

B r

t SERVICE INDIANA Letter:

.J. G. Keppler July 22, 1982 S82-15 SVP-0013-82 we

'cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 J. E. Konklin J. J. Harrison l

i b

6

(

1 i

J