ML20058E756
| ML20058E756 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/02/1990 |
| From: | Hairston W ALABAMA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| IEB-89-003, IEB-89-3, NUDOCS 9011070309 | |
| Download: ML20058E756 (1) | |
Text
-
r i
' Alabama Power Company.
m, 40 inverness Center Parkway.
Post Office Box 1295 Ditmingham, Alabama 35201 Tolophone 205 868 5581 -
W. G. Hairston, lli Senior Vice President
- Nuclear Operations:
AlabamaPower November 2, 1990 Ut SOuttem electre system Docket Nos. 50-348 50-364 t
I m
U.-S. Nuclear Regulatory "ommission ATTN:
Document Control Desk ll
.Vashington, D. C. 20555 Gentlemen:
f Joseph M. Farley Nuclear Plant. Units 1 and 2 l-Potential Loss of Required Shutdown Margin During Refueling Operations (NRC Bulletin 89-03)
By letter dated January 31, 1990, Alabama Power Company provided the NRC a response to Bulletin 89-03," Potential Loss of' Required Shutdown Margin During Refueling Operations." In this submittal Alabama Power Company made severr.1 specific commitments to perform analysis, revise procedures and perform' training to avoid a potentia 1' criticality concern-when fuel l
assemblies are temporarily placed in locations other than.their final b
analyzed positions. -In an' August 23, 1990 letter the NRC concurred with the L.
proposed actions and stated that the response to Bulletin 89-03 was satisfactory. The NRC requested that-Alabama Power Company provide j
?
notification-of implementation within 301 days of.the completion of the specificiactions described-in the January'31, 1990 letter.
Alabama-Power Company has completed the actions described.in the January 31,.
1990. letter.
f
.If you have any questions,.'please advise; Respectfully submitted, a
L hv Af' E
V.~ G. Hairston,.III VGH,III/BHV mgd 26.'09
,op cc:.Mr.lS. D. Ebneter Mr.'S. T. Hoffman Mr. G. F. Maxwell ay 4
'iI.
u
5 t
.i L'
9011070309 901102 G/ -
c PDR ADOCK 05000348
[
O PDC
\\I g
/
e m
ev
- m
'+
.