ML20058E283
| ML20058E283 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 06/25/1982 |
| From: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| To: | Vassallo D Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.1.1, TASK-TM LQA8200022, NUDOCS 8207280135 | |
| Download: ML20058E283 (4) | |
Text
. -
GENERAL OFFICE N Nebraska Public Power District
" "
- fcAYs"eSA'E^M e
\\
LQA8200022 June 25, 1982 Director, Nuclear Reactor Regulation Attention:
Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
STA Qualification and Training
References:
- 1) H. R. Denton (NRC) to All Reactor Licensees letter dated March 29, 1980
- 2) J. M. Pilant (NPPD) to D. G. Eisenhut (NRC) letter dated December 30, 1980; subject, TMI Action Plan
- 3) NUREG 0737, Item I.A.l.1, STA
- 4) Recommendations for Shift Technical Advisor, INF0 Document GPG-01
- 5) J. M. Pilant (NPPD) to D. B. Vassallo (NRC) letter dated February 3, 1982; subject, STA Qualification and Training
- 6) D. B. Vassallo (NRC) to J. M. Pilant (NPPD) letter dated April 1, 1982; subject, NUREG 0737, Item I.A.1.1, Shift Technical Advisor (STA)
Dear Sir:
f The qualifications and training of five personnel who had the Shift l
Iechnical Advisor responsibility at Cooper Nuclear Station were doc-umented in reference 5.
As per a conversation at Cooper Nuclear Station between Byron Siegel and Leo Lessor we were to submit to you the qual-ifications and training of permanent replacements for individuals con-sidered as acceptable in the reference 6 letter.
Because one of these l
individuals, Robert D. Creason, has terminated employment. it is nec-l essary to add a permanent replacement.
We are thus submitting as documentation of the qualification and training of a re-placement, Ricky L. Gardner.
Effective July 14, 1982, we will be using this person as a qualified STA since he will have completed the re-quirements of our program.
8h l
8207280135 820625 PDR ADOCK 05000298 P
PDR e-
- +, - -
e
.e-n-,-
. ~ _..
Mr. Domenic B. Vassallo June 25, 1982 t
Page 2.
l If you have any. questions concerning this letter.or its contents, please contact L. C. Lessor at Cooper Nuclear Station.
Sincerely.
M. Pilant Division Manager.of Licensing and Quality Assurance JMP:LCL:cg Attach.
s
. ~ -.
Attachm:nt 1 Page 1 of 2 STA QUALIFICATION Ricky I,. Cardner (SRO-Shif t Supervisor)
Reference:
INPO GPG-01, Section 6.1.2 Hours Mathematics Hot License Training 20 College Algebra 45 College Trigonometry 45 College Analytic Geometry 45 College Calculus 45 (Required Hours - 90) 200 Reactor Chemistry Hot License Training 6
Degraded Core Recognition 8
Reactor Water Chemistry Review 3
College Chemistry 60 (Required Hours - 30) 77 Reactor Theory Hot License Training 70 STA Simulator Training 10 B'n'R Simulator Requalification Training 6
Licensed Operator Requalification Training 23 SRO Review Training 15 (Required Hours - 100) 124 Thermal Sciences Hot License Training 25 Turbine Generator /DEH 6
Hot License Review Training 8
Degraded Core Recognition 8
Heat Transfer, Fluid Flow, and Thermodynamics 72 Heat Transfer and Fluid Flow Requalification 18 (Required Hours - 120) 137 Electrical Sciences CNS Switchyard 17 Turbine Generator /DEH 10 Hot License Training 40 Startup Power Sources 2
Electrical Distribution Requalification Training 4
Systems Training Where Electrical Devices and Controls are Pertinent to System Operatten 40 (Required Hours - 60) 113
7 Attechment 1 Page 2 of 2 Hours Nuclear Instrumentation and Control Turbine Generator /DEH Control System 10 Hot License Training 50 STA Simulator Training 8
Simulator Requalification Training 4
Neutron Monitoring 8
Periodic Requalification Training (Required Hours - 40) 80 Nuclear Radiation Protection and Health Physics Radiation Safety 3
Radiation Protection 5
Hot License Training 40 Respiratory Protection 5
Gaseous Activity Release Rates 1
Radwaste Handling 3
Annual Requalification Training (Required Hours - 40) 57 Nuclear Materials Hot License Training 40 STA Simulator Training 2
Degraded Core Recognition 4
New Fuel Inspection 8
Fracture Mechanics 2
q (Required Hours - 40) 56
,