M OPERATLNG DATA REPORT DOCKET NO. 050-298 DATE February 3, 1982 COMPLETED BY P. L.

Ballinger TELEPif0NE 402-825-3811

.~

OPERATING STATUS N08'S

1. Unit Name:

Cooper Nuclear Statfon January 1982

2. Reporting Period:

2381

3. Licensed Thermal Power (MWt):

836

4. Nameplate Rating (Gross MWe):

770

5. Design Electrical Rating (Net MWe)-

787

6. Maximum Dependable Capacity (Gross MWe):

764

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Sine 2 Last Report. Give Reasons:

None

9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,If Any:

None

.h This Month Yr..to-Date Cumulative 744.0 744.0 66,529.0

11. Hours In Reporting Period T64.0 1

744.0 54,630.4

12. Number Of flours Reactor Was Critical 0.0 0.0 0.0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 744.0 744.0 53,701.5
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1.670,976.0 1,670,976.0 105,359,454.0
17. Gross Electrical Energy Generated (MWH) 556. 667.,D.

556.667.0 33.037.454.0

18. Net Electrical Energy Generated (MWH) 538,689.0 538,689.0 31,836,067.0
19. Unit Service Factor I

100.0 100.0 80.7

20. Unit Availability Factor

/

100.0 100.0 89.7 94.8 94.8 62.6

21. Unit Capacity Factor (tIsing MDC Net) l
22. Unit Capacity Factor (18 ing DER Net) 93.1 93.1 61.5 s
23. Unit Forced Outage Raie 0.0 0.0 3.9
24. Shutdowns Scheduled t}ver Next 6 Mo g(Type.Date,and Duration of Eacht:

I Refunlinn_ mv ??_ 19A?. 4 venkn i 2

l

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed 4

INITIA L CRITICALITY q

INITIAL ELECTRICITY g

l COMMERCIAL OPERATION l

OfI 8203190430 820206

("C7 3 PDR ADOCK 05000298

\\

,R PDR

DOCKET NO. 050-298 UNIT SilU1 DOWNS AND POWER REDUC 110NS UNIT N AME Cooper Nuclent Stat'.

DATE Feb rir try 1.

19g2 COMPLETED RY P.

Y_

pallinen,.

REPORT MONTli January TELEPHONE 402-825-3811' n.

E e

3?

3

$ $3 Licensee

[-t, j"'.

Cause & Corrective 8

Action to No.

Date i

3g i

2j5 Event g

go

$E 5

5 f, g Repor e mU Prevent Recurrence o

v Q

NA NA NA Received RR "B" motor bearing hi/ low

[

82-1 820109 S

0 A

oil alarm.

Started a planned shutdown Reduced power and tripped pump.

De-inerted and entered drywell to inspect for low /hi oil.

Found lower motor bearing low on oil and found loose fitting. Tightened loose fitting and filled lower bearing with oil.

In-spected "A" pump motor oil level.

Terminated shutdown and returned to normal operation.

[

NA NA NA Reduced power to adjust control rod 82-2 820131 S

0 H

pattern.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event ReporI (LER) File INI titi G-D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F Administrative 5

G-Operational Error (Explain)

Exhibit I Same Source p)/77)

Il-Other (Explain) i n

i i

y

{

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

050-298 UNIT Cooper Nuclear Stat.

DATE February 3, 1982 COMPLETED BY P. L. Balling ~r e

402-825-3811 TELEPflONE MONTil J nuary DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 758 1

474 g7 2

676 gg 768 771 3

742 g9 757 770 4

20 5

732 21 769 767 762 22 6

64 766 7

23 760 8

756 24 9

508 25 767 575 10 26 767 704 769 II 27 12 716 28 772 766 13 756 29 14 769 30 749 769 563 15 3

16 768 INSTRUCTIONS On this format. list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

~

f f

e 0'HLV $$:

5 c-f.'Lh4

.)te,://Ah, p,,,

G.

Dun.,- se(I v,

OPERATIONS AATIVE COOPER NUCL, N STATION January 19P7 Operated,the month of January at a capac.ity factor of 93.1%.

During the seek of January 3, received periodic alarms on Recirc. Pump "B" motor high/ low oil level.

On January 9, 1982, started a planned shutdown to

~ ~ ~ ~ ~ ~

investigate problem.

Drywell was de-inerted and entered at a reduced power level to inspect oil level.

Found lower bearing low on oil and found a loose fittin' leaking oil on test line. Tightened loose fitting and filled bearing with oil.

Terminated shutdown plans.

Inspected "B" pump motor oil level and returned to normal power operation condition.

Power was reduced on January 31, 1982 to adjust the control rod pattern.

+