ML20058D970
| ML20058D970 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 07/09/1982 |
| From: | John Miller NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20058D981 | List: |
| References | |
| NUDOCS 8207270457 | |
| Download: ML20058D970 (2) | |
See also: IR 05000010/1982008
Text
{{#Wiki_filter:, . .. . >
IE HQ FILE COPY JUL 0 01332 Docket No. 50-10 Docket No. 50-237 Docket No. 50-249 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen: This refers to the routine safety inspection conducted by Mr. C.C. Peck of this office on June 16, 17, 21, and 25, 1982, of activities at the Dresden Nuclear Power Station, Units 1, 2 and 3, authorized by NRC Licenses No. DPR-02, No. DPR-19 and No. DPR-25 and to the discussion of our findings with Mr. Scott and others of your staff at the conclusion of the inspection. The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and in- torviews with personnel. No items of noncompliance with NRC requirements were identified during the course of this inspection. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the l NRC's Public Document Room. If this report contains any information that you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele- phone within ten (10) days from the date of this letter of your intention to file a request for withholding; and (b) submit within twenty-five (25) days from the date of this letter a written application to this office to withhold such information. If your receipt of this letter has been delayed such that less than seven (7) days are availabic for your review, please notify this office promptly so that a new due date may be estab- lished. Consistent with Section 2.790(b)(1), any such applicction must CM sl Teo6
l l 8207270457 820709 PDR ADOCK 05000010 , O PDR
' .o Commonwealth Edison Company 2 JUL 0 91982 be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons which are the bases for the claim that the information should be withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, a copy of this letter and the enclosed inspection report will be placed ir: the Public Document Room. We will gladly discuss any questions you have concerning this inspection. Sincerely, Orisinal % ped by J. R. Nii!;r J. Miller, Chief Technical Inspection Branch Enclosure: Inspection Reports No. 50-10/82-0 8(DETP) , No. 50-237/82-12(DETP) and No. 50-249/82-13(DETP) cc w/ enc 1: Louis 0. Dc1 George, Director of Nuclear Licensing D. J. Scott, Station Superintendent DMB/ Document Control Desk (RIDS) Resident Inspector, RIII Karen Borgstadt, Office of Assistant Attorney General \\, l .' RI RITI RIII / ', R1R [[ 7k 13 = Te /sv reger Walker -Miller ' , m 82 y~ y y +. , \\ }}